African Flight Procedure Programme (AFPP)

Quality Assurance

For Instrument Flight Procedure

Implementation

Nairobi, Kenya – 3-6 November 2015

Frédéric Legrand, Manager, African Flight Procedure Programme

AFPP

� PBN concept

� ASBU system

� PBN concept advantages

� PBN implementation stakeholders

� PBN implementation documentation

� PBN National Plans status

� 2010, ICAO Resolution A37-11, PBN implementation

� PBN approach procedures implementation status in African States

� PBN SIDs and STARs implementation status in African States

� PBN procedures implementation status in African States

� ICAO-AFPP/AFCAC PBN Survey, May 2015

Quality Assurance, instrument flight procedures implementation 2

Summary

AFPP

3

PBN concept

PBN CONCEPT ESTABLISHED IN 2008

Quality Assurance, instrument flight procedures implementation

�Area navigation based onperformance requirements foraircraft operating along an ATSroute, on an instrumentapproach procedure or in adesignated airspace. (ICAO Doc9613)

AFPP

4

PBN concept

The implementation of

Performance-Based Navigation,

or PBN, is presently the global

aviation community’s highest

Air Navigation priority.

Quality Assurance, instrument flight procedures implementation

AFPP

5

PBN Concept

THE CONCEPT IS MATURE

TODAY

Quality Assurance, instrument flight procedures implementation

AFPP

6

ASBU

It is key to the implementation of

ICAO’s Aviation System Block

Upgrades (ASBU).

Quality Assurance, instrument flight procedures implementation

AFPP

7

ASBU

Quality Assurance, instrument flight procedures implementation

AFPP

8

ASBU

Quality Assurance, instrument flight procedures implementation

AFPP

9

2013

ASBU

Quality Assurance, instrument flight procedures implementation

AFPP

10Assurance Qualité, Mise en œuvre procédures de vol

2013

2018

2023

ASBU

AFPP

11

PBN concept advantages

Quality Assurance, instrument flight procedures implementation

PBN BENEFITS

REDUCES

ENVIRONMENTAL

IMPACT

IMPROVES

SAFETY

IMPROVES

OPERATIONAL

EFFICIENCY

INCREASES

AIRSPACE

CAPACITY

REDUCES

INFRASTRUCTURE

Reduces CFIT

Consistent and predictable paths

Stabilized approach paths

Reduces time in flight

in more direct routes

Reduces fuel costs

Reduces investment in ground-based systems

More efficient direct routes

Reduces airspace conflicts

Reduces fuel consumption

Less CO2 gas emissions

AFPP

12

PBN concept advantages

Performance Based CapabilityPerformance Based Capability

ACCURACY AVAILABILITYINTEGRITY CONTINUITY FUNCTIONALITY

Quality Assurance, instrument flight procedures implementation

AFPP

13

PBN implementation involves many

different stakeholders and processes

from airborne equipment to airspace

infrastructure development.

PBN implementation stakeholders

Quality Assurance, instrument flight procedures implementation

AFPP

14

� Participants involvedin an instrument flight procedureimplementation

Quality Assurance, instrument flight procedures implementation

PBN implementation stakeholders

AFPP

15Quality Assurance, instrument flight procedures implementation

PBN implementation documentation

• All activities are determined in reference to ICAO regulations and PBN

documents

o Doc 8168 Aircraft Operations (vol 2, construction of flight procedure)

o Doc 9613 PBN Manual

o Doc 9674 World Geodetic System Manual

o Doc 9859 Safety Management Manual

o Doc 9881 Guidelines for Electronic Terrain, Obstacle and Aerodrome Mapping Information

o Doc 9905 Manual for RNP-AR procedure design

o Doc 9906 Quality Assurance Manual for Flight Procedure Design (quality assurance

system, procedure designer training, software validation, procedure design construction,

procedure validation, pilot training and evaluation)

o Doc 9931 Continuous Descent Operations (CDO) Manual

o Doc 9992 Manual on Use of PBN in Airspace Design

o Doc 9993 Continuous Climb operations (CCO) Manual

o Doc 9997 PBN Operational Approval Manual

AFPP

16

PBN National Plans status

Quality Assurance, instrument flight procedures implementation

Cabo Verde

Nile

20°

Seychelles

Mauritius

20°

Reunion

Senegal

Algeria

Libya Egypt

Tog

o

Gha

na Nigeria

DRC

Ethiopia

Rwanda

Kenya

Tanzania

Botswana

Uganda

South

Africa

Morocco

Tunisia

Malawi

ZimbabweNamibia

Niger

Mali

Sierra

Leone

Gabon

Cameroon

Swaziland

Pending

Yes

No

Data issued by ICAO Regional Offices, States,

and AFCAC/ICAO Survey, May 2015

Côte

d’Ivoire

AFPP

17

Resolution A37-11 : Global objectives for performance based navigation

2010, ICAO Resolution A37-11PBN implementation

Quality Assurance, instrument flight procedures implementation

AFPP

18

0

10

20

30

40

50

60

70

Africa

2010 Target

2014 Target

2016 Target

% 0

f C

ou

ntr

ies

me

eti

ng

Ta

rge

t

30%

Runways

70%

Runways100%

Runways

Assembly Resolution A37-11 on PBN Implementation

RNP Approach

Quality Assurance, instrument flight procedures implementation

2010, ICAO Resolution A37-11PBN implementation

AFPP

19

AFI REGION – PBN Instrument Approaches

PBN approach procedures implementation statusAfrican States

Quality Assurance, instrument flight procedures implementation

AFPP

20Quality Assurance, instrument flight procedures implementation

PBN approach procedures implementation statusAfrican States

AFPP

21

PBN SIDs and STARs implementation statusAfrican States

Quality Assurance, instrument flight procedures implementation

AFPP

22

PBN flight procedures in ESAF area

PBN flight procedures in WACAF area

� International airports

� PBN approach procedures, SIDs and STARs implementation

Quality Assurance, instrument flight procedures implementation

PBN procedures implementation statusAfrican States

AFPP

23

ICAO-AFPP/AFCAC PBN Survey

� ICAO-AFPP/AFCAC PBN Survey, May 2015

� Information about National PBN Plan development

o Challenges impeding development

o Assistance requested

� Flight procedures implementation

o Conventional

o PBN

� Flight procedures implementation oversight service

o Design

o Approval

� ICAO State Letter, November 2016

Quality Assurance, instrument flight procedures implementation

Thank You