Amy / Sales Manager

CONTENTS

Technology1

USCG Progress2

Reference3

Headway Group

Group

Bio Enterprise Co., Ltd.

Advanced Optronic

Devices (China) Co., Ltd.

Zhoushan IN Marine

Engineering Co., Ltd

Shanghai Baway

Technology Co., Ltd.

North Ship & Ocean

Engineering Co., Ltd.

Qingdao Headway

Technology Co., Ltd.

Headway products

Automation

Navigation

Environment

BWMS Sewage Water Treatment system

ODME EXAUST Gas Treatment Device

VDR ECDIS BNWAS LOG

WIAS Dewatering System

ProductRange

Factory area19500㎡

Headway Factory

Completion timeDec 2016

Production capacity2000 sets/year

OceanGuard BWMS

Ballast

Filtration + AEOP

Deballast

Direct Discharge

Patent no: PCT/CN2008/070783

·Special semiconductor materials

· Hydroxyl radicals (·OH) formed

· Destroy the membrane of organism

Technology

AEOP - Advanced Electrocatalysis Oxidation Process

·OHElectro-catalysis reactions Anode surface: H2O + h+ →·OH + H+①Cathode surface: O2 + e- → ·O2

- ②The overall reaction equation: O2+2H2O====4·OH

Advantage

effected by temperature

CHEMICAL Cl2effected by

salinityeffected by

turbidity

corrosionH2

Advantage

On line Sterilization

small footprint

one waytreatment

less maintenance

Lowerpower

CONTENTS

Technology1

USCG Progress2

Reference3

Start from June.2014 in

DHI Lab

Finish Land based test in

May.2015

Finish Environment test Jul 2016

Submit Final Approval end

2016

USCG Process

CMFDA

DNV-GL supervises and review system's operation during land based testing.

USCG Final Type Approval

Start of shipboard testing.

USCG Final Type Approval

USCG Upgrading

Version A - Candle Type Version B - Screen Type

Filter TEST BASE

ZHOUSHAN

CONTENTS

Technology1

USCG Progress2

Reference3

Reference List

01

03

04 02

Contracted Delivered

CommissionedRegular use

1300 sets / 630vsl 830sets / 416vsl

450sets / 220 vsl100sets / 50vsl

Greece Europe US Asia SHIPYARD

Reference List

Page 26Retrofit Procedure

Delivery- 3

months

Vessel Type Installation Time BWTS Class

37,500Tanker 2014 HMT-600Exx2 DNV

Retrofitting Projects

Vessel Type Installation Time BWTS Class

205,000BC 2014 HMT-3000x2 ABS

Retrofitting Projects

Vessel Type Installation Time BWTS Class

Bulk Carrier 2015 HMT-1000x2 DNV

Retrofitting Projects

Vessel Type Installation Time BWTS Class

Tanker 2014 HMT-2000EX x 2 + HMT-300 CCS

Retrofitting Projects

Vessel Type Installation Time BWTS Class

Container 2016 HMT-600 ABS

Retrofitting Projects

Vessel Type Installation Time BWTS Class

VLOC 2014 HMT-4000x2 LR

Retrofitting Projects

Page 26Retrofitting Projects

Thank you!

Qingdao Headway Technology Co.,Ltd4/F, Bldg# 5,Area A, Huite Industrial City,No.177,Zhuzhou Road, Qingdao, China. 266101Tel: (86) 532 8310 7818Fax: (86) 532 8310 7816Email: sales@headwaytech.comWeb: www.headwaytech.com