PT SURYA UTAMA PUTRA, Established 2009, located in ......PT SURYA UTAMA PUTRA, Established 2009,...

Preview:

Citation preview

PT SURYA UTAMA PUTRA, Established 2009, located in Rancaekek industrial area, Bandung, west java. Total area 8.200 m2, building area is 3.240 m2 and marketing area 300 m2.Consists of resources that are competent, expert, young, creative, innovative and always following technology developments.

About PT.Surya Utama Putra

I S O

S N I

T K D N

RAW MATERIAL

Certification

W W W. S U R Y A U T A M A P U T R A . C O M

PT SURYA UTAMA PUTRA - PRODUCT( Indonesia PV Manufacture & Applications )

• Design manufacture • Solar Panel• LED DC/AC lamp• Lithium Battery• Aplication of Solar panel, LED and

Battery • Training center• Service center

SUPPLIERFACTORY SELECTION

QUALITY CONTROL RAW MATERIAL WHEN PURCHASETRANSPORTASION METHODE

QUALITY CONTROL RAW MATERIAL AT SUP FACTORYIMPLEMENTASI ON ISOPRODUCTION PROCESS

PACKAGING AND SHIPMENTINSTALLATION

OPERASIONAL AND MAINTENANCE

EFFISIENCY IN ONE CYCLE

QUALITY = EFFISIENCY

PRODUCTION ROOM

SOLAR PVDC/ACLAMP

SOLAR PVBATTERY

PT SURYA UTAMA PUTRA - PRODUCT( Indonesia PV Manufacture & Applications )

• Training center• Service center

PT SURYA UTAMA PUTRA – OUR PRODUCT( Indonesia PV Manufacture & Applications )

Customers

PT. Perlinas Energi Utama

PT. Daya Hasil Bersama

PT. Mahakam Lembu Mulawarman

PT. Pri Yaka Karya

PT. Karya Satria Putra

PT. Maharani Citra Nusa

PT. Indo Sultra Perkasa

PT. Uniteknindo Inti Sarana

CV. Wilis Fhylosopia

PT. Global Pratama

PT. Prass

PT. Quds Rabbani

CV. Adonara Putra TEknik

CV. Surya Timor Perdana

PT. Dua Sekawan

PT. INTI

PT.SEI

PT. TML

PT. GMN

PT. Wijaya Karya Energi

KALIMANTAN

Site Tana Tidung ( SHS )Site Berau ( PATS )

( SHS )( PJU )

Site Kaltim ( SHS )( PLTS )

Site Nunukan ( PLTS )( PJU )

Site Balikpapan ( PLTS)

JAKARTA

Jakarta ( PLTS CCTV )Jakarta ( PLTS )Jakarta ( SHS )Tangerang ( PLTS )Cilandak ( PLTS )

PORTOFOLIOSURYA UTAMA PUTRA

Cianjur ( SHS )Bandung ( PJU )

Ciamis ( SHS )Cimahi ( PJU )

Tasikmalaya ( SHS )

JAWA BARAT

SUMATERA

Kepahiang, Ogan Ilir, Landak ( SHS )

Batam ( SHS – 80 Wp )( SHS – 80 Wp )

BATAM

MALUKU BARAT DAYA

Maluku Barat Daya( PLTS 200 Wp )

SULAWESI

Majene, Mamuju, Parigi Moutong, Buol dan Pahuwato

( PLTS )

PORTOFOLIO

W W W. S U R Y A U T A M A P U T R A . C O M

PORTOFOLIO

W W W. S U R Y A U T A M A P U T R A . C O M

MARKET OPPORTUNITY

Preface : INDONESIAN ARCHIPELAGO

Indonesia have 17.504 Island

TARGET OF ENERGI MIX UP TO 2025

NEW RENEWABLE ENERGY TARGET

SOLAR ENERGYCAPACITY TARGET

2025 : 6.379 MW2050 : 45.000 MW

NEW RENEWABLE ENERGY TARGET

SOLAR ENERGYCAPACITY TARGET

2025 : 6.379 MW2050 : 45.000 MW

To reach 6.5 GWpin the next 5 years, it takes 1 GWp per year

Then capital is neededAround USD 1.2 Billion on Grid / hybrid application

*Assumption 1 USD/Wp and average within 5 years

PT SURYA UTAMA PUTRA TARGET IS 10% or Around 120 Million per year*

• CENTRALIZED SOLAR POWER PLANT (Hybrid)• ESS ( ENERGY STORAGE SYSTEM )• ROOFTOP ON GRID or Hybrid• Other PV Applications including E-Motor and E-

Car supporting facility.

EXCELLENT PROGRAMS

( to achieved the target )

Warranty 5 years and extended another 5 years( including maintenance & Monitoring )

SAMPLE SIZE PROJECT

• HYBRID APPLICATION• Main ( PV + ESS ), 24 x 7

• Optional Genset• CAPACITY PV 5 MWp and ESS 15 MWh• MULTI LOCATION OUTSIDE JAVA ISLAND ( Remote Area )• WARRANTY & PERFORMANCE SYSTEM FOR 5 + 5 YEARS

( including maintenance & monitoring )• PROJECT VALUE AROUND USS 30 Million

( include design, supply, insurance, shipment, installation, commissioning, training, maintenance, spare part & engineer )

WELCOMEStrategic partner For

Technology & Investment

TOGETHER WE MAKE IT EXCELENCE

Thank you

Recommended