New Ringgold Middle School

Project SlideshowFebruary 25, 2017

Aerial Photo from East

Provided by Hudson Group – Taken 2.20.2017

Aerial Photo from Southeast

Provided by Hudson Group – Taken 2.20.2017

Aerial Photo from South

Provided by Hudson Group – Taken 2.20.2017

Aerial Photo from Northwest

Provided by Hudson Group – Taken 2.20.2017

Aerial Photo from North

Provided by Hudson Group – Taken 2.20.2017

Building Areas

Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – Kitchen - Area A

Masonry Installation – Kitchen - Area A

Masonry Installation – Kitchen - Area A

Masonry Installation – Area A

Brick Installation – Area A

Bulkhead Framing - Cafeteria – Area A

Work Progress – 1st Floor - Area A

Stud Wall Framing - 2nd Floor – Area A

Framing – Radius – Area A

GlasRoc Installation at Radius - Area A

Work Progress – 2nd Floor – Area A

Brick Installation – Area B

Work Progress – 1st Floor - Area B

Masonry Installation – 1st Floor – Area C

Work Progress – 1st Floor - Area C

Masonry Installation – 2nd Floor- Area B

Masonry Installation – 2nd Floor- Area B

Masonry Installation – 2nd Floor- Area B

Brick Installation – Area B

Work Progress – 2nd Floor - Area B

Masonry Installation – 2nd Floor – Area C

Masonry Installation – 2nd Floor – Area C

Masonry Installation – 2nd Floor – Area C

Work Progress – 2nd Floor - Area C

Masonry Installation - Area D

Masonry Installation - Area D

Masonry Installation - Area D

Masonry Installation - Area D

Brick Installation - Area D

Work Progress – Area D

Roof Decking – Area A

Roof Installation – Area A

Bar Joist/Roof Structure Installation – Area B

Bar Joist/Roof Structure Installation – Area B

Long Spans Installation – Auditorium - Area D

Steel Detailing – Auditorium - Area D

Bar Joist Installation – Area D

Bar Joist Installation – Area D

Roof Deck Installation – Low Roof – Area D

Roof Deck Installation – Gym – Area D

Roof Progress

Continue Setting Door Frames

Window Installation – Area A

Window Installation – Area B

Window Installation – Area C

Cuts for Sleeves at Tennis Courts

Plumbing Rough In – Kitchen – Area A

Plumbing Rough In – 2nd Floor – Area A

Installation of Water Line

Installation of Water Line & Fire Hydrant

Water Lines – Fitness Center

West Penn – Installation of Permanent Power

Installation of Conduit for Telecommunications from HS to MS

Electrical Rough In – 2nd Floor – Area A

HVAC Piping Installation - Kitchen – Area A

HVAC Piping Installation – 2nd Floor - Area A

HVAC Piping Installation – 2nd Floor - Area A

HVAC Ductwork Installation – 1st Floor - Area A

Sprinkler Piping Installation – Area B

School Board Tour – February 18, 2017

• Finish Masonry Installation – 2nd Floor – Areas C• Continue Masonry Installation – Area D• Continue Brick Installation – Area B• Continue Plumbing & Electrical Wall Rough In• Parapet Framing - Fitness Center• Complete Roof Decking – Gym - Area D• Roof Decking – Auditorium – Area D• Continue Roofing – Area A • Roofing - Fitness Center• Continue Stud Wall Installation• Continue Window Installation – Area A, B & C• Continue Door Frame Installation• Continue HVAC Piping Installation – 1st Floor - Areas A, B, & C• Continue HVAC Ductwork Installation• Sprinkler Piping Installation – Area A, B & C• Site Concrete – Loading Dock

Scheduled Work for Next Few Weeks