Project:

Project Scope:

Highlights:

• Total D em olition of one half existing parking structure

w hile other half w as still in use.

• 4 story post tension concrete rem oval

• Project required extensive engineering for safe dem olition

of post tension structure.

• D em o m akes w ay for future Sound transit tunnel

• Total dem olition of 80 ,000+ SF

• Extensive engineering for safe dem o

• 3 w eek tim etable over 2 m ajor holiday breaks

• Project com pleted on tim e on budget.

• Zero in jury’s • Com pleted w ithout any incidents on site and surrounding

businesses.

•Recycled 6 ,000+ tons of m aterial

•Peak crew size of 10

•Installed A scendent shoring system

•100% com pleted w ith A scendant assets.