Project:
Project Scope:
Highlights:
• Total D em olition of one half existing parking structure
w hile other half w as still in use.
• 4 story post tension concrete rem oval
• Project required extensive engineering for safe dem olition
of post tension structure.
• D em o m akes w ay for future Sound transit tunnel
• Total dem olition of 80 ,000+ SF
• Extensive engineering for safe dem o
• 3 w eek tim etable over 2 m ajor holiday breaks
• Project com pleted on tim e on budget.
• Zero in jury’s • Com pleted w ithout any incidents on site and surrounding
businesses.
•Recycled 6 ,000+ tons of m aterial
•Peak crew size of 10
•Installed A scendent shoring system
•100% com pleted w ith A scendant assets.
Bellevue E340 Garage- Bellevue, WA
(253) 939-4375ascendentdemo.com