View
3
Download
0
Category
Preview:
Citation preview
MINISTRY OF EDUCATION, SCIENCE AND TECHNOLOGY - PHYSICAL FACILITIES STANDARDS SECTION
PRINT SET FOR OUT DOOR KICHEN
PRIMARY SCHOOL DESIGN GUIDELINES - 2019 EDITION
OUT DOOR KITCHEN
SCHEDULE OF MATERIALS
ITEM DESCRIPTION QTY UNIT PRICE AMOUNT
A SUB-STRUCTURE- PROVISIONAL
1Strip Foundation footing grade 7 insitu plain
concrete 3cu.m
cement 50kg 8.00 bags
sand (lorry 4.5m³) 0.47 trip
aggregate ³̸₄" (lorry 4.5m³) 0.94 trip
(100mm thick Over site concrete) Plain
insitu concrete grade "15" to concrete
bed
cement 50kg 23.00 bags
sand (lorry 4.5m³) 0.69 trip
aggregate (lorry 4.5m³) 1.39 trip
Timber for formwork 1" x 8" L-3.6m 10.00 pcs
2 Foundation walls
6" cement & sand block 9m² 81.00 No
3 Mortar (1:6)
cement 50kg 2.00 bags
sand (lorry 4.5m³) 0.10 trip
4 Filling, Hardcore & site sterillization
100mm thick filling Sand/Morum (lorry
4.5m³)1.54 trip
150mm thick Hardcore 54sqm (lorry 4.5m³) 18.67 trip
Adrin solution to hardcore bed 8.00 litres
Adrin solution around foundations 1.71 litres
5 Plaster to Plinth (1;4)
Cement 2.00 bags
Sand (lorry 4.5m³) 0.10 trip
Painting to plinth;
Black bitumen @ 4litres 1.00 tin
Solvent 1.00 litres
Sub total for Sub structure
B SUPER STRUCTURE
1 Walling: 24m²
150mm thick blockwork
SCHEDULE OF BUILDING MATERIALS FOR THE CONSTRUCTION OF KITCHEN, STORE AND TOILET
STRUCTURE;
ITEM DESCRIPTION QTY UNIT PRICE AMOUNT
6" Cement & Sand blocks 216.00 No
DPC (20m long x 1m wide) 6.00 m
2 Morter (1:6)
Cement 3.00 bags
Sand (lorry 4.5m³) 0.20 trip
3 Galvanised steel pipe
100mm diameter Gs pipe @ 20ft long 9.00 pcs
200 x 200 x 5mm Base plate 18.00 pcs
100 x 100 x 5mm Base plate 18.00 pcs
20mm diameter bolt 18.00 pcs
Sub total for Super structure
C ROOF STRUCTURE & COVERING
1 Roof structure
Timber (treated softwood) 2" x 4" L=3.6m
,Tie beam, king post, Rafter, Struts,wall plate70.00 pcs
Timber (treated softwood) 2" x 3" L=3.6
parlins25.00 pcs
Timber (treated softwood) 1" x 10" L= 3.6
fascia board23.00 pcs
Nails 5" 30.00 kg
Nails 4" 20.00 kg
Nails 3" 3.00 kg
2 Roof covering
Roof Nails 7.00 packet
30G Ridge cap 6.00 pcs
28G IT5 resincoated sheet L-m 106.00 m
Sub total for Roofing
E FINISHING
1 Plastering 41m²
Cement 5.00 bags
Sand (lorry 4.5m³) 0.50 trip
2 Floor ( 1:4)
Cement 20.00 bags
Sand (lorry 4.5m³) 0.50 trip
3 Skimming 41m²
White cement 40kg 2.00 bags
ITEM DESCRIPTION QTY UNIT PRICE AMOUNT
Emulsion paint white 20L 1.00 bucket
Sub total for Finishing
4 Painting & Decoration
Silky Paint 20L 1.00 bucket
Bitumen paint 4L 1.00 tin
Black oil paint 4L (skirting and to metal
work)2.00 tin
Weather guard 20L 1.00 bucket
Emulsion paint white 20L 1.00 bucket
Solvent 5L 1.00 litre
Roller brush 2.00 pcs
Brush 3" 2.00 pcs
Brush 4" 2.00
Sub total for Painting and Decoration
F WINDOWS
1
Supply and fix Aluminum Windows 2mm
thick frame with 5mm thick glass,
Mosquito gauze, ironmongeries and its
necessary accessories.
600 x 600mm 2.00 No
Sub total for Window
G DOOR
2
Matchboarded doors; 45 x 135 tiles, bottom
and top rails; 2 No 30 x 135 intermediate
rails; 95 x 15 thick rebate jointed vertical
covering one side; 800 x 2045mm
710 x 2055mm 2.00 No
3Frame (hardwood),Varnish,Glass &
Burglar bar
800 x 2140mm 2.00 No
Clear varnish 4L 1.00 tin
ITEM DESCRIPTION QTY UNIT PRICE AMOUNT
Solvent for Varnish 5L 1.00 gallon
H Iron MongeriesToilet indicator locks; union 1.00 No
Brass hinges -100mm 3.00 pairs
Barrel bolt 150mm 2.00 No
Sub total for Door
IELECTRICAL INSTALLATION & AIR
CONDITIONING
Wiring for lights; 1.5mm2 twin cable; to
blockwork ;background
Final sub-circuit comprising:
2No. Switch points 1 No
8No. Light points
Fittings and accessories
Batten fluorescent light fitting;
type APBR/265;40W twin; 1200mm long 8 No
Light switch; 6 Amps; one -way; one gang;
flush mounted2 No
Sub total for Electrical Installation
K.
Waste pipework; HDPE PN 6 (CLASS b)
,ISO 4427 pipes and fittings in the
running lenth
40 diameter; plug to wall; standard
holderbats3.8 m
Ditto;in hardcore 1 m
Extra; elbow/bend 2 No
Ditto;nipple 1 No
Precast concrete gully trap including
building in concrete surrounds1 No
ITEM DESCRIPTION QTY UNIT PRICE AMOUNT
Soil pipe work;HDPE PN 6 (CLASS b) ,ISO
4427 pipes and fittings in the running
lenth
p' trap; deep seal, bed in concrete floor; 100
diameter1 No
Extra; W.c. connector; 300 long 1 No
100mm Pipe with pipe clips plugged and
screwed to blockwork3 m
Extra;Copper wire balloon,top 100mm pipe
including mosquito gauze.1 No
Cold water service pipework; galvanised
mild steel piping B.S.1387; screwed and
socketted joints as described in the
running length
20 Diameter;plug to wall; standard
holderbats5 m
Extra; bends 12 No
Extra; equal tee 3 No
Cold water service
pipework;prolypropelene pipes (pp)
works and fittings (fusion jointing) PN 12
including all necessary fixing accessories.
20mm Diameter in trench 20 m
PLUMBING INSTALLATIONS (Cont'd)
Extra; bends 4 No
20 Diameter;chased in walls. 13 m
Extra; bends 4 No
Extra; equal tee. 8 No
Extra; nipple 1 No
ITEM DESCRIPTION QTY UNIT PRICE AMOUNT
15mm Copper pipe tail to BS 659, 300mm
long and connection to fitting and supply2 No
Supply and fix sanitary fittings
Hand wash basin, as Armitage shanks no.
4179, 2No. Brackets No. S.1724 concealed
hangers and no. 700 Domex screws; waster
No. 400; 2 No. ops hooks and pillar taps No.
A 1030;bottle trap; joints to water piping
1 No
760 x 760 x 205mm white glazed fireclay
shower tray; comprising 12mm chromium
plated shower mixer,angle shower arm and
showerhead with swivel joint 38mm slotted
strainer waste and 38mm P-trap with
75mm seal
1 No
Washing slab. Reinforced concerete
grade "20"
Walling as describe; in cement sand
mortar (1:4)
150 thick walls - 2sqm
cement 50kg 3 bag
sand (lorry 4.5m³) 0.04 trip
aggregate ³̸₄" (lorry 4.5m³) 0.08 trip
In-situ wall finishings
15 thick two coat plasterwork; to walls -
5sqm
cement 50kg 1 bag
sand (lorry 4.5m³) 0.03 trip
Reinforcement
Rolled mild steel bar; 8 diameter in only
location8 pcs
WC suite "Eastern type"; complete;
comprising viterous china pan, flush pipe, 9
litre capacity cistern with ball valve, syphon
and overflow outlet, operating handle, wall
hooks and joint to soil pipes; setting pan
1 No
ITEM DESCRIPTION QTY UNIT PRICE AMOUNT
Formwork to reinforced in-situ concrete
1" x 8" 6 pcs
Shower fittings; Bricon 683/122/070 or
equal and approved; chromium plated; 15 x
85 diameter shower rose; 15 diameter wall
bracket; fixing to backgrounds requiring
plugging
1 item
Bib taps; B5 1010; chromium plated; back
plate elbow; joints to pipes; 20 diameter
straight tap connector
1 item
Stop cocks; B5 1010 Chromium plated;
joints to pipes; 20 diameter; both ends
screwed femal iron
1 item
Sub total for Plumbing Installation
TOTAL
LABOUR CHARG 20%
ALLOW 5% FOR TRANSPOTATION
ALLOW 3% FOR SUPERVISION
- Grand total
OUT DOOR KITCHEN
ARCHITECTURAL AND STRUCTURAL DRAWINGS
3,000 3,000 2,000 3,200
150 3,050 150
150
2,25
015
01,
950
150
1,05
015
01,
050
150
600
2,40
060
090
060
02,
400
600
550
2,000
560
1,73
0
1,70
015
0
2,31
979
5
150 1,400 150 1,500 150
A
A
KITCHEN UNIT
KITCHEN UNIT
STORE
STAFF TOILET &CHANGING ROOM
40mm thk floor screed
100mm thick Floor concrete 1:3:6
150mm thick Hardcore
300mm thick concrete slab.
230mm thick Foundation Wall
230 x 690mm Foundation footing 1:3:6
SECTION A - AScale 1:100
28G Ridge caps/Valleys
28G Roofing sheets
50 X 75mm Purlins
50 X 100mm Common Rafters
50 X 100mm Kingposts
50 x 75mm Struts
50 X 100mm 150mm Tie beams
50 x 100mm Wall plates
50X50 mm Branderings at 600mm c/c
15mm thick Gypsum ceiling board.
FLOOR PLANScale 1:100
Date: JULY 2019SCALE: 1:100 PHYSICAL FACILITIES SECTION
DRAWING: SDP/ARCH/DH/04BUILDING :
DRAWING:
OUTDOOR KITCHEN
PLAN AND SECTION
MINISTRY OF EDUCATION,SCIENCE AND TECHNOLOGY PRIMARY SCHOOL DESIGN GUIDELINES 2019 EDITION
3000 3000
2000
200 200
1000 1000 1000 1000 1,000 1000 1000 1,0004
001
00
40
0
13
509
00
13
50200 200
900 200200 2,600 200200 2,600
3000 3000
60
02
,400
60
03
600
1100
7330
2000
22
30
FALL 1;30FALL 1;30FALL 1;30 FALL 1;30
SECTION A-A
LAYOUT PLAN
FLOOR40mm CEMENT SCREED100mm CONCRETE SLAB150mm BLINDED HARDCORE
SECTIONAL / ELEVATION B-B
NOTESROOF COVER 28 G GALVANIZED CORRUGATED IRONSHEETSPURLINS 50 X 75mmRAFTERS 50 X 100mmTIMBER BEAM 2/ 50 X 200mm
STEEL COLUMN 200mm DIAMETER
FLOOR40mm CEMENT SCREED100mm CONCRETE SLAB150mm BLINDED HARDCORE
BUILDING:
DRAWING:
STUDENT WASH UP
ROOF PLAN AND SECTION
MINISTRY OF EDUCATION, SCIENCE AND TECHNOLOGYPHYSICAL FACILITIES SECTION
DRAWING NO:
SCALE: 1:200 DATE: JULY 2019
PRIMARY SCHOOL DESIGN GUIDELINES 2019 EDITION
Recommended