Presented by: Gary Sweatt, CxA, QCxP. BUILD A BUILDING THAT WORKS - GET PAID FOR IT - AND GO ON TO THE NEXT PROJECT. MANAGE THE BUILDING PROCESS MANAGE THE PEOPLE INVOLVED WITH THE PROCESS IF IT DOESN’T WORK – DON’T DO IT THAT WAY!!!!. EXTREME – TO THE NTH POWER – DOCUMENTATION - PowerPoint PPT Presentation

Citation preview

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

Presented by:

Gary Sweatt, CxA, QCxP

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• BUILD A BUILDING THAT WORKS -

• GET PAID FOR IT -

• AND GO ON TO THE NEXT PROJECT.

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• MANAGE THE BUILDING PROCESS

• MANAGE THE PEOPLE INVOLVED WITH THE PROCESS

• IF IT DOESN’T WORK – DON’T DO IT THAT WAY!!!!

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• EXTREME – TO THE NTH POWER – DOCUMENTATION

• EXTRA EYES ON THE PROCESS AND THE INSTALLATION

• SPECIALIZED KNOWLEDGE – BEEN THERE, DONE THAT

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

WHAT CAN COMMISSIONING BRING TO THE PARTY?

YOU HAVE TO UNDERSTAND THE PROCESS -

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

IT’S ALL ABOUT THE

TEAM!

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• GUIDELINE 0 – THE COMMISSIONING PROCESS

• A RIGOROUS FORMAL PROCESS OF VERIFYING THAT A PROJECT MEETS THE OWNER’S REQUIREMENTS.

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• THE PROCESS HAS ALREADY BEEN DETERMINED

• DON’T WORRY ABOUT THE PROCESS

• LET THE COMMISSIONING AGENT WORRY ABOUT THAT

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• HVAC SYSTEMS

• ELECTRICAL

• ENVELOPE

• WINDOWS

• AIR BARRIER

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

ASHRAE Guideline 0-2005: The Commissioning ProcessASHRAE Guideline 0-2005: The Commissioning Process

ASHRAE Guideline 1.1-2007 HVAC&RTechnical Requirements for The Commissioning Process

ASHRAE Guideline 1.1-2007 HVAC&RTechnical Requirements for The Commissioning Process

NIBSGuideline 3-2006 Exterior EnclosureTechnical Requirements for The Commissioning Process

NIBSGuideline 3-2006 Exterior EnclosureTechnical Requirements for The Commissioning Process

Guidelines2-200X & 4-200Xthrough 14-200X Technical commissioning guidelines dealing with structure, electrical, lighting, interiors, plumbing, etc.

Guidelines2-200X & 4-200Xthrough 14-200X Technical commissioning guidelines dealing with structure, electrical, lighting, interiors, plumbing, etc.

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• OWNER’S GOALS FOR NEW FACILITY

• GUIDANCE FOR THE DESIGN TEAM– DEVELOPED BY OWNER– USER REQUIREMENTS– LIVING DOCUMENT - EVOLVES

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• DEVELOPED BY DESIGN TEAM

• FULFILLS OPR INTENT

• VERIFIED/SOMETIMES ASSISTED BY CxA

• FOCUSED DESIGN REVIEWS

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

SO! WHERE DO WE GO FROM HERE!!

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

UNDERSTAND THECOMMISSIONING

PROCESS

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

The Commissioning Process involves steps that are integrated into every phase of the project:

Commissioning is NOT

just testing at the end!

PRE-DESIGN DESIGN CONSTRUCTION OCCUPANCY & OPS

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

THE SIMPLIFIED PROCESS

• DESIGN :– WORK WITH DESIGNERS– COMMISSIONING DESIGN REVIEW – COMMENT ON DESIGN– FOLLOW UP ON DESIGN CHANGES

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

THE SIMPLIFIED PROCESS

• CONSTRUCTION - SYSTEMS– COMMISSIONING PLAN– SUBMITTAL REVIEW– PRE-STARTUP CHECKLISTS– FUNCTIONAL PERFORMANCE TESTS

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

THE SIMPLIFIED PROCESS

• CONSTRUCTION: ENVELOPE– COMMISSIONING PLAN– DESIGN REVIEW– SITE VISIT SCHEDULE (MILESTONES)– OBSERVATIONS AND TESTING

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

THE SIMPLIFIED PROCESS

• TURNOVER – TRAINING– SYSTEMS MANUAL– WARRANTIES– ACCEPTANCE– O&M MANUALS

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

THE SIMPLIFIED PROCESS

• OCCUPANCY (OPERATIONS)– WARRANTY– DEFERRED TESTING– OFF SEASON TESTING– TEN MONTH VISIT

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

IF THIS IS THE PROCESS – WHAT CAN A PROJECT MANAGER DO TO TAKE ADVANTAGE OF IT?

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• TEAM MEETINGS

• ARRANGE AN “ALL TEAM MEMBER MEETING” EARLY

• A “MEET AND GREET” MEETING– COULD BE A LUNCH MEETING– NOT A WORKING MEETING

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• COPY THE COMMISSIONING TEAM WITH ANYTHING CONCERNING THE COMMISSIONED SYSTEMS

• PROVIDE AN UP-TO-DATE CONTACT LIST

• IF POSSIBLE – PROVIDE A TELECON DIAL IN NUMBER FOR Cx TEAM USE

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• REGULAR SCHEDULED TELECONS IN THE TURNOVER PHASE

• COPY EVERYONE WITH COMMISSIONING REPORTS

• MAKE COMMUNICATION EASY

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

PROJECT RESOLUTION

• RESOLVE ISSUES AT THE LOWEST LEVEL

• RESOLVE THEM DURING INSPECTIONS IF POSSIBLE

• HANDLE Cx ISSUES IMMEDIATELY

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

MOCKUPS

• USE MOCKUPS WHERE POSSIBLE

• TRAIN DESIGNATED INSTALLERS ON MOCKUPS – THE “A” “B” AND “C” TEAMS

• DO TEST INSTALLATIONS ON HIGH QUANTITY EQUIPMENT

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• TEAM MEETINGS

• KEEP CXA IN THE LOOP

• RESPOND TO ISSUE REPORTS PROMPTLY

• SOLVE ISSUES AT THE LOWEST LEVEL

• USE MOCK-UPS

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• ONE PAGE COMMISSIONING PLAN

SUMMARY

• ONE PAGE MILESTONE LOG

• PRE-STARTUPS – FACTORY IS GOOD!

• INSPECTIONS – AS SOON AS

COMMISSIONED WORK STARTS

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

THE DELIVERY PROCESS

• ROLES AND RESPONSIBILITIES

• CHECKLIST ADMINISTRATION

• PRE-STARTUP CHECKLIST PAPERWORK

• ISSUES LOG PROCESS AND REVIEW

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• FACILITATE MEETINGS

• SET TONE FOR CX

• COMMUNICATE WITH TEAM

• DO MOCK UPS

• USE THE CxA AS YOUR CONSULTANT

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• GET CX, TAB, AND CONTROLS ON

SAME PAGE – EARLY !!!!

• REVIEW CONTROLS EARLY!

• PLAN FOR COMMISSIONING

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

• LEED – CLEAR DEFINITION OF CxA ROLE

• DON’T DELAY IN HIRING CX

• IF ENHANCED – DESIGN REVIEWS

• COMMISSIONING BY QUALIFIED CxA

• CONCURRENT SUBMITTAL REVIEW – PLAN

FOR IT

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

The Future of CommissioningThe Future of Commissioningfor Sustained Building Performancefor Sustained Building Performance Birmingham, AL 9.29.11

SERBCA Fall Conference

Building Diagnostics & Property Science5217 5th Avenue SouthBirmingham, AL 35212