89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

2012Distributor

for

Tanzania

2014Queen’s Award

for Enterprise –

International

Trade

2011Algeria

2008 Tunisia

2005Ireland

2003Acquired Cogen

India

2002First

Jenbacher

sales into

Africa

1998Australia,

New Zealand,

Nigeria

2004Acquired

Jenbacher

France

1991ISO

accreditation

1989Established in

the UK as engine

service company

2013Acquired Orient

Energy Bangaldesh,

Agaricus & GE

Southern Africa

Service

2003GE

acquires

Jenbacher

1995Jenbacher

distributor

UK 2015Cameroon

Jim Clarke

Chairman

Peter Holiday

CFO

Greg Columbus

Australasia

Didier Lartigue

France &

Francophone

Africa

Haydn Rees

UK, Ireland &

Anglophone

Africa

Anand Bhishikar

South Asia

Jamie Clarke

CEO

s.S.A. = sub-Saharan

African territories

Alan Fletcher,

Main Board

Director & Sales

Lead

34.0

29.6

19.5

6.4

5.4

2.11.6 1.3 0.0 UK

Australia

France

Nigeria

India

Bangladesh

Ireland

South Africa

Tanzania

Customer project

focused Installation design

Project management

Installation works

Commissioning

Maintenance

Parts stockholding

Product quality

focused

Engine design

Engine development

Engine manufacture

Parts production

0.1 – 5.0 MW 5 – 25 MW

TYPE 2

250 kW – 330 kW

TYPE 3

500 kW – 1 MWType 4

800 kW – 1.5 MW

Type 6

1.5 MW – 4.4 MW

Type 9

9.5 MW

VGF*

120 kW – 880 kW

VHP*

315 kW – 1.5 MW

275GL+*

1.9 MW – 3.6 MW

Power Generation

Diesel Products

228

1.5 – 3.2 MW

616

2.6 MW

250

1.5 – 4.5MW

Gas Products

Mechanical Drives

Industry

• Energy efficient captive

power plants

• Cogeneration

• Trigeneration

• Island mode operation

Biogas

• Food waste digestion

• Landfill sites

• Sewage works

Oil and gas

• Food waste digestion

• Landfill sites

• Sewage works

St Thomas’ Hospital

London, England, Natural gas

fuelled CHP (electricity, hot

water and steam), 1 x JMS620,

3MWe , Saving £1m fuel costs

and 5,500t CO2 per year