Planned Improvements for Interstate 80 Through Solano ... · rancas St ve Redwood Hagen Rd Rd 1st...

Preview:

Citation preview

Suisu

n Vall

ey R

d

Leveroni Rd

Napa St

8th S

t

Silverado Trl

Monticello RdDry Creek Rd

Wooden Valley Rd

Oak Knoll

Ave

Big Ranch Rd

Trower Ave

Jefferson St

TrancasSt

Soscol Ave

Hagen RdRedwood

Rd

3rdAv

e1st StCoombsville

Rd

Old S

onom

a Rd

Imola Ave

Airport

Rd

AmericanCanyon Rd

Shilo

h Rd

Birds Landing Rd

Pleasants

Valley Rd

Lewi

s Rd

Leis

ure

Town

Rd

VacaValley Rd

Foothill Dr Hawkins Rd

Peab

ody R

d

Binghampton Rd

Fry Rd

Elmira Rd

Merchant St

Brow

ns V

alley

Rd

Air Base Pkwy

Texas St

Texa

s St

Cement Hill Rd

Walt

ers R

d

Tabor Ave

Suns

etAv

e

Travis Blvd

Cordelia Rd

Beck

Ave

Gord

onVa

lley R

d

MankasCorner Rd

Abern

athy

Rd

OliverRd

RockvilleRd

Green Valley Rd

Ascot

Pkwy

Redwood St

Tennessee St

Springs RdSolano

Ave Benicia Rd

Lake Herma n Rd

2nd S

t

Gibson Canyon Rd

Red Top Rd

CordeliaRd

Columbus Pkwy

Marine WorldAfrica

Napa CountyAirport

Nut TreeAirport

TravisAFB

Yountville

Napa

AmericanCanyon

Vacaville

Fairfield

SuisunCity

Vallejo

Benicia

Sonoma

SearsPoint

BigBend

Schellville

Vineburg

BirdsLanding

Denverton

Montezuma

Dozier

Binghamton

CircleOaks

VichySprings

Rockville

Cordelia

NAPACOUNTY

SOLANOCOUNTY

Planned Improvements for Interstate 80Through Solano County Between Vallejo and Vacaville

Tennessee St toAmerican Canyon RdSol-80 PM 3.9 to PM 8.1Pavement Rehabilitation andInstall Median BarrierConstruction: Winter 2008 – Summer 2009

Truck Climbing LaneProjectSol-12 PM 1.5 to PM 2.8Add One Lane in the WB

Construction:Winter 2008 – Summer 2008

American Canyon Rdto 680/80 SeparationSol-80 PM 8.1 to PM 12.9Pavement Rehabilitation andInstall Median BarrierConstruction:Summer 2008 – Fall 2009

Red Top Rd to East of Air Base PkwySol-80 PM 11.4 to PM 20.1HOV Lanes andInstall Median BarrierConstruction:Spring 2008 – Fall 2009

Red Top Rd to East of Air Base PkwySol-80 PM 11.4 to PM 20.1T.O.S., Ramp MeteringImprovementsConstruction:Spring 2010 – Fall 2010

Rte 12 East to East of Air Base PkwySol-80 PM 15.4 to PM 20.1Pavement Rehabilitation

Construction:Spring 2009 – Fall 2009

East of Air Base Pkwyto Leisure TownSol-80 PM 20.1 to PM 30.6Pavement Rehabilitation

Construction:Spring 2008 – Fall 2009

DISTRICT 4 | A/V MULTIMEDIA GRAPHICS SVCS | CT1866 | 013008

Planned Improvements:Location, Descriptionand Project Timeline

Recommended