Specifications are subject to change without notice. © 2019 Mitsubishi Electric Trane HVAC US LLC. All rights reserved.
Job Name:System Reference: Date:
Outdoor Unit: 16-TON PURY-EP192YSNU-A (-BS)(Consists of Two PURY-EP96YNU-A (-BS) and One CMY-R200NCBK Twinning Kit)
UNIT OPTION Standard Model PURY-EP192YSNU-A Seacoast (BS) Model PURY-EP192YSNU-A-BS
ACCESSORIES Twinning Kit (required) CMY-R200NCBK Joint Kit for details see Pipe Accessories Submittal BC Controller (required) for details see BC Controller Submittals Low Ambient Kit for details see Low Ambient Kit Submittal Snow/Hail Guards Kit for details see Snow/Hail Guards Kit Submittal Panel Heater Kit for details see Panel Heater Kit Submittal
Specifications System Module 1 Module 2
Unit Type PURY-EP192YSNU-A (-BS) PURY-EP96YNU-A (-BS) PURY-EP96YNU-A (-BS)
Nominal Cooling Capacity Btu/h 192,000 96,000 96,000
Nominal Heating Capacity Btu/h 215,000 108,000 108,000
Guaranteed Operating Range *1Cooling (Outdoor) *2
Refer to Module Data
23~126°F (-5~52°C)
Heating (Outdoor) *3 -13~60°F (-25~15.5°C)
Extended Operating Range *4 Heating (Outdoor) -25~60°F (-31.5~15.5°C)
External Dimensions (H x W x D) In. (mm) Refer to Module Data 71-5/8 x 48-7/8 x 29-5/32 (1,818 x 1,240 x 740)
71-5/8 x 48-7/8 x 29-5/32 (1,818 x 1,240 x 740)
Net Weight Lbs. (kg) 1298 (588) 649 (294) 649 (294)
External Finish Refer to Module Data Pre-coated galvanized steel sheet (+powder coating for -BS type) <MUNSELL 5Y 8/1>
Electrical Power Requirements Voltage, Phase, Hertz
Refer to Module Data
3-phase 3-wire 460 V ±10% 60 Hz
Minimum Circuit Ampacity (MCA) A 14 14
Maximum Overcurrent Protection (MOP) A 20 20
Recommended Fuse Size A 20 20
Recommended Minimum Wire Size AWG (mm) 12 (3.3) 12 (3.3)
Short-circuit Current Rating (SCCR) kA 5 5
Piping Diameter (Brazed) (In. / mm)Liquid (High Pressure) 7/8 (22.2) Brazed
Refer to System Data
Gas (Low Pressure) 1-1/8 (28.58) Brazed
Max. Total Refrigerant Line Length Ft. 3,608
Max. Refrigerant Line Length (Between ODU & IDU) Ft. 541
Max. Control Wiring Length Ft. 1,640
Indoor UnitTotal Capacity 50~150% of outdoor unit capacity
Refer to System DataModel / Quantity P05~P96/1~48
Sound Pressure Levels dB(A) 61.5/63.0Refer to System Data
Sound Power Levels dB(A) 80.5/82.0
Fan
Type x Quantity
Refer to Module Data
Propeller fan x 2 Propeller fan x 2
Airflow Rate CFM 7,400 7,400
External Static Pressure In. WG Selectable; 0, 0.12, 0.24, 0.32 in.WG; factory set to 0 in.WG
Compressor Operating Range 7.5% to 100% Refer to System Data
Compressor Type x Quantity Refer to Module Data Inverter scroll hermetic compressor x 1 Inverter scroll hermetic compressor x 1
Refrigerant Refer to Module Data R410A 17 lbs + 10 oz (8.0 kg) R410A 17 lbs + 10 oz (8.0 kg)
Protection Devices
High Pressure
Refer to Module Data
High pressure sensor, High pressure switch at 4.15 MPa (601 psi)
Inverter Circuit (Comp. / Fan) Over-heat protection, Over-current protection
Fan Motor Over-current protection
AHRI Ratings (Ducted/Non-Ducted)
EER 12.7 / 14.1
Refer to System DataIEER 25.3 / 31.8
COP 3.66 / 3.99
SCHE 23.0 / 28.0
OUTDOOR VRF HEAT PUMP WITH HEAT RECOVERY SYSTEM
NOTES:Nominal cooling conditions (Test conditions are based on AHRI 1230) Indoor: 80°FD.B./67°FW.B. (26.7°CD.B./19.4°CW.B.), Outdoor: 95°FD.B. (35°CD.B.)Nominal heating conditions (Test conditions are based on AHRI 1230) Indoor: 70°FD.B. (21.1°CD.B.), Outdoor: 47°FD.B./43°FW.B. (8.3°CD.B./6.1°CW.B.)** Each individual module requires a separate electrical connection. Refer to electrical data for each individual module.
1. Harsh weather environments may demand performance enhancing equipment. Ask your Mitsubishi Electric representative for more details about your region
2. For details on extended cooling operation range down to -10° F DB, see Low Ambient Kit Submittal3. When applying product below -4°F, consult your design engineer for cold climate
application best practices, including the use of a backup source for heating4. Unit will continue to operate in extended operating range, but capacity is not guaranteed
Specifications are subject to change without notice. © 2019 Mitsubishi Electric Trane HVAC US LLC. All rights reserved.
Outdoor Unit: PURY-EP192YSNU-A (-BS) – DIMENSIONS
NOTES: SEACOAST PROTECTION • Anti-corrosion Protection: A coating treatment is applied to condenser coil for protection from air contaminants.• Standard: Salt Spray Test Method - no unusual rust development to 480 hours.• Sea Coast (BS): Salt Spray Test Method (JRA 9002) - no unusual rust development to 960 hours.
MEES18K087A
PUR
Y-EP-T(S)NU
-A, Y(S)N
U-A
41
2. EXTERNAL DIMENSIONS R2-Series (High efficiency)
PURY-EP192, 216, 240, 264, 288YSNU-A(-BS) Unit: mm(in)O
utdo
or u
nit 2
Fron
t vie
w
Out
door
uni
t 1
Inta
keai
r
Dis
char
ge a
ir
c
b
To B
C c
ontro
ller
aTw
inni
ng p
ipe(
Hig
h pr
essu
re)
e
To B
C c
ontro
ller
<opt
iona
l par
ts>
Twin
ning
pip
e(Lo
w p
ress
ure)
<opt
iona
l par
ts>
df
Left
view
Inta
keai
rIn
take
air
Inta
keai
r
Not
e 1.
Con
nect
the
pipe
s as
sho
wn
in th
e fig
ure
abov
e. R
efer
to th
e ta
ble
abov
e fo
r the
pip
e si
ze.
2. T
win
ning
pip
es s
houl
d no
t be
tilte
d m
ore
than
15
degr
ees
from
the
horiz
onta
l pla
ne.
Be s
ure
to s
ee th
e In
stal
latio
n M
anua
l for
det
ails
of T
win
ning
pip
e in
stal
latio
n.3.
The
pip
e se
ctio
n be
fore
the
Twin
ning
pip
e (s
ectio
n ″a
″and
″b″in
the
figur
e) m
ust h
ave
at le
ast 5
00m
m(1
9-11
/16)
of s
traig
ht s
ectio
n(*
incl
udin
g th
e st
raig
ht p
ipe
that
is s
uppl
ied
with
the
Twin
ning
pip
e).
4. O
nly
use
the
Twin
ning
pip
e by
Mits
ubis
hi (o
ptio
nal p
arts
).
Twin
ning
pip
e co
nnec
tion
size
ø28.
58(1
-1/8
)ø22.
2(7/
8)(ø
28.5
8(1-
1/8)
)*
CM
Y-R
200N
CBK
PURY
-EP19
2YSN
U-A(-
BS)
PURY
-EP96
YNU-
A(-BS
)PU
RY-EP
96YN
U-A(-
BS)
PURY
-EP21
6YSN
U-A(-
BS)
PURY
-EP96
YNU-
A(-BS
)
PURY
-EP24
0YSN
U-A(-
BS)
PURY
-EP26
4YSN
U-A(-
BS)
PURY
-EP28
8YSN
U-A(-
BS)
ø34.
93(1
-3/8
)
Low
pres
sure
d or
fHi
gh p
ress
ure
c or
eU
nit m
odel
Twinn
ing p
ipe~O
utdo
or u
nitEP
96ø1
9.05(
3/4)
EP12
0EP
144
ø22.2
(7/8)
ø28.5
8(1-
1/8)
ø28.5
8(1-
1/8)
a bHi
gh p
ress
ure
Low
pres
sure
Comp
onen
t unit
name
Out
door
uni
t 1Pa
ckag
e un
it na
me
Outd
oor T
winn
ing K
it(op
tiona
l par
ts)BC
con
trolle
r
~
Twin
ning
pip
e
Out
door
uni
t 2PU
RY-EP
120Y
NU-A(
-BS)
PURY
-EP12
0YNU
-A(-BS
)PU
RY-EP
120Y
NU-A(
-BS)
PURY
-EP12
0YNU
-A(-BS
)PU
RY-EP
144Y
NU-A(
-BS)
PURY
-EP14
4YNU
-A(-BS
)PU
RY-EP
144Y
NU-A(
-BS)
ø22.
2(7/
8)ø2
8.58
(1-1
/8)
ø19.0
5(3/4
)ø2
2.2(7
/8)
* Whe
n th
e pi
ping
leng
th is
65m
(213
ft) o
r lon
ger,
use
the
ø28.
58(1
-1/8
) pip
e fo
r the
par
t tha
t exc
eeds
65m
(213
ft).
CM
Y-R
300N
CBK
740(
29-3
/16)
1240
(48-
7/8)
1818(71-5/8)
1240
(48-
7/8)
30(1
-3/1
6)
0000005101.BOOK 41 ページ 2019年3月5日 火曜日 午後6時1分
Specifications are subject to change without notice. © 2019 Mitsubishi Electric Trane HVAC US LLC. All rights reserved.
Modules 1 and 2: PURY-EP96YNU-A (-BS) – DIMENSIONS
NOTES: SEACOAST PROTECTION • Anti-corrosion Protection: A coating treatment is applied to condenser coil for protection from air contaminants.• Standard: Salt Spray Test Method - no unusual rust development to 480 hours.• Sea Coast (BS): Salt Spray Test Method (JRA 9002) - no unusual rust development to 960 hours.
MEES18K087A
PUR
Y-EP-T(S)NU
-A, Y(S)N
U-A
37
2. EXTERNAL DIMENSIONS R2-Series (High efficiency)
PURY-EP96, 120, 144YNU-A(-BS) Unit: mm(in)
1 2 43 5 6 7 8NO.
740(29-3/16)
70(2-13/16)150(5-15/16)
85(3-3/8)85(3-3/8)
130(5-1/8)
150
18(3
/4)
1204
(47-
7/16
)18
1240
(48-
7/8)
110(4-3/8)
(740)(29-3/16)
185(7-5/16)29.5 681(678~684) 29.5
9479
181
160(
6-5/
16)
243(
9-5/
8)15
012
8(5-
1/16
)
125
132(
5-1/
4)20
7(8-
3/16
)25
6(10
-1/8
)
109
129(5-1/8)
84(3-5/16) 90(3-9/16)
54(2-3/16)
135(5-3/8)
20(1
3/16
)54
592(
23-5
/16)
54(2
-3/1
6)
20(1
3/16
)
148(
5-7/
8)
152(
6)
216(
8-9/
16)
166
144(5-11/16)303 1515(59-11/16)
1818(71-5/8)
90(3
-9/1
6)10
60(4
1-3/
4)90
(3-9
/16)
172(
6-13
/16)
(3-3/4)(3-1/8)
(5-1
5/16
)
(6-9/16)
(7-3/16)
(26-13/16)(26-3/4~26-15/16) (1-3/16)(11-15/16)
(4-5/16)
(4-15
/16)
(2-3/1
6)
(3/4
)
(5-15/16)
(1-3/16)
2
5
68
(Mounting pitch)
Botto
m v
iew
(Mou
ntin
g pi
tch)
2×2-
14(9
/16)
×20(
13/1
6) O
val h
ole
1
Contr
ol box
34
7
Serv
icepa
nel
Intak
eair
Intak
eair
Disch
arge a
ir
Intak
eair
Intak
eair
2×6-
ø4.6
(3/1
6) H
ole
(Mak
e ho
le a
t the
pla
stic
fan
guar
d fo
r sno
w ho
od a
ttach
men
t)<S
now
hood
atta
chm
ent h
ole>
Top
view
Fron
t vie
wLe
ft si
de v
iew
Rea
r vie
w
Refri
gera
nt
serv
ice va
lve<H
igh p
ress
ure>
Refri
gera
nt
serv
ice va
lve<L
ow p
ress
ure>
Transf
ormer
box
Con
nect
ing
pipe
spe
cific
atio
ns
Not
e 1.
Plea
se re
fer t
o th
e ne
xt p
age
for i
nfor
mat
ion
rega
rdin
g ne
cess
ary
spac
ing
arou
nd th
e un
it an
d fo
unda
tion
wor
k.2.
At b
razi
ng o
f pip
es, w
rap
the
refri
gera
nt s
ervi
ce v
alve
with
wet
clo
th a
nd k
eep
the
tem
pera
ture
of r
efrig
eran
t se
rvic
e va
lve
unde
r 120
°C(2
48°F
).
*1 C
onne
ct th
e re
frige
rant
pip
e to
the
serv
ice
valv
eac
cord
ing
to th
e In
stal
latio
n M
anua
l.
Mod
elD
iam
eter
Ref
riger
ant p
ipe
Serv
ice
valv
e
EP12
0ø2
8.58(1
-1/8)
ø19.05
(3/4) B
razed
*1 ø2
8.58(1
-1/8)
EP96
High
pres
sure
Low
pres
sure
ø28.58
(1-1/8)
Brazed
ø22
.2(7/8)
Brazed
*1 EP
144
High
pres
sure
Low
pres
sure
ø22.2(7
/8) Bra
zed *1
For tr
ansm
ission
cable
s
For w
ires
For p
ipesU
sage
Spec
ifica
tions
Fro
nt thr
ough
hole
Botto
m thr
ough
hole
Front
throu
gh ho
le
Front
throu
gh ho
le
Botto
m thr
ough
hole
Botto
m thr
ough
hole
Front
throu
gh ho
le
148(5
-7/8)
× 84(3
-5/16
) Kno
ckou
t hole
ø62.7
(2-1/2
) or ø
34.5(
1-3/8)
Knoc
kout
hole
ø43.7
(1-3/4
) or ø
22.2(
7/8) K
nock
out h
ole
ø65(2
-9/16
) Kno
ckou
t hole
ø5
2(2-1/
16) K
nock
out h
ole
ø34(1
-3/8)
Knoc
kout
hole
150(5
-15/16
) × 94
(3-3/4
) Kno
ckou
t hole
ø34(1
-3/8)
Knoc
kout
hole
Botto
m thr
ough
hole
0000005101.BOOK 37 ページ 2019年3月5日 火曜日 午後6時1分
1340 Satellite Boulevard. Suwanee, GA 30024Toll Free: 800-433-4822 www.mehvac.com
Variable Refrigerant Flow (VRF) Multi-Split AC and HPAHRI Standard 1230
Specifications are subject to change without notice. © 2019 Mitsubishi Electric Trane HVAC US LLC. All rights reserved.
FORM# PUHY-EP96TNU-A (-BS) - 201912
Twinning Kit: CMY-R200NCBKUnit: mm (inch)
MEES18K087A
PUR
Y-EP-T(S)NU
-A, Y(S)N
U-A
127
9. OPTIONAL PARTS R2-Series (High efficiency)
9-2. OUTDOOR TWINNING KITThe following optional Outdoor Twinning Kit is needed to use to combine multiple refrigerant pipes. Refer to section "Piping Design" for the details of selecting a proper twinning kit.
Unit: mm (in.)CMY-R200NCBK
<Deformed pipe(Accessory)>
ø25.4(ø1)(Outside diameter)
Twinning pipeø28.58(ø1-3/16)
ø28.58(ø1-3/16)(Outside diameter)
Local brazing
ø22.2(ø7/8)
ø22.2(ø7/8)Pipe cover
(Dot-dashed
ø25.4(ø1)(Outside diameter)
Note 2
High-pressure twinning pipe
Low-pressure twinning pipe
ø19.05(ø3/4)
ø19.05(ø3/4)
ø22.2(ø7/8)
ø28.58(ø1-3/16)ø22.2(ø7/8)(Outside diameter)
ø34.93(ø1-7/16)ø28.58(ø1-3/16)(Outside diameter)
(2 pcs.)(2-1/2)
(3-3/16)
(1-7
/16)
part)
(342)(13-1/2)588(23-3/16)
505(19-29/32)
160(
6-5/
16)
80
35
62
100(3-15/16)
Twinning pipe
±15°
Note:1. Refer to the figure below for
the installation position ofthe twinning pipe.
2. Use the attached pipe to brazethe port-opening of the twinning pipe.
3. Pipe diameter is indicatedby inside diameter.
Slope of the twinning pipesare at an angle within ±15°to the horizontal plane.
Unit: mm (in.)CMY-R300NCBK
(337)(13-5/16)
585(23-1/16)
503(19-13/16)
162(
6-7/
16)
69
35
80 62
ø31.75(ø1-1/4)(Outside diameter)
Local brazing
Pipe cover(Dot-dashed
ø28.58(ø1-3/16)
ø28.58(ø1-3/16)
ø28.58(ø1-3/16)(Outside diameter)
ø34.93(ø1-7/16)Note 2 Twinning pipe ø28.58(ø1-3/16)
(Outside diameter)
(Outside diameter)
High-pressure twinning pipe
<Deformed pipe(Accessory)>
(Outside diameter)
<Deformed pipe(Accessory)>
ø41.28(ø1-11/16)ø34.93(ø1-7/16)
ø22.2(ø7/8)ø19.05(ø3/4)ø28.58(ø1-3/16)
ø19.05(ø3/4)
ø19.05(ø3/4)
Low-pressure twinning pipe
(2 pcs.)
(2-3/4)
(3-3/16)
(1-7/1
6)
(2-1/2)
part)
Twinning pipe
±15°
to the horizontal plane.
Note:1. Refer to the figure below for
the installation position ofthe twinning pipe.
2. Use the attached pipe to brazethe port-opening of the twinning pipe.
3. Pipe diameter is indicatedby inside diameter.
Slope of the twinning pipesare at an angle within ±15°
The angle of the twinning pipe is within ±15° against the horizontal plane. 2. Use the attached pipe to braze the port-opening of the twinning pipe.3. Pipe diameter is indicated by inside diameter.4. Only use the Twinning pipe by Mitsubishi (optional parts) .
Note 1. Reference the attitude angle of the twinning pipe below the fig.
Twinning pipe
±15°
0000005101.BOOK 127 ページ 2019年3月5日 火曜日 午後6時1分
MEES18K089
PUHY-P-T(S)NU-A, Y(S)NU-A
129
9. OPTIONAL PARTS Y-Series
9-3. OUTDOOR TWINNING KITThe following optional Outdoor Twinning Kit is needed to use to combine multiple refrigerant pipes. Refer to section "Piping Design" for the details of selecting a proper twinning kit.
1-15/16"(2 pcs.)
(2 pcs.)
3-7/8"
9-1/2"
7-7/32"
3-9/32"
19-29/32"
13-15/32"23-5/32"
6-5/16"
2-15/32"
1-15/16"
2-15/32"Distributer Distributer
Pipe cover(Dot-dashed part)
1/2"
1/2"
1/2"1/2"
Local brazing
Note 25/8"
5/8"
1-1/8"Note 2 1"
7/8"
1"7/8"Pipe cover
(Dot-dashed part)Local brazing
1-1/8"
(2 pcs.)
7/8" 3/4"
1/2"5/8"1/2" 3/8"
1-1/8"7/8"
For Gas pipe: For Liquid pipe:
ID: Inner Diameter OD: Outer Diameter
in.CMY-Y100CBK3<Reducer(Accessory)>
For Gas pipe: For Liquid pipe:
ID: Inner Diameter OD: Outer Diameter
in.CMY-Y300CBK2<Reducer(Accessory)>
Note 2
1/2"
5/8"1/2"
1/2"
3/4"1/2"
Pipe cover
Local brazing
3-7/8"
Local brazing
Pipe cover 5/8"3/4"
3/4"
5/8"3/4"
5/8"
9-11/16"
3-3/8"
7-9/16"
4-9/16"
7-5/16"
9-5/8"
(Dot-dashed part)
(Dot-dashed part)
Note 2
Distributer
Distributer
3/8"
1-1/8" 7/8"
1/2"
1-15/16"
2-1/2"
1/2"5/8"
5/8" 3/8"
1-15/16"
1-15/16"
1/2" 5/8"
(2 pcs.)1-15/16"
1-5/8"1-1/2"
(3 pcs.)
1-1/8" 3/4"
1-3/8"1-1/2"
2-1/2"(2 pcs.)
2-3/4"
2-3/4"
1-3/8"
Pipe cover
Local brazing1-1/4"
1-1/8"
1-3/8"
1-1/8"1-1/8"
6-7/16"
1-1/8"
1-1/8"1"
1-1/8"
1"
Local brazing
Pipe cover
19-15/16"
22-15/16"
13-3/8"
23-1/16"
13-5/16"
1-1/2"
Note 2
(Dot-dashed part)
(Dot-dashed part)
Note 2
Distributer
Distributer
19-11/16"
6-7/16"
3-3/8"
The angle of the twinning pipe is within ±15° against the horizontal plane. 2. Use the attached pipe to braze the port-opening of the twinning pipe.3. Pipe diameter is indicated by inside diameter.4. Only use the Twinning pipe by Mitsubishi (optional parts) .
Note 1. Reference the attitude angle of the twinning pipe below the fig.
Twinning pipe
±15°
0000005103.BOOK 129 ページ 2019年2月13日 水曜日 午後4時56分
MEES18K089
PUH
Y-P-T(S)NU
-A, Y(S)N
U-A
129
9. OPTIONAL PARTS Y-Series
9-3. OUTDOOR TWINNING KITThe following optional Outdoor Twinning Kit is needed to use to combine multiple refrigerant pipes. Refer to section "Piping Design" for the details of selecting a proper twinning kit.
1-15/16"(2 pcs.)
(2 pcs.)
3-7/8"
9-1/2"
7-7/32"
3-9/32"
19-29/32"
13-15/32"23-5/32"
6-5/16
"
2-15/32"
1-15/16"
2-15/32"Distributer Distributer
Pipe cover(Dot-dashed part)
1/2"
1/2"
1/2"1/2"
Local brazing
Note 25/8"
5/8"
1-1/8"Note 2 1"
7/8"
1"7/8"Pipe cover
(Dot-dashed part)Local brazing
1-1/8"
(2 pcs.)
7/8" 3/4"
1/2"5/8"1/2" 3/8"
1-1/8"7/8"
For Gas pipe: For Liquid pipe:
ID: Inner Diameter OD: Outer Diameter
in.CMY-Y100CBK3<Reducer(Accessory)>
For Gas pipe: For Liquid pipe:
ID: Inner Diameter OD: Outer Diameter
in.CMY-Y300CBK2<Reducer(Accessory)>
Note 2
1/2"
5/8"1/2"
1/2"
3/4"1/2"
Pipe cover
Local brazing
3-7/8"
Local brazing
Pipe cover 5/8"3/4"
3/4"
5/8"3/4"
5/8"
9-11/16"
3-3/8"
7-9/16"
4-9/16
"
7-5/16"
9-5/8"
(Dot-dashed part)
(Dot-dashed part)
Note 2
Distributer
Distributer
3/8"
1-1/8" 7/8"
1/2"
1-15/16"
2-1/2"
1/2"5/8"
5/8" 3/8"
1-15/16"
1-15/16"
1/2" 5/8"
(2 pcs.)1-15/16"
1-5/8"1-1/2"
(3 pcs.)
1-1/8" 3/4"
1-3/8"1-1/2"
2-1/2"(2 pcs.)
2-3/4"
2-3/4"
1-3/8"
Pipe cover
Local brazing1-1/4"
1-1/8"
1-3/8"
1-1/8"1-1/8"
6-7/16
"
1-1/8"
1-1/8"1"
1-1/8"
1"
Local brazing
Pipe cover
19-15/16"
22-15/16"
13-3/8"
23-1/16"
13-5/16"
1-1/2"
Note 2
(Dot-dashed part)
(Dot-dashed part)
Note 2
Distributer
Distributer
19-11/16"
6-7/16
"
3-3/8"
The angle of the twinning pipe is within ±15° against the horizontal plane. 2. Use the attached pipe to braze the port-opening of the twinning pipe.3. Pipe diameter is indicated by inside diameter.4. Only use the Twinning pipe by Mitsubishi (optional parts) .
Note 1. Reference the attitude angle of the twinning pipe below the fig.
Twinning pipe
±15°
0000005103.BOOK 129 ページ 2019年2月13日 水曜日 午後4時56分
MEES18K087A
PUR
Y-EP-T(S)NU
-A, Y(S)N
U-A
127
9. OPTIONAL PARTS R2-Series (High efficiency)
9-2. OUTDOOR TWINNING KITThe following optional Outdoor Twinning Kit is needed to use to combine multiple refrigerant pipes. Refer to section "Piping Design" for the details of selecting a proper twinning kit.
Unit: mm (in.)CMY-R200NCBK
<Deformed pipe(Accessory)>
ø25.4(ø1)(Outside diameter)
Twinning pipeø28.58(ø1-3/16)
ø28.58(ø1-3/16)(Outside diameter)
Local brazing
ø22.2(ø7/8)
ø22.2(ø7/8)Pipe cover
(Dot-dashed
ø25.4(ø1)(Outside diameter)
Note 2
High-pressure twinning pipe
Low-pressure twinning pipe
ø19.05(ø3/4)
ø19.05(ø3/4)
ø22.2(ø7/8)
ø28.58(ø1-3/16)ø22.2(ø7/8)(Outside diameter)
ø34.93(ø1-7/16)ø28.58(ø1-3/16)(Outside diameter)
(2 pcs.)(2-1/2)
(3-3/16)
(1-7
/16)
part)
(342)(13-1/2)588(23-3/16)
505(19-29/32)
160(
6-5/
16)
80
35
62
100(3-15/16)
Twinning pipe
±15°
Note:1. Refer to the figure below for
the installation position ofthe twinning pipe.
2. Use the attached pipe to brazethe port-opening of the twinning pipe.
3. Pipe diameter is indicatedby inside diameter.
Slope of the twinning pipesare at an angle within ±15°to the horizontal plane.
Unit: mm (in.)CMY-R300NCBK
(337)(13-5/16)
585(23-1/16)
503(19-13/16)
162(
6-7/
16)
69
35
80 62
ø31.75(ø1-1/4)(Outside diameter)
Local brazing
Pipe cover(Dot-dashed
ø28.58(ø1-3/16)
ø28.58(ø1-3/16)
ø28.58(ø1-3/16)(Outside diameter)
ø34.93(ø1-7/16)Note 2 Twinning pipe ø28.58(ø1-3/16)
(Outside diameter)
(Outside diameter)
High-pressure twinning pipe
<Deformed pipe(Accessory)>
(Outside diameter)
<Deformed pipe(Accessory)>
ø41.28(ø1-11/16)ø34.93(ø1-7/16)
ø22.2(ø7/8)ø19.05(ø3/4)ø28.58(ø1-3/16)
ø19.05(ø3/4)
ø19.05(ø3/4)
Low-pressure twinning pipe
(2 pcs.)
(2-3/4)
(3-3/16)
(1-7/1
6)
(2-1/2)
part)
Twinning pipe
±15°
to the horizontal plane.
Note:1. Refer to the figure below for
the installation position ofthe twinning pipe.
2. Use the attached pipe to brazethe port-opening of the twinning pipe.
3. Pipe diameter is indicatedby inside diameter.
Slope of the twinning pipesare at an angle within ±15°
The angle of the twinning pipe is within ±15° against the horizontal plane. 2. Use the attached pipe to braze the port-opening of the twinning pipe.3. Pipe diameter is indicated by inside diameter.4. Only use the Twinning pipe by Mitsubishi (optional parts) .
Note 1. Reference the attitude angle of the twinning pipe below the fig.
Twinning pipe
±15°
0000005101.BOOK 127 ページ 2019年3月5日 火曜日 午後6時1分
Recommended