HEALTH & AGED CARE I PROJECT SHEET
OLOC - Stage 2Toongabbie, NSW
Construction of a mixed-use development comprising of 38 self-contained dwellings, levels of basement carpark, Medical Centre and a Hydrotherapy pool
PROJECT DESCRIPTION
This mixed use/ aged care development comprises the demolition of existing structures and the construction of a part 5 storey, part 4 storey multi-unit residential building and 38 self-contained dwellings with 2 levels of basement car parking. The development will also house a ground floor medical centre and hydrotherapy pool, a courtyard and a roof top landscaped terrace. Works includes excavation, piling and all supporting elements, a new storm water detention system,landscaping, minor roadworks to adjoining lane way
OVERCOMING CHALLENGES:Th 2 storey below ground basement – piled wall with capping beam braced by hydraulic struts until the Basement 1 slab is poured.
Logistics due to the tight constraints of the site and adjoining properties – Tower crane to be used for vertical lights from the work zone along Aurelia Street.
INNOVATIONS:Tower crane for vertical liftsHebel Wall external wall system
CLIENTOur Lady of Consolation
PROJECT VALUE$21.6 million
CONTRACTDesign & Construct
COMPLETIONSeptember 2021