Northeast Trailbeltlineorg-wpengine.netdna-ssl.com/wp-content/uploads/...Northeast Trail Physical...

Preview:

Citation preview

Northeast

Trail

November 8, 2018

@atlantabeltline

@atlantabeltline

@atlantabeltline

Vision:

To be the catalyst

for making

Atlanta a global

beacon for

equitable,

inclusive, and

sustainable

city life.

PROGRAM

ELEMENTS

We are here…

Infrastructure Updates

Eastside Trail:

Monroe Drive Plaza

Eastside Trail:

Memorial Drive

Southside Trail:

Interim Trail

Infrastructure Updates

Eastside Trail:

Monroe Drive Plaza

Eastside Trail:

Memorial Drive

Southside Trail:

Interim Trail

Infrastructure Updates

Eastside Trail:

Monroe Drive Plaza

Eastside Trail:

Memorial Drive

Southside Trail:

Interim Trail

Still Here!

Northeast Trail

Project Limits: • Monroe Drive to

MARTA Lindbergh

Scope:• Alternatives Analysis

• Concept Validation

• Locally Preferred Alt

• Engineering and Design

• Construction Documents

Schedule:• LPA by Spring 2019

• CD’s in 2022

Still Here!

Northeast Trail

Project Limits: • Monroe Drive to

MARTA Lindbergh

Scope:• Alternatives Analysis

• Concept Validation

• Locally Preferred Alt

• Engineering and Design

• Construction Documents

Schedule:• LPA by Spring 2019

• CD’s in 2022

Still Here!

Northeast Trail

The Band

https://www.moviemarket.com/the-blues-brothers-299618/

Northeast Trail

Public Challenge #1• Allow for the possibility

of alternative Northeast

Trail and Transit

alignments

Still Here!

Northeast Trail

Systems

Interactions…• Northeast Trail

• Northeast Transit

• Northside Trail

• Northside Transit

• MARTA Armour Station?

• Clifton Corridor LRT

These are all

“defined by

placeholders.”

Northeast Trail

Systems

Interactions…• Northeast Trail cannot

preclude any viable

alternatives along any

Northside BeltLine

Corridor

Northeast Trail

Public Challenge #2• Allow for the possibility

of alternative Northside

Trail and Transit

alignments

Northeast Trail

Network

Connections…• MARTA Red/Gold Lines

• PATH400

• Cheshire Farm Trail

• Confluence Trail

• Peachtree Hills Spur

Northeast Trail

Physical

Constraints…• I-85/Buford Hwy

• MARTA Red/Gold Line

• MARTA Armour Yard

• Norfolk Southern Rail

• CSX Rail

• Peachtree Creek

• Brookwood Hills

Conservation Easement

• Armour Drive

– Under Buford Hwy

– Under

MARTA/NSR

Northeast Trail

So How Do We

Move Forward?!

1. Alternatives Analysis

2. Performance Measures

3. Systems Analysis

– Do Not Preclude…

Northeast Trail

Engagement

Activities…• Performance Measures

• Share Ideas and

Opinions

• Mapping Alignment

Alternatives

Northeast Trail

Performance

Measures…

• Attractiveness

• Comfort

• Connectivity

• Directness

• Implementability

• Your Suggestions?

– Equal Weighting?

– Missing Metrics?

– Scoring System?

Northeast Trail