Northeast Ohio Regional Sewer District - Parma, Ohio

Preview:

Citation preview

Northeast Ohio Regional Sewer District

Regional Stormwater Management Program UpdateParma Water Summit

February 25, 2021

Regional Stormwater Management Program

Stormwater Master Planning

Inspection and Maintenance

Construct Stormwater

Projects

Community Cost-share Program

476 Miles of RSS

Recently Completed Project

West Creek Bank Stabilization by Sandpiper Drive

West Creek Bank Stabilization by Sandpiper Drive

West Creek

Parma Care Nursing Home

West Creek Bank Stabilization by Sandpiper Drive

Soldier pile wall system to support eliminate the erosion along the toe of Big Creek

Completed in the Fall of 2020

Stormwater Master Planning

Cuyahoga River North Stormwater Master Plan:

Watershed Study Area

Total Study Area99,000 acres 11 Subwatersheds 23 WAC Member

Communities

Budget: $8.02 Million

Completed and distributed to Communities

Rocky RiverStormwater Master Plan:

Watershed Study Area

Baldwin Creek shown in green Big Creek shown in

brown and dark green, Stickney Creek in blue, West Creek shown in yellow

Current and Upcoming Projects

Big Creek Stream Restoration by Ridge Road

Ridge Road is to the right, picture is facing north

Big Creek Stream Restoration by Ridge Road

Upper Ridgewood Lake (on Big Creek)

Culverted portion of Big

Creek

Big Creek Flood Reduction near Sprague Road

Parma

North Royalton

Big Creek Flood Reduction near Sprague Road

Picture is facing south, towards North Royalton. Vehicle is on Sprague Road.

Flood Mitigation at W. Pleasant Valley and York Roads on Baldwin Creek

Tri-C Campus

Relief Culvert by Stormes Drive on Baldwin Creek

Bonny Banks

Baldwin Creek

proposed relief culvert

Local Efforts:Community Cost Share in Parma, 2018-2021

• $130,000- Baldwin Creek Project, headwall repair• $300,000- Orchard Park culvert and headwall repair• $245,000- South Canterbury culvert repair• $827,773- Stormwater equipment • $750,000- Catch basin repair and replacement• $127,500- Storm Drainage on Lourdes Drive• $49,500- West Creek Restoration • $90,000- Stormwater Improvements on Hickory Hill Lane• $60,000- Meadow Lane Storm Improvement Design• $49,695- Rustic Trail Storm Sewer Improvements• $43,249- Fenway Storm Sewer Improvements• $40,000- Engineering Study for Dam at Hollenbeck Lake

Total: $2,712,717 spent on community stormwater infrastructure

Member Community Infrastructure Program*

NEORSD grant funding for local

sewer repairs and projects.

Targeted at reducing basement backups.

Parma has obtained these NEORSD

grants for 2017, 2018, 2019, 2020,

and 2021.

Total of $2,250,043 in funding over five

years.

Funding available for NEORSD 2022 grant

awards.

*Wastewater funded. Not part of the Regional Stormwater Management Program

Donna FriedmanWatershed Team Leader/ Parma community contact216-881-6600 Ext. 6768friedmand@neorsd.org

Customer Service line: (216) 881-8247

Questions?

Recommended