View
214
Download
1
Category
Preview:
Citation preview
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
Northeast Area Elementary School
PRELIMINARY DESIGN PRESENTATION
The Board of Education of Baltimore County
S. Dallas Dance, Superintendent
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
• General Information
• Project Goals
• Project Value Engineering Measures
• Project Location
• Site Conditions
• Building Organization
• Renderings and 3D Animations
• Project Schedule Overview
• Questions
AGENDA 2
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
REGIONAL MAP 3
New Northeast Area
Elementary School
© 2016 Google
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
• Northeast Area Elementary School
• New school located on relatively undeveloped site
• Evolution of the prototype for Lyons Mill, Westowne, and Relay Elementary Schools
• We reexamined everything…
• Enrollment Information
• Target SRC 735
• Regional Programs
• None
GENERAL INFORMATION 4
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
• Support 21st Century Learning Techniques
• Create collaborative expanded learning spaces
• Shared breakout learning space between classrooms
• Large group learning spaces away from the classroom
• Outdoor classroom spaces
• Centralized multi-functional media center
• Flexible learning spaces (maker space and digital learning)
• Utilize state-of-the-art technology
• Implement Sustainable Design Strategies
• Achieve LEED Silver™ rating (Leadership in Energy and Environmental Design) from
the United States Green Building Council (USGBC)
• Maximize energy efficiency
• Building envelope with high thermal resistance
• Geothermal heating and cooling
• Vegetated (green) roof design that also supports 21st Century Learning
PROJECT GOALS 5
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
• Promote Safety and Security Objectives
• Provide convenient access to the site with safety as the priority
• Extend sidewalks along Joppa Road for pedestrians
• Design vehicular access to the site that calms traffic on Joppa Road
• Minimize risk of motor vehicle accidents
• Minimize risk to pedestrians
• Separate bus traffic from other vehicular traffic
• Separate Bus Drop-off Entry from Main Entry with strong visible connection
• Provide site lighting that maximizes security but minimizes light pollution
• Electronic access control for school building
• Security cameras
• Card readers
• Evolution of the Prototype and Unique Design Features
• Classroom area configuration provides ultimate flexibility
• Provides more efficient building circulation
• Provides greater access to Rooftop Collaborative Learning Space
• Improves functionality of Heath Suite
• Increases visibility in the Media Center
PROJECT GOALS 6
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
• Civil/Site
• Conduct more intensive geotechnical investigations
• Classify the site soils
• Limit quantity of earth disturbance
• Architectural
• Improve building efficiency
• Simplification of building footprint
• Gypsum wallboard/metal stud interior partitions
• Limit use of concrete masonry unit partitions
• Exterior metal stud walls with alternative finishing materials
• Standardize spaces
• Standardize window and door openings
• Building adapts to site conditions (as opposed to site adapting to building)
PROJECT VALUE ENGINEERING MEASURES 7
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
• Structural
• Conduct more intensive geotechnical investigations to determine the extent (if any) of
specialty foundation systems
• Mostly structural steel frame (all but Gymnasium/Cafeteria)
• Significantly minimize bearing walls
• Mechanical
• Provide hybrid geothermal system (reducing well field by 50%)
• Reduces first cost with slight reduction in energy efficiency from a full geothermal
system
• Responds to site limitations for installation of well field
• Electrical
• Emergency generator is sized to meet code and BCPS requirements
• Provide connection for Maryland Emergency Management Agency (MEMA) portable
generator when building is used as an emergency shelter
• We are committed and continuing to examine ways of reducing costs without a
reduction in quality.
PROJECT VALUE ENGINEERING MEASURES 8
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
VICINITY MAP 9
© 2016 Google
New Northeast Area
Elementary School
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
VICINITY MAPPUBLIC SCHOOLS AND LIBRARY
10
.. 1 MI 2 MI
Perry Hall Branch of
Baltimore County Library
Joppa View
Elementary School
Chapel Hill
Elementary School
Perry Hall High School
Gunpowder
Elementary School
Perry Hall Elementary
& Middle Schools
© 2016 Google
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
VICINITY MAPRECREATION AND PARKS
11
Gough Park
Honeygo Regional Park
Perry Hall Park
Snyder Park 1 MI 2 MI
Indian Rock Park
Gunpowder Falls
State Park
© 2016 Google
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
NEIGHBORHOOD MAP 12
Honeygo RunHoneygo Run Project Site
American Native
Plants Nursery
© 2016 Google (aerial photography)
Snyder Lane
Snyder Park
Chapel Road
East Joppa Road
Site Access
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
13
© 2016 Microsoft (aerial photography)
SITE CONDITIONSNATURAL FEATURES
Forest Buffer
Delineation
Forest Buffer
DelinieationHoneygo Run
Specimen Tree to
Remain
Specimen Tree
to be RemovedMitigation Possible
Specimen Tree to be
RemovedMitigation Unlikely
(2) Specimen Trees
to Remain
Irrigation Pond
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
14
Service
Bus Loop
School Entry &
Joppa Road
Improvements
Visitor Parking
Student Drop-off
Access Drive
Staff / Rec & Parks
Parking
SITE CONDITIONSCIRCULATION
© 2016 Microsoft (aerial photography)
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
15
Reading Courtyard
Educational GardensArt Courtyard
Play Area
Bus Entry Courtyard
Collaborative Learning
Space
Rooftop Collaborative
Learning Space
© 2016 Microsoft (aerial photography)
SITE CONDITIONSEDUCATIONAL SPACES
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
16SITE CONDITIONSSERVICES & FEATURES
© 2016 Microsoft (aerial photography)
Stormwater
Management
Stormwater
Management
Geothermal Well Field
Tributary Stream
Crossing(Requires permits beyond
usual requirements)
Stormwater
Management
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
Original GWWO Prototype Elementary SchoolRelay Elementary School
(Lyons Mill ES and Westowne ES similar)
Evolved GWWO Prototype Elementary School Northeast Area Elementary School
Neighborhood
Collaborative
Learning Areas
Centralized
Collaborative
Learning Areas
ClassroomsClassrooms
DESIGN EVOLUTION
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
DESIGN EVOLUTION
Rooftop
Collaborative
Learning
Space
Collaborative
Learning Space
Art & Science
Classrooms
Rooftop Collaborative
Learning Space
Evolved GWWO Prototype Elementary School Northeast Area Elementary School
Original GWWO Prototype Elementary SchoolRelay Elementary School
(Lyons Mill ES and Westowne ES similar)
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
BUILDING ORGANIZATION 19
Gymnasium
Cafeteria
Music Classrooms
Baltimore Co.
Recs-and-Parks
Administration/Health Suites
Media Center/Flexible
Learning Spaces
Rooftop Collaborative
Learning Space
Collaborative
Learning Space
Main Entry/Secure Vestibule
Typical Paired
Classroom
Typical Paired
Classroom
Primary Stair/Collaborative Learning Space
Upper Level Floor Plan
Service Core
Service Core
Specialized
Instruction
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
BUILDING ORGANIZATION 2020
Unexcavated
Earth
Collaborative
Learning Space
Art Classroom
Bus Entry
Service Core
Service Core
Typical Paired
Classroom (Pre-K/Kindergarten)
Typical Paired
Classroom
Typical Paired
Classroom
Lower Level Floor Plan
Specialized
Instruction
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
EXTERIOR RENDERINGS 21
Bird’s Eye View of CampusLooking Northwest
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
EXTERIOR RENDERINGS 22
Bird’s Eye View - Front of School BuildingLooking Southwest
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
EXTERIOR RENDERINGS
View of Entry from Pedestrian ApproachSoutheast Elevation
23
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
EXTERIOR RENDERINGS
View of Main Entry from Visitor Parking LotSoutheast Elevation
24
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
EXTERIOR RENDERINGS
View of Bus Entry Courtyard Collaborative Learning SpaceSoutheast Elevation
25
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
EXTERIOR RENDERINGS 26
Bird’s Eye View - Rear of School BuildingLooking Northeast
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
EXTERIOR RENDERINGS
View of Reading CourtyardNorthwest Elevation
27
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
EXTERIOR RENDERINGS 28
Bird’s Eye View of Rooftop Collaborative Learning SpaceLooking Northwest
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
EXTERIOR RENDERINGS
View of Rooftop Collaborative Learning Space from Educational GardensSouthwest Elevation
29
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
INTERIOR RENDERINGS 31
Entry Lobby/Primary Stair Collaborative Learning SpaceView from Upper Level Corridor
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
INTERIOR RENDERINGS 32
Primary Stair Collaborative Learning SpaceView from Lower Level Bus Entry Lobby
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
INTERIOR RENDERINGS 34
Media CenterView from Circulation Desk
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
INTERIOR RENDERINGS 35
Typical ClassroomStandard Arrangement
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
INTERIOR RENDERINGS 36
Typical ClassroomStandard Arrangement
NORTHEAST AREA ELEMENTARY SCHOOLJuly 12, 2016
PROPOSED PROJECT SCHEDULE OVERVIEW 37
Phase/Activity Date
Design Kick-Off January 2016
Advertisement for Bid December 2016
Board Approval February 2017
Notice to Proceed March 2017
Building Substantial Completion August 2018
Recommended