NANDIPUR POWERPROJECT
Presenter NamePresentation Date
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 2/13
Overview
• Introduction
• History
• Current status
• Issues
• How to make it ri!t
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 3/13
Introduction
• Nandi"ur "ower "ro#ect is com$ined cyc%e t!erma% "ower "%ant
situated in Nandi"ur near &u#ranwa%a 'Pun#a$( Pakistan)*
• Nandi"ur Power Pro#ect is owned $y Pakistan E%ectric Power
Com"any 'PEPCO)*
Com$ined cyc%e+“In electric power generation a combined cycle is an assembly of heat engines thatwork in tandem from the same source of heat, converting it into mechanical energy,
which in turn usually drives electrical generators” (Wikipedia definition)
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 4/13
Introduction
Nandipur power project
,ocation Nandi"ur near &u#ranwa%a(Pun#a$("akistan
status Testin "!ase 'uno--icia%)
Construction $ean .//0
Com"%etion date 1arc! ./23
Estimated cost 'Rs*) .4 $i%%ion
Construction cost 'Rs*) 0/ $i%%ion
Insta%%ed ca"acity 5.3 1eawatt
"otentia% U" to 2/// meawattPrimary -ue% Natura% as
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 5/13
History
• Contracted to C!inese Dong Fang Electric Corporation in .//0
at .4 $i%%ion wit! 2/ "ercent down "ayment
• e6"ected to -inis! in April 2011
• De%ayed as t!e summary( sent $y t!e Ministry of Water and
Power -or %ea% o"inion o- t!e Ministry of aw ! "ustice
• Remained "endin -rom ./2/ to ./2.*
• A%% t!e mac!inery and e7ui"ment stayed stuck at 8arac!i "ort*
• CE# $%ang &ourong o- Dong Fang Electric Corporation
terminated t!e contract in 'epte()er 2012*
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 6/13
History
• Don -an cor"oration demanded 5/ mi%%ion -or co%ossa% %osses due
to 03 mi%%ion wort! mic!inary was stuck at 8arac!i "ort*
• In "une 201*( t!e contract Dong fang corporation was
reneiotiated $y pri(e (inister Nawa+ s%arif ,• In "uly 201*( Enineers -rom cor"oration arrived at 8arac!i "ort
-or survey and secure re%ease o- mac!inery* ,ater "ro#ect restarted*
• Prime minister Nawa9 s!ari- inauurated 2st tur$ine on *1 (ay201-,
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 7/13
History
• T!e "%ant was s%utdown a-ter . days due miss manaement and
use ina""ro"riate -ue%*
• /n "uly 201.( it was re"orted t!at t!e "%ant is -unction ( aain*
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 8/13
Date 2 Date . Date 4 Date 5
Time%ine
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 9/13
Time%ine
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 10/13
,ookin A!ead
• W!en is t!e ne6t mi%estone:
• W!at are t!e e6"ected de%ivera$%es:
• 8nown risks and issues
o W!at is t!e investiation time%ine -or t!ese
issues:
• W!at are t!e immediate ne6t ste"s:
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 11/13
De"endencies and Resources
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 12/13
A""endi6
7/23/2019 Nandipur Power Project
http://slidepdf.com/reader/full/nandipur-power-project 13/13
A""endi6
• ;udet
• Desin documents
• 1arketin "%an
• <u""%ementa% documents
• Contact in-ormation