NANDIPUR POWERPROJECT

Presenter NamePresentation Date

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 2/13

Overview 

• Introduction

• History

• Current status

• Issues

• How to make it ri!t

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 3/13

Introduction

• Nandi"ur "ower "ro#ect is com$ined cyc%e t!erma% "ower "%ant

situated in Nandi"ur near &u#ranwa%a 'Pun#a$( Pakistan)*

• Nandi"ur Power Pro#ect is owned $y Pakistan E%ectric Power

Com"any 'PEPCO)*

Com$ined cyc%e+“In electric power generation a combined cycle is an assembly of heat engines thatwork in tandem from the same source of heat, converting it into mechanical energy,

which in turn usually drives electrical generators” (Wikipedia definition)

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 4/13

Introduction

Nandipur power project

,ocation Nandi"ur near &u#ranwa%a(Pun#a$("akistan

status Testin "!ase 'uno--icia%)

Construction $ean .//0

Com"%etion date 1arc! ./23

Estimated cost 'Rs*) .4 $i%%ion

Construction cost 'Rs*) 0/ $i%%ion

Insta%%ed ca"acity 5.3 1eawatt

"otentia% U" to 2/// meawattPrimary -ue% Natura% as

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 5/13

History 

• Contracted to C!inese Dong Fang Electric Corporation in .//0

at .4 $i%%ion wit! 2/ "ercent down "ayment

•  e6"ected to -inis! in April 2011

• De%ayed as t!e summary( sent $y t!e Ministry of Water and

Power -or %ea% o"inion o- t!e Ministry of aw ! "ustice

• Remained "endin -rom ./2/ to ./2.*

•  A%% t!e mac!inery and e7ui"ment stayed stuck at 8arac!i "ort*

• CE# $%ang &ourong o- Dong Fang Electric Corporation 

terminated t!e contract in 'epte()er 2012*

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 6/13

History

• Don -an cor"oration demanded 5/ mi%%ion -or co%ossa% %osses due

to 03 mi%%ion wort! mic!inary was stuck at 8arac!i "ort*

• In "une 201*( t!e contract Dong fang corporation  was

reneiotiated $y pri(e (inister Nawa+ s%arif ,• In "uly 201*( Enineers -rom cor"oration arrived at 8arac!i "ort

-or survey and secure re%ease o- mac!inery* ,ater "ro#ect restarted*

• Prime minister Nawa9 s!ari- inauurated 2st  tur$ine on *1 (ay201-,

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 7/13

History

• T!e "%ant was s%utdown a-ter . days due miss manaement and

use ina""ro"riate -ue%*

• /n "uly 201.( it was re"orted t!at t!e "%ant is -unction ( aain*

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 8/13

Date 2 Date . Date 4 Date 5

Time%ine

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 9/13

Time%ine

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 10/13

,ookin A!ead

•  W!en is t!e ne6t mi%estone:

•  W!at are t!e e6"ected de%ivera$%es:

• 8nown risks and issues

o  W!at is t!e investiation time%ine -or t!ese

issues:

•  W!at are t!e immediate ne6t ste"s:

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 11/13

De"endencies and Resources

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 12/13

 A""endi6

7/23/2019 Nandipur Power Project

http://slidepdf.com/reader/full/nandipur-power-project 13/13

 A""endi6

• ;udet

• Desin documents

• 1arketin "%an

• <u""%ementa% documents