View
69
Download
0
Category
Preview:
Citation preview
•MTR and Airport Express Feature Ads Installation Guideline for Contractor
2019 issue 1 (Last updated on 6 June 2019)
* MTR System here refers to Kwun Tong Line, Tsuen Wan Line, Island Line, South Island Line, Tung Chung Line, Tseung Kwan O Line and Disneyland Resort Line
2
Contents Page
Different Formats of Feature Ads in MTR Stations 3
General Requirement 4
General Safety Requirement in MTR Stations 5 – 17
Installation Procedure of Feature Ads 18 – 31
Typhoon and Other Emergency Requirement 32
Use of Materials 33 - 42
MTR Particular Feature Ads Guideline for Different Formats
1) MTR stations (Concourse, passage, platform) 43 – 129
2) MTR stations (Trackside) 130 - 136
3) MTR in-train 137 - 140
4) MTR Train Door Window Sticker 141 - 147
Airport Express Particular Feature Ads Guideline for Different Formats
1) Airport Express Stations (Concourse, passage, platform) 148 - 149
2) Airport Express in train 150 - 157
The compilation of information contained in this Guideline is for general information and is subject to changes from time to time without further notice.
ed.
3
Feature Ads in MTR Stations includes the following formats:
Different Formats of Feature Ads in MTR Stations
Poster-on-wall
Pillar Wrap
Trackside Billboard
Platform Screen Door(PSD)
Escalator Sticker Extension
Staircase, Floor sticker, balustrade
4 sheet, 12 sheet sticker extension
4 sheet, 12 sheet covered with forex board
4 sheet, 12 sheet covered by backdrop
In-train Sticker
Train Body Sticker
TV Ring
Tailor-made Escalator Crown Panel Extension with 3D pop up
Buntings
Ticketing machine sticker
Standees
4
General Requirement
➢ The Contractor involved in the Feature Ads installations must comply with MTR By-Laws and
Operational Requirements at any times. MTR《Railway Safety Rules》
➢ Contractors must be listed on the《JCD Approved Contractor List》.
➢ The contractor shall maintain the Feature Ads advertising materials are in good appearance and
conditions and shall rectify or remedy any defects immediately upon JCDecaux notification.
➢ NO Damage on existing fixtures or equipment during the delivery, installation and dismantling
➢ Any damaged Equipment shall not be used, and it shall be clearly labelled and removed
immediately
➢ Contractors are responsible for removing sticker residue and made good the site immediately after
the booking period.
➢ No Silk Screen Printing for Feature Ads
➢ No irritating smell material shall be used for Feature Ads
General Requirement
5
Contents:
1. Factories and Industrial Undertakings Ordinance (F&IU), Construction Site (Safety) Regulations (CSSR)
2. Construction Industry Safety Training Certificate
3. Items not allowed to bring into MTR
4. Personal Protective Equipment (PPE)
5. Working Tools and Equipment
6. Hotwork
7. Electrical Appliance and Electrical Wiring
General Safety Requirement in MTR Stations
6
1. F&IU, CSSR
For all feature Ads installation and/or modification and removal within the MTR Premises are construction under the regulation of HKSAR, F&IU (Factory & Industrial undertaking) and Construction Site Safety Regulation (CSSR).
All works related to work at height or use of metal scaffold must be complied with (F&IU) and CSSR Part 5A
2. Construction Industry Safety Training Certificate
All working staffs must be holder of mandatory Construction Industry Safety Training Certificate under Section 6BA(2) of the factories and industrial undertakings Ordinance Cap 59.
Frontline operation working within an MTR premises must be a certificate holder of relevant Railway safety qualification, such as RSI, organ label, CP(T) or CP(NT)
General Safety Requirement in MTR Stations
7
General Safety Requirement in MTR Stations
3. Items not allowed bring into MTR
Danger Goods (category 1-10) - Dangerous Goods Ordinance- Fire Protection Notice No.4
Inflammable items (e.g. thinner)
Items release toxic gas during combustion (e.g. insecticides)
Other Dangerous goods as listed in the Dangerous Goods Ordinance.
Conductive ladders
Cartridge operated fixing tools;
Asbestos products
8
4. Personal Protective Equipment
Safety Shoes – Studded sole, protective toe-cap safety shoes, highly resistant to
abrasion and comply with EN ISO20345 standard or equivalent
Reflective Vest
Safety Helmet
Others: whenever applicable
First Aid Kit
General Safety Requirement in MTR Stations
9
Reflective Vest
General Safety Requirement in MTR Stations
Separable Reflective Vest (for Trackside)
10
Safety helmet
According to the guidelines from Labour Department, contractors must use the safety helmets with Y-shape Chin Straps that comply with safety standard e.g. EN397.
General Safety Requirement in MTR Stations
Inspection label, (with expire date)
11
General Safety Requirement in MTR Stations
Others: whenever applicable
– Safety Gloves
Safety gloves should be used at jobs involving:
spring mounting /
cutting job / manual handling etc. as appropriate.
Safety Gloves with EN388 ( cut and abrasive resistance).
For Example:
EN388: 4542
12
5. Working Tools and Equipment - step platform and hop-on platform
For work-above-ground below 2m, light-duty working platforms such as step platform with EN131and hop-on platform should be used.
General Safety Requirement in MTR Stations
Step platform and hop-on platform should be inspected according to the check list from manufacturer with inspection label in every 6 months (with test date, next test day/ expiry date and with inspector’s signature)
step platform
hop-on platform
13
5. Working Tools and Equipment – Metal Scaffolding and Work at Height
Only properly trained workmen with adequate experience shall erect, alter and dismantle scaffolds
Ensure scaffold have been inspected by competent person with relevant statutory Form 5 issued to certify the good and safe working condition before use.
Scaffolding Plan must be enclosed.
Workers should move within the guarded working platform area and no over body extension at works are allowed.
Workers working on scaffold must wear anchored safety belt, with double clip lanyard.
Workers must wear appropriate PPE such as safety shoes, safety helmets and protective gloves when needed.
General Safety Requirement in MTR Stations
14
5. Working Tools and Equipment – Metal Scaffolding and Work at Height
When setting up metal scaffolding on escalators or travellators, timber boards (with thickness at least 18mm) should be used to cover the steps to provide an even surface and also to protect the escalator steps.
Only evenly distributed load (of not more than 120KG) can be applied on each escalator step surface.
Engaging Emergency brake by Escalator Contractor for locations with set up of metal scaffolding should be arranged prior the erection .
All metal scaffolding to be checked by a competent person and have to report in accordance with Form 5 , stating that the scaffold is in safe working condition
General Safety Requirement in MTR Stations
15
5. Working Tools and Equipment – Metal Scaffolding and Work at Height
A general guidance that 'substantial training and practical experience" of a competent person refers to a person:
i. who has satisfactorily completed a full-time formal training in metal scaffolding work organized by the Construction Industry Council Training Academy(CICTA), former Construction Industry Training Authority, or other similar metal scaffolding training courses/program and has possessed an experience of 4 years or more in metal scaffolding work (inclusive of experience under any formal training period); or
ii. who has at least possessed a higher certificate in civil or structural engineering and has satisfactorily completed a metal scaffolding training course/program organized by the CICTA or other similar metal scaffolding training courses/program and has possessed an experience of 1 year or more in metal scaffolding work (inclusive of experience under any formal training period); or
iii. who has satisfactorily passed the Trade Test on Metal Scaffolding of the CICTA and has possessed an experience of 4 years or more in metal scaffolding work (inclusive of experience under any formal training period).
General Safety Requirement in MTR Stations
16
Set up of a fall arrest system when working at locations with risk of falling
The independent lifeline should be fixed securely on the sub-
ceiling frame
General Safety Requirement in MTR Stations
17
6. Hot Work
NO hot work is recommended during installation, all items shall be pre-fabricated and
install/fix onto designated area only.
Any hot work need to apply in advance and subject to approval and additional charge.
General Safety Requirement in MTR Stations
7. Electrical Appliances and Electrical Wiring Code of Practice for the Electricity (Wiring) Regulations (the updated revision)
Please also reference to Page 41 & 42
18
Contents
1. Site inspection and measurement
2. Method Statement
3. Fixing Drawing
4. Material Submission
5. JCDecaux Competent Person
6. On site working team
7. Job Briefing, Safety Briefing
8. Installation procedures
9. Completion of job and sign off
10. Dismantling / Removal of Feature Ads (repeat item 5 to 9)
Installation Procedure of Feature Ads
19
1. Site inspection and measurement
General
All contractors are compulsory to have a site inspection and measurement prior to the method statement and fixing drawing submission, and have final site inspection and measurement 2 weeks prior to the installation . All these activities can only be carried out at the non-traffic hours, and from Mon-Wed only. Contractor need to inform JCDecaux at least one working day in advance for such arrangement.#
During the site inspection, shall made sure the following MTR facilities should NOT be covered, blocked during installation
❖ Skirting of walls and pillars are not allowed to cover.❖ Hanging signages, clocks, wall mounted signages.❖ Smoke detectors, ventilation shafts, sockets & Switches.❖ Fire hose reel and other emergency plungers.
Installation Procedure of Feature Ads
20
Installation Procedure of Feature Ads
1. Site inspection and measurement
While access doors and panels cannot be blocked, sticker need to have die cut(including key hole) and the wordings shall be remained or relocated upon approval from MTR. (SW – Switch Board at the VE panel)
Extra buffer time should be allowed for the areas where require extra permit/ insurance/ documents etc., such as trackside, depot. Please reference to MTR By-Laws and Operational Requirements and MTR《Railway Safety Rules》
Contractors who assess the trackside/ PSD must have valid MTR RSI / CBE Green Label Permit .
If contractors not sure about the installation feasibility or items can be blocked or not, JCDecaux will provide technical assistance and need to be arranged in advance.
21
2. Method Statement
Written document to describe the location of work, scope of work, procedure of work, working team in charge, contact details & Material sample/ Structural calculation report or certificate ( if applicable) Also the statement shall mention the contractor shall be responsible the insurance (minimum limit of indemnity: $50,000,000) and liability for their company’s staff and sub-ordinate and associate.
Contact JCDecaux C/P prior to carry out installation
Safety briefing, Job briefing to working team, including sub contractor. On site working team PPE & working tools checking
Installation Procedure of Feature Ads
22
2. Method Statement
Setting up working tools and Installation, progress monitoring
Job completion, safety inspection
Report to JCDecaux C/P to sign off
Installation Procedure of Feature Ads
23
Installation Procedure of Feature Ads
3. Fixing Drawing
Drawing to demonstrate the fixing details and use of material.
Drawing should be cleared and easy understanding, Dimension shall be mentioned within drawing
Installation location
Mock up of finished Feature Ads
Use of material ( should match with the method statement)
Method of fixing ( should clear demonstrate fixing details)
24
Installation Procedure of Feature Ads
4. Material Submission
All Materials used for installation will be requested to have a submission with material specification/ component and fire retardant rating.
Decorative material: BS 476 part 7 class 1 (fire spread rate) , BS EN 45545(Railway applications. Fire protection on railway vehicle)
Electrical material: Electrical Appliance must have, IEC60335 together with CE cert, LCD, Plasma TV must have IEC 60065 with CE cert, Lighting must have type test certificate EN60598 and CE cert. LSOH cable should be used for wiring.
Other type test certificate are subject to approval and will have longer lead time.
Installation procedure: should follow electrical wiring regulation of EMSD code of practice.
For pre approved materials, please keep the invoice/ deliver note for checking upon request.
25
Installation Procedure of Feature Ads
5. JCDecaux Competent Person (C/P)
Represents JCDecaux Transport as the on site person in charge
Should contact JCDecaux Transport Competent Person before installation.
JCDecaux C/P will perform an on site briefing before shipping in the material and carry out the installation
No installation shall be carried out without approval from JCDecaux Transport C/P.
JCDecaux C/P will check and verify the all the documents and qualification of the working team. To provide necessary information and assistance.
Contact 聯絡人:Depot 27509086, C Wong @9121 5126, K K Wu @9121 5124
Shall contact JCDecaux C/P after the installation completed, and need the approval of JCDecaux C/P before sign off.
26
Installation Procedure of Feature Ads
6. On Site Working Team
Shall have an on site leader to represent the contractor’s company as well as the sub-contractor and their associate.
To be responsible for overall safety briefing, job briefing equipment checking before carry out the assignment.
To get the approval from JCDecaux C/P for installation and report to JCDecaux C/P after the installation job completed.
To monitor whole installation process as well as quality, define any necessary safety measurements and ensure the safety of the construction site. Also protect any dangerous situations to person or property within the work area
27
7. Job Briefing and Safety Briefing
To made sure every individual team member of working team well aware the escape route within station/ work site when there is fire or any other emergency situation.
To made sure every individual team member had equipped and have adequate knowledge to use the PPE and all working tools in safety manner.
To made sure every individual team member understand their scope of work and do not infringe other location beyond their scope of work.
Report to the team leader when there is any abnormal situation and/or damage of MTR facilities
Installation Procedure of Feature Ads
28
Installation Procedure of Feature Ads
8. Installation Procedures
Prior to installation, team leader shall take photo to any damages at the installation location, If any damages are found after the campaign or removal, the remedial costs may be borne by the contractor.
Contractor to ensure the installation procedures can meet related guidelines and station arrangement (e.g. to make sure appropriate protection are applied for station facilities, to monitor safety requirements for work at height are complied, etc)
Working team shall, according to the approved method statement and fixing drawing, to carry out the installation work.
Working team shall, cease the installation if they did not bring/equip with the approved material, tools. No works can be done until approved material, tools are brought on site.
If any electrical installation involved, WR01 form will be signed by licensed electrician after job completed ( or submit the WR01 form on the next day to JCD Office). Team leader shall be responsible for the submission to JCDecaux C/P.
Working team shall not perform any other duty unless approved by JCDecaux in writing
Incident Report – Any Incident found shall report to JCDecaux C/P Immediately
29
Installation Procedure of Feature Ads
9. Completion and Sign off
Working team leader shall, made sure the job is completed and installation is secure enough before asking JCDecaux C/P to counter check.
All feature Ads installation shall be end at 4:30am and leave station before 5:00am.
Shall clear the site and made sure no rubbish and working tools left behind.
Shall made sure all staffs and associates have left the MTR station/ facilities.
Completion report has to be submitted to JCDecaux Technical Department in 2 working days for certifying the completed installation is according to the approved fixing method.
Approved Fixing Drawing and Method Statement shall be attached in the completion report with the company chop and signature of the Contractor person in-charge.
30
10. Dismantling/ Removal of Feature Ads
Working team leader shall, contact JCDecaux C/P prior to carry out dismantling/ removal
Removal of Feature Ads requires at least 2 workers to carry out duty. If metal scaffolding is involved, at least 3 workers are required.
Metal Scaffolding set up shall reach the highest point of installation
Shall clear the site and made sure no rubbish and working tools left behind.
During removal of Feature Ads installation, besides rubbish and working tools, residue of the sticker had to be removed as well.
Ceiling and wall drillings should made good after removal of Feature Ads installation
Shall made sure all staffs and associates have left the MTR station/ facilities.
Installation Procedure of Feature Ads
31
Installation Procedure of Feature Ads
10. Dismantling/ Removal of Feature Ads
Working team leader shall carry out dismantling/removal and the following cleaning procedure.
Wear appropriate PPE. such as safety eye goggle, mask, protective gloves etc., when needed.
Prepare the detergent, read the instruction / label stuck on the containers carefully before using.
Clean the unit, VE panel and glass panel with diluted detergent, ie. (3M Citrus Base Cleaner), until all dirt, dust and glue are removed.
Rinse the unit with water.
Dry the unit, VE panel and glass panel with a white towel until completely dried.
Remove the cleaning equipment, working tools and rubbish from the concourse area after
work.
Another JCD CP will conduct inspection after the cleaning in order to ensure the unit, VE
panel and glass panel are keeping in clean and tidy condition
32
Typhoon and Other Emergency Requirement
All contractors shall standby to depost exterior sites during the hoisting of typhoon signal no.1 and depost all exterior sites right after the hoisting of No.3.
Please contact JCDecaux Transport traffic department for arrangement with the Station before carrying out the deposting job. Other situations such as strong monsoon or adverse weather conditions, JCDecaux Transport shall request the contractor to remove the exterior sites without prior notice.
There will be no posting/ deposting/ installation of Feature Ads during the hoisting of Typhoon signal nos. 8/9/10 and black rainstorm warning. Posting and Deposting will be resumed 2 hours after the lowering of Typhoon signal to No 3. If the signal had been lowered after 12 midnight, there will be no posting/ deposting/ feature ads installation until the on the following night.
33
Use of Materials
Poster/Stickers
❖ Yupo paper
❖ Back lit film
❖ Duratran
❖ Vinyl
❖ Artpaper/ removable sticker
Forex board
Polycarbonate
Vinyl
Other Materials
Electrical Items
Use of Materials
34
Use of Materials
Poster Ads Production method
4 sheet –Digital printing on Yupo Paper (100grams), Digital printing on back lit film, Duratran
12 sheet - Digital printing on Yupo Paper (100 grams), Digital printing on back lit film, Duratran
Solus - Digital printing on Yupo Paper, Digital printing on back lit film, Duratran, Digital printing on Vinyl ( please be reminded that some Solus require eyelet)
Escalator crown panel/ Broadview banner – Digital printing/ Offset printing on strawboard with gloss art paper, Digital printing on removable sticker with strawboard backing
Scrolling units ( 6 sheet, 12 sheet) - Digital printing on Yupo paper
*** Printing Materials with joint will not be accepted***
35
Removable Sticker
• For both Train formats and Station formats:• Stickers – 3M 8648• Stickers – 3M IJ20 • Stickers – 3M IJ1220• Stickers – 3M IJ3552C• Stickers – Mactac MACal 9800Pro
• For Stations only:• Stickers – Ritrama RI-Jet 100• Stickers – Avery MPI-3001 and Avery MPI-3002• Stickers – Mactac Digitrans• Stickers – 3M 8150 (Clear Sticker)• Stickers – Ritrama RI-Jet 100 ASP30 (Clear Sticker)• Stickers – 3M Di-Noc Film (Permanent Sticker)**• Stickers – 3M Controltac Plus 162 with 3M over-laminate 3645 (Floor Sticker)
• For any necessary lamination of stickers for in-train format: only 3M 8648 laminated with 3M 8936 is allowed.
• VHB tape (brand 3M, reference no. 4945)– width 1”
• **Combination of using 3M Di-Noc Film and 3M IJ3552C together are specific for solus panel sticker extension at HOK ITCI.
Use of Materials
37
Vinyl
Vinyl shall have the BS 476 Part 7 Class 1 Certificate
Example: Banner at KOWExample: Bunting at CEN
Use of Materials
Blockout Matte:
Heytex: HO51M25W00M
Backlit Vinyl:
Lumina II 15 oz FR
Ferrari Expolit 501
38
Requirements for Vinyl applications
For each single installation, application of Vinyl materials should not exceed one sheet in a surface area of 4m2
Minimum height clearance of 2500mm from floor level to the Vinyl material to avoid reaching from passengers
Vinyl material shall be keep away from flammable items or transformers or other objects that will give out heat
Fire retardant paint must be sprayed on both sides of Vinyl materials
Use of Materials
39
Example:
Max. 4m2
Wall Wall
Area of Feature Ad
Minimum height clearance of 2500mm from floor level to the Vinyl material
Vinyl materials should not exceed one sheet in a surface area of 4m2
Use of Materials
Requirements for Vinyl applications
40
PolycarbonatePolycarbonate shall have the BS 476 part 7 class 1 certificate
Use of Materials
LenticularLenticular shall have the BS476 Part 7 Class 1 certificate
Requirements for Other Material
Wood and other combustible material
Wood or plywood materials are not recommended to use in MTR stations
Other combustible materials will be subject based on approval
Fire retardant solution is NOT an exemption measurement for using the combustible material in MTR stations and facilities.
41
Use of Materials
Electrical Items
Use of electrical appliances shall get the approval from MTR
MTR electricity output: 240V
All Electrical appliances must comply to HK Electricity Ordinance, law & regulations and BS standard : e.g. Electrical Appliance must comply to the Electrical Products (Safety) Regulations
LSOH cabling must be used. It shall be at least 450V/750V grade and must have BS50525-3-41 and BS7211
Proper earthling is required
RCBO must be applied for any connections between power source and electrical appliances
42
Electrical Items
Must comply with IEC Standard, BS Standard
Electrical Appliance must have, IEC60335 together with CE cert
LCD, Plasma TV must have IEC 60065 with CE cert
Lighting must have type test certificate EN60598 and CE cert.
Spot Light and LED must have EN60598-1, EN61347-2-2, EN55015, EN60968, EN61000-3-2, EN61000-3-3, EN61547, EN62031 and EN62471
Defective socket & extension cord cannot be used
Use of Materials
43
1. MTR stations ( Concourse, passage, platform)
MTR Particular Feature Ads Guideline for Different Formats
4 sheet, 12 sheet sticker extension
4 sheet, 12 sheet covered with forex board
4 sheet, 12 sheet covered by backdrop
12 sheet sticker extension
4 sheet covered with forex board
12 sheet covered by backdrop
44
1. MTR stations ( Concourse, passage, platform)
No sticker shall be applied onto clear polycarbonate panel.
Material ( e.g. metal tube/ aluminum tube) shall not have sharp edge(s) to avoid damages to the clear polycarbonate panel. Recommend that metal tube/ aluminum tube wrapped by sticker.
Access panel and doors shall be die cut or have accessible hinge door.
MTR Particular Feature Ads Guideline for Different Formats
45
1. MTR stations ( Concourse, passage, platform)
POW, Solus POW, Pillars, Random Sticker, Sticker on glass pane
Clearance zone 500mm to MTR facilities and 800mm to other advertising
Wall skirting cannot be covered
Groove between VE panels and groove between mosaic tile wall and VE panel should have PC strip to underlay.
Super graphics at KOT station to Exit C (Festival Walk) could not be covered.(e.g.page 56)
SW signage – Shall leave die cut or have permission to relocate in advance
MTR Particular Feature Ads Guideline for Different Formats
46
1. MTR stations ( Concourse, passage, platform)
Clearance zone 500mm to MTR facilities and 800mm to other advertising
800mm 500mm 500mm
MTR Particular Feature Ads Guideline for Different Formats
47
1. MTR stations ( Concourse, passage, platform)
500mm clearance should be kept from the signage frame
500mm
MTR Particular Feature Ads Guideline for Different Formats
800mm clearance shall be kept between
advertisement and commercial facilities (e.g.
advertising panel)
500mm clearance shall be kept between
advertisement and station facilities/MTR
internal information
48
500mm
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
500mm clearance with exit signage
800mm
In case of 2 separate walls, POW can be posted up to the border line as marked in RED, minimum clearance should be kept for the station notice.
49
MTR stations ( Concourse, passage, platform)
500mm clearance should be kept from the signage frame and 150mm clearance should be kept if not embedded in POW, otherwise, 150mm plain colour clearance should be kept if embedded in POW
Sticker wrap around
is not recommended.
150mm
500mm
MTR Particular Feature Ads Guideline for Different Formats
50
1. MTR stations ( Concourse, passage, platform)
In case of 2 separate walls, no need to apply 500mm clearance with way finding signage
MTR Particular Feature Ads Guideline for Different Formats
51
500
mm
500
mm
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
plain colour or no sticker installation
500mm clearance space with plain colour or no sticker installation should be applied around the wall-mounted
directional signage (including way finding signage and station map)
52
1. MTR stations ( Concourse, passage, platform)
500mm clearance shall be kept btw advertisement
and station facilities (e.g. signage) if the station
facilities are not embedded in advertisement
Sticker could not wrap on the fire hose reel
MTR Particular Feature Ads Guideline for Different Formats
53
1. MTR stations ( Concourse, passage, platform)
For directional signage between lightboxes, if the edge of the lightboxes to the edge of the
directional signage is less than 500mm, then plain colour or no sticker clearance should be kept to
the edge of the lightboxes of both side
MTR Particular Feature Ads Guideline for Different Formats
54
1. MTR stations ( Concourse, passage, platform)
Wall skirting cannot be covered
MTR Particular Feature Ads Guideline for Different Formats
Wall Skirting cannot be covered
55
1. MTR stations ( Concourse, passage, platform)
Groove between VE panels & groove between mosaic tile wall & VE panel shall be placed with 3M strip underlay,
MTR Particular Feature Ads Guideline for Different Formats
56
1. MTR stations ( Concourse, passage, platform)
Super graphics at KOT station to Exit C (Festival Walk) could not be covered.
MTR Particular Feature Ads Guideline for Different Formats
57
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
SW signage – Shall leave die cut
58
150mm
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
Sticker wrap could not excess the red line. 150mm clearance should be kept away from the Station control Room window.
59
1. MTR stations ( Concourse, passage, platform)
Minimum clearance should be kept from the door
Minimum clearance
MTR Particular Feature Ads Guideline for Different Formats
60
1. MTR stations ( Concourse, passage, platform)
In case of lightbox is next to station map, sticker extension could be posted up to the edge of the lightbox.
MTR Particular Feature Ads Guideline for Different Formats
61
1. MTR stations ( Concourse, passage, platform)
If embedded in POW, die cut for the electricity socket/ plug, if not embedded in POW, 150mm clearance should be kept.
Socket
MTR Particular Feature Ads Guideline for Different Formats
62
Socket/ plug
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
Die cut for the electricity plug. If for socket plate, covered by creative with die cut for access.
63
1. MTR stations ( Concourse, passage, platform)
For Hanging Signage, no need to keep clearance.
MTR Particular Feature Ads Guideline for Different Formats
64
Exhaust Hole
Socket
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
Die cut for this exhaust hole
65
MTR stations ( Concourse, passage, platform)
150mm clearance should be kept for the safety sticker at Exit.
MTR Particular Feature Ads Guideline for Different Formats
150mm
66
Arrow Sticker
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
Die cut around the first and the last round shape arrow sticker.
67
notices and facilities
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
Die cut for the handrail joint and 150mm plain color clearance should be kept on notices and facilities.
68
1. MTR stations ( Concourse, passage, platform)
150mm clearance should be kept from escalator certificate.
150mm clearance
MTR Particular Feature Ads Guideline for Different Formats
69
1. MTR stations ( Concourse, passage, platform)
150mm plain colour clearance should be kept for
MTR’s height measurement sticker
MTR Particular Feature Ads Guideline for Different Formats
800mm plain colour clearance should be kept.
Poster on round pillar should kept 800mm plain
colour with the advertising measurement sticker
70
500mm clearance should be kept and no wrap around
Plain color should be
used for the area of
luggage measuring unit
150mm plain color clearance
if embedded in POW
500mm clearance if
not embedded in POW.
Sticker could not wrap on the door
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
71
150mm clearance should be
kept and no wrap around
500mm clearance should be kept
and 150mm plain color clearance
if embedded in POW
150mm plain colour clearance
should be kept for safety stickers.
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
72
If not embedded in POW, 500mm clearance should be kept.
If embedded in POW, 150mm plain colour clearance should be kept.
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
73
150mm plain colour clearance if embedded in POW
150mm clearance if not embedded in POW
If this sticker is separately posted, 150mm plain colour clearance
if embedded in POW or 150mm clearance if not embedded in POW.
For the “No Bill Posting” sticker, 150mm clearance shall be kept and
no sticker wrap around.
MTR Particular Feature Ads Guideline for Different Formats
MTR stations ( Concourse, passage, platform)
74
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
For sticker clearance for break glass alarm, a forex box is required to cover it before posting in order to avoid any damages to the alarm.
75
Die cut and no sticker wrap
within the area marked in red
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
76
No sticker wrap for the area between the lines.
Relocation of the energy saving notice
is not recommended
No sticker wrap for the area between the
yellow lines
For CEN Exit K only
MTR Particular Feature Ads Guideline for Different Formats
77
1. MTR stations ( Concourse, passage, platform)
Sticker on Pillar
Pillar’s wall mount signage and facilities shall have 150mm of plain colour clearance. Black and red colours are not recommended.
Pillar’s sticker signage cannot be removed or remounted.
Pillar’s emergency stop plunger and Help Line shall have 150mm clearance space.
Station names shall have 250mm clearance space, and no sticker installation should be
applied on the area above station names.
MTR Particular Feature Ads Guideline for Different Formats
78
1. MTR stations ( Concourse, passage, platform)
Plain colour sticker or no sticker installation should be applied on the side of the directional
signage on rectangular pillar (including way finding signage and station map).
500mm clearance space with plain colour or no sticker installation should be applied around
the side of the directional signage on circular pillar (including way finding signage and
station map).
500mm clearance space with plain colour or no sticker installation should be applied around
the wall-mounted directional signage (including way finding signage and station map)
MTR Particular Feature Ads Guideline for Different Formats
79
signage
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
150mm plain colour clearance should be kept for the signage and facilities.
80
150mm plain colour clearance is preferred if advertisement embedded with station facilities
e.g. signage
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
81
1. MTR stations ( Concourse, passage, platform)
• For signages within feature ads area, appropriate protective measures (e.g. Forex board) should be
applied to avoid any damages to the signages and take out after installation.
MTR Particular Feature Ads Guideline for Different Formats
82
MTR Particular Feature Ads Guideline for Different Formats
150mm plain color should be kept
1. MTR stations ( Concourse, passage, platform)
Die cut for the socket. If the signage cannot not be relocated, 150mm plain color
should be kept.
83
1. MTR stations ( Concourse, passage, platform)
Pillar’s sticker signage cannot be covered or removed.
MTR Particular Feature Ads Guideline for Different Formats
84
150mm clearance must be
kept for emergency plunger
and Help Line
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
85
150mm clearance shall be kept btw advertisement or emergency stop plunger if emergency stop plunger / help
line is embedded in advertisement. Station names shall have 250mm clearance space, and no sticker
installation should be applied on the area above station names. The advertisement should not cover visual.
MTR Particular Feature Ads Guideline for Different Formats
emergency
stop plungerStation
Name
1. MTR stations ( Concourse, passage, platform)
250mm250mm
250mm
86
No sticker installation
should be applied on
the area above station
names,
Station names shall have
250mm clearance space
MTR Particular Feature Ads Guideline for Different Formats
87
Stickers to be cut-out along green lines
MTR Particular Feature Ads Guideline for Different Formats
88
1. MTR stations ( Concourse, passage, platform)
Plain colour sticker or no sticker installation should be applied on the side of the directional
signage on rectangular pillar (including way finding signage and station map).
MTR Particular Feature Ads Guideline for Different Formats
89
1. MTR stations ( Concourse, passage, platform)500mm clearance space with plain colour or no sticker installation should be applied around the side of the
directional signage on circular pillar (including way finding signage and station map).
MTR Particular Feature Ads Guideline for Different Formats
500mm
500mm
90
1. MTR stations ( Concourse, passage, platform)
Plain colour sticker or no sticker installation should be applied on the side of the directional signage
on pillar (including way finding signage and station map).
Plain colour sticker
or no sticker
installation
MTR Particular Feature Ads Guideline for Different Formats
91
1. MTR stations ( Concourse, passage, platform)
Die cut for temperature humidity sensor.
humidity sensor
MTR Particular Feature Ads Guideline for Different Formats
92
1. MTR stations ( Concourse, passage, platform)
Die cut for socket and the handrail joint.
handrail joint
socket
MTR Particular Feature Ads Guideline for Different Formats
93
1. MTR stations ( Concourse, passage, platform)
Minimum clearance from the access reader should be kept.
Access Reader
MTR Particular Feature Ads Guideline for Different Formats
94
No clearance is needed
• No Clearance is needed for rubbish bins and seats
MTR Particular Feature Ads Guideline for Different Formats
95
For Designer Chair
• If the distance between the edge of the pillar to the edge of the Designer Chair is larger than 100mm, the sticker should stick to the bottom of the pillar.
• if the distance between the edge of the pillar to the edge of the Designer Chair is lesser than 100mm, the sticker can stick to the edge of the chair.
• For die-cut design, It is subjected to MTR approval.
MTR Particular Feature Ads Guideline for Different Formats
if the distance between the edge of the pillar to the edge of the Designer Chair is lesser than 100mm, the sticker can stick to the edge of the chair.
If the distance between the edge of the pillar to the edge of the Designer Chair is larger than 100mm, the sticker should stick to the bottom of the pillar.
96
HOK “Living Art” Sticker on pillars at Supernova Zone
• For HOK Supernova Zone, the “Living Art” sticker on pillars have to be dismantled before Feature Ad and have to be re-print and re-install after campaign end. Extra cost will be charged for the dismantling, printing and re-installation work by MTR
MTR Particular Feature Ads Guideline for Different Formats
97
1. MTR stations ( Concourse, passage, platform)
For Causeway Bay experiential site, the MTR Fare Map should be covered by a plain colour sticker which matched with station colour.
Backdrop
MTR FareMap
MTR Fare Map
MTR Fare Map
should be
covered by a
plain colour
sticker which
matched with
station colour.
MTR Particular Feature Ads Guideline for Different Formats
98
50mm from the outer
edge of the sticker
100 mm from the metal frame
It shall be covered by 3M removable sticker with plain
color, sticky side of the removable sticker cannot touch
the surface of the fare table
The bottom edge will be fixed by full length
3M VHB on metal frame
Installation method as below:
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
99
Sticker with Plain Color Clearance
1. MTR stations ( Concourse, passage, platform)
• At CAB Sogo Concourse, plain color clearance should be kept between DEC sticker
extension and Showcase sticker extension
MTR Particular Feature Ads Guideline for Different Formats
100
For all experiential sites, if there is no floor sticker visual for the campaign, contractor must applied 3M Vinyl Tape 471 (50mm wide) at all side of site boundary to indicate the exhibition(experiential) area. Contractors are responsible for the masking tapes on the floor shall be in good presentable, safe manner and shall removing sticker residue and made good the site immediately after the booking period.
MTR Particular Feature Ads Guideline for Different Formats
1. MTR stations ( Concourse, passage, platform)
101
Concourse Bunting
General Guideline
Headroom clearance 2350mm/H
Bunting shall not block MTR signage, Ventilation shaft, CCTV, Smoke detector (recommended clearance space, 6m)
MTR will assess the weight of bunting and give advice bunting can be hanged on ceiling sub frame or require anchor bolt fixing
False Ceiling shall not be the fixing point(s) or supporting point(s) for any Feature Ads installation unless written approval is received
MTR Particular Feature Ads Guideline for Different Formats
102
For Concourse Bunting:
• Pockets shall allow 12mm Diameter metal rod to pass through
12mm Dia Pocket
120cm
50cm
MTR Particular Feature Ads Guideline for Different Formats
103
HOK Bunting
• For HOK bunting, the minimum headroom clearance is 3 meters, and the bunting size is approx. 4-5 m/H, subject to the final site measurement
MTR Particular Feature Ads Guideline for Different Formats
104
For TST only只適用於尖沙咀
MTR Particular Feature Ads Guideline for Different Formats
Te.g. TST Platform
The Numbers are for reference only, subject to MTR approval
105
1. MTR stations ( Concourse, passage, platform)
TV Ring• Advertisement shall not block the TV screen
• Advertisement shall not block the down light and speaker
• For TV screens, appropriate protective measure (e.g Forex board)
shall be applied to avoid damage to the TV screens and taken out
after the installation work.
• For the ceiling panel, appropriate protective measure
(e.g Forex board) shall be applied during campaign period.
Sticker shall not be stuck to the ceiling panel directly to avoid paints
peel off. Before installation, Ceiling Panel
without forex board and sticker
After installation, Ceiling Panel with
forex board and stickerForex board with sticker
MTR Particular Feature Ads Guideline for Different Formats
106
1. MTR stations ( Concourse, passage, platform)
Ticketing machine sticker
Both Station Dispenser shall have no grove and space for littering
MTR Particular Feature Ads Guideline for Different Formats
107
1. MTR Stations (Ticketing Machine)
• The special advertisement on back should not block the key hole
• The sticker on the back should have a cut out for door access
MTR Particular Feature Ads Guideline for Different Formats
108
1. MTR Stations (Glass Pane)
For Glass Pane, there should be 1 panel clearance in between every 2 panels.
Advertisements must be applied on both sides of the glass pane.
No advertisement is allowed on the swing doors
MTR Particular Feature Ads Guideline for Different Formats
109
1. MTR stations ( Concourse, passage, platform)
Staircase, Floor sticker
Staircase (vertical side) shall leave 1” clearance at the non-slippery edge
Sticker can be applied on vertical face only. Stepping edge is not allowed
All the walking guide path shall leave 450mm clearance
All the slope passage non-slippery strip must die cut
MTR Particular Feature Ads Guideline for Different Formats
110
Stepping Edge
No sticker can be applied on stepping edge (horizontal)
Staircase (vertical) shall leave 1” clearance from the non-slippery edge
MTR Particular Feature Ads Guideline for Different Formats
1”
1”
111
1. MTR stations (Concourse, passage, platform)
MTR Particular Feature Ads Guideline for Different Formats
All the tactile guide path and boundary lines shall leave 450mm clearance space
The boundary should be kept 450 mm clearance
at the front and back.
450mm
450mm
450mm
112
1. MTR stations (Concourse, passage, platform)
All the slope passage non-slippery strip must be die cut.
MTR Particular Feature Ads Guideline for Different Formats
113
Escalator Crown Panel Extension
The sticker should be covered the whole wall from top to bottom beside the Escalator at the red dotted line.
The safety sticker on the wall beside the Escalator should be kept 150mm clearance.
MTR Particular Feature Ads Guideline for Different Formats
114
Escalator Crown Panel Extension
500mm clearance space with plain colour installation should be applied around the safety panel signage
MTR Particular Feature Ads Guideline for Different Formats
115
Escalator Crown Panels Extension
The sticker should be wrapped in the middle between crown panels at the red dotted line.
MTR Particular Feature Ads Guideline for Different Formats
116
Balustrade
Balustrade safety sticker cannot not be covered > 50%
Uncovered balustrade safety sticker should be die cut, but cannot be removed and remount onto the advertiser sticker, and the covered safety sticker must be properly protected.
Emergency plunger and triangular safety message shall have at least 150mm clearance.
MTR Particular Feature Ads Guideline for Different Formats
150mm 150mm
150mm
117
Emergency plunger and triangular safety message shall have at least 150mm clearance.
MTR Particular Feature Ads Guideline for Different Formats
150mm
150mm
118
Balustrade safety sticker at the start and end of the escalator shall have at least 150mm clearance.
MTR Particular Feature Ads Guideline for Different Formats
119
Tailor-made Escalator Crown Panel Extension with 3D pop up
Total Extension width 6 inches horizontally ( maximum 5 inches for single side horizontally)
height maximum extension at the top part is 5”, and bottom side maximum is 1”
Total weight is limited to 4kg
MTR Particular Feature Ads Guideline for Different Formats
120
5” 1”
5”
1”
Escalator Crown Panel
Card board extension less than 5”
MTR Particular Feature Ads Guideline for Different Formats
121
Secure the inner frame with VHB adhesive
Secure the Top edge of Inner frame with VHB adhesive
MTR Particular Feature Ads Guideline for Different Formats
122
The thickness of the interior crown panel is 35mm
35mm
Support with white Cardboard (size 490mmx690mm)
MTR Particular Feature Ads Guideline for Different Formats
123
Secure by 3 numbers of VHBadhesive
No need to apply VHB adhesive
Inner Width 535mm
MTR Particular Feature Ads Guideline for Different Formats
124
Avoid adhesive residues,
cardboards are glossy
finished, no matt finished
MTR Particular Feature Ads Guideline for Different Formats
125
3mm L shape card board needs to be applied on the popup for supporting
Die Cut Design Tailor made escalator Crown panel
MTR Particular Feature Ads Guideline for Different Formats
126
Die Cut Design Tailor made escalator Crown panel
Staples need to be applied on the extension for further security
MTR Particular Feature Ads Guideline for Different Formats
127
Tailor-made Crown Panel with Pop Up
Cardboard extension max. 5mm/D
Pop up should be secure on the Tailor Made Crown Panel
MTR Particular Feature Ads Guideline for Different Formats
128
Standard Cardboard with Pop Up
Cardboard extension max. 10mm/D
Top and Bottom shall have enough rooms for insertion to the crown panel
MTR Particular Feature Ads Guideline for Different Formats
129
Standard Cardboard with Pop Up
Staples should be used to secure Pop Up. A layer of clear sticker to protect the escalator frame
MTR Particular Feature Ads Guideline for Different Formats
130
2. MTR stations (Trackside)
Platform Screen Door
Platform Screen Door sticker can only be applied on the trackside when installing on the
moving door; sticker can be applied on the concourse side for fixed panel ( except for
AEL)
Step platform / Hop-on platform cannot lean on PSD during installation.
MTR Particular Feature Ads Guideline for Different Formats
131
Sticker on Platform Screen
150mm clearance and no sticker wrap around for the signage at the top
The sticker on Platform Screen Door should have at least 30% clearance and not to block the Train Door Window and
Saloon Window. For ISL, KTL and TWL, the maximum height of sticker is 800mm from platform screen glass toe edge. For
TKL and TCL, the maximum height of sticker is 400mm from glass door.,
All touch up shall made with cutting matt to protect Platform Screen
800mm
Apply in ISL, KTL and
TWL
Apply in TKL and
TCL
400m
m
MTR Particular Feature Ads Guideline for Different Formats
132
Sticker on Platform Screen
• “External Door Isolating Cock” on the bottom part of train body shall be die cut and the sticker shall keep 300mm clearance
from ground.
300mm clearance
Sticker area
External Door Isolation Cock
MTR Particular Feature Ads Guideline for Different Formats
133
~557mm
~705mm
~705mm ~143mm
Die cut window: 1000mm(W) x 250mm(H)
Additional diecut area on door leaf:
~935mm(W) x ~393mm(H)
• Above figures are for reference only, actual dimension should be based on onsite measurement.
MTR Particular Feature Ads Guideline for Different Formats
Die cut on the car number on train body and a clearance of 1000mm(W) x 250mm(H) is needed.
If door leaf of the PSD covered the car number, additional die-cut area on door leaf: ~935mm(W) x ~393mm(H) is
needed(p.145)
134
~557mm
~705mm~705mm
~143mm
Die cut window: 1000mm(W) x 250mm(H)
Affected area when the PSD is open:
~935mm(W) x ~393mm(H)
• Above figures are for reference only, actual dimension should be based on onsite measurement.
MTR Particular Feature Ads Guideline for Different Formats
135
Sticker on Platform Screen
After getting approval from MTR, contractor is allowed to temporary remove the Safety
sticker during the campaign period.
After the campaign period, contractor should reinstate back the Safety sticker.
MTR Particular Feature Ads Guideline for Different Formats
136
2. MTR stations (Trackside)
As the trackside area installed a lot of cables and other electrical/ electronics devices, all the
contractors should not touch, remove or relocate any devices or facilities located at track side
area.
Portable lighting device shall be equipped for illumination.
Trackside Billboard
Trackside Billboard MUST use metal scaffolding to set up and removal.
Trackside billboard posting or deposting should have minimum 4 team members to work on.
MTR Particular Feature Ads Guideline for Different Formats
137
MTR Particular Feature Ads Guideline for Different Formats
3. MTR In-train
Inspection of in train damage together with JCD C/P shall be carryout prior to installation.
All the touch up shall made have cutting matt to protect the in train surface.
Gangway in between train compartment should not be covered.
All the rubber edge surrounding the Saloon window and train door window shall not be
covered.
138
• The sticker is horizontally centered with a top
alignment of the emergency ventilation window
• For TCL train, a underneath grey cardboard shall
be inserted into the in-train card area
• SNTSW format is not available for K-trains in
Kwun Tong & Tung Chung Lines
SNTSW – for Modernized and TCL Trains only
Train Line Width Height
HK Island, Tsuen Wan, Kwun Tong & Tsueng Kwan O, SIL Lines 500mm 900mm
Tung Chung Line 550mm 900mm
MTR Particular Feature Ads Guideline for Different Formats
139
Gangway in between train compartment shouldnot be covered.
MTR Particular Feature Ads Guideline for Different Formats
140
Notes for deposting sticker for in-train formats
• Before deposting of sticker, 3M Citrus Base Cleaner should first be applied on top corners of sticker
• Wait around 30 seconds for the action between cleaner and sticker before deposting
• Deposting of sticker for in-train formats should start from the top and towards the bottom
MTR Particular Feature Ads Guideline for Different Formats
Sticker
deposting
direction
141
A B C
Dimensions 1400mm 170mm 90mm
Saloon Window Sticker (TWL, KTL, ISL, TCL)
B
A
C
MTR Particular Feature Ads Guideline for Different Formats
142
A B C
Dimensions 1455mm 170mm 90mm
Saloon Window Sticker (SIL)
B
A
C
MTR Particular Feature Ads Guideline for Different Formats
143
35 35
sticker
area
260(W)
x
350(H)
1330mm
35
Size: 260mm(W) x 350mm(H)
Train Door Window Sticker (KTL, TKL and SIL)
MTR Particular Feature Ads Guideline for Different Formats
Sticker should be applied below 1330mm and
clearance of at least 35mm shall be kept between
the sticker and the window edge
144
M-Train
sticker area
430(W)
x
350(H)
1330mm
35 35
35
Size: 430mm(W) x 350mm(H)
Train Door Window Sticker (TWL and ISL)
MTR Particular Feature Ads Guideline for Different Formats
Sticker should be applied below 1330mm and
clearance of at least 35mm shall be kept between
the sticker and the window edge
145
35 35
sticker
area
260(W)
x
330(H)
1330mm
35
Size: 260mm(W) x 330mm(H)
Train Door Window Sticker (TCL)
MTR Particular Feature Ads Guideline for Different Formats
Sticker should be applied below 1330mm and
clearance of at least 35mm shall be kept between
the sticker and the window edge
146
MTR Particular Feature Ads Guideline for Different Formats
Sticker should be applied below 1330 mm and
clearance of at least 35mm shall be kept between
the sticker and the window edge
Train Door Window Sticker (AEL)
147
• For the die-cut train door window sticker, it should have round corners and is subjected to MTR final approval.
MTR Particular Feature Ads Guideline for Different Formats
Train Door Window Sticker
148
Airport Express Stations (Standee)
• The standee overall display size should not be larger than 1100mm(W) x 1500mm(H)
• The front board should be made of 20mm thick plywood, and fixed to and supported by a wooden stand of 440mm(W) x 484mm(H) x 352mm(L) x 20mm(T)
• 10kg sand bag must be put inside the wooden stand
• The surface of both front board and wooden stand should be plastic-laminated
Airport Express Particular Feature Ads Guideline for Different Formats
149
Airport Express Stations (HOK ITCI)
Airport Express Particular Feature Ads Guideline for Different Formats
• Combination of using 3M Di-Noc Film and 3M IJ3552C together are specific for soluspanel sticker extension at HOK ITCI.
150
Saloon Window Sticker – AEL
Sticker should be placed at the
top position of the saloon
window
Airport Express Particular Feature Ads Guideline for Different Formats
a
X
151
Max. 3 visual versions per train compartment
If Facing Seat Sticker
and Seat Back Sticker
on train at same period,
must be booked by
same product
Airport Express Particular Feature Ads Guideline for Different Formats
152
Airport Express Particular Feature Ads Guideline for Different Formats
Label on top of MTR facilities will
be cut out, and clearance would
be kept around the facilities (e.g.
30mm (cut out) clearance
around + 70mm plain colour
clearance (single colour) for
operation information (e.g. safety
/ warning / route map) and
20mm (cut out) clearance
around for AEL logo at window
column)
153
USB charger
Tentative socket
indication signage
(would be placed on
top or bottom of the
socket, depends on
actual situation)
• Die cut for socket
Airport Express Particular Feature Ads Guideline for Different Formats
154
• Die cut for socket
Die cut area
Airport Express Particular Feature Ads Guideline for Different Formats
155
• Seat Back Sticker
Foramt Location Display Area (W x H) in mm Quantity
Seat Back Sticker
Car 1 Approx. 265 x 110 Small size: 44 pcs
Total: 328 pcs / train(Small size: 168 pcs +Large size: 160 pcs)
Car 2Approx. 265 x 110 Small size: 16 pcs
Approx. 287 x 183 Large size: 32 pcs
Car 3Approx. 265 x 110 Small size: 16 pcs
Approx. 287 x 183 Large size: 32 pcs
Car 4Approx. 265 x 110 Small size: 16 pcs
Approx. 287 x 183 Large size: 32 pcs
Car 5Approx. 265 x 110 Small size: 16 pcs
Approx. 287 x 183 Large size: 32 pcs
Car 6Approx. 265 x 110 Small size: 16 pcs
Approx. 287 x 183 Large size: 32 pcs
Car 7 Approx. 265 x 110 Small size: 44 pcs
- Distribution of Seat back Stickers at different Cars
Airport Express Particular Feature Ads Guideline for Different Formats
156
• Seat Back Sticker
Large size: Approx. 287mm x 183mm
Airport Express Particular Feature Ads Guideline for Different Formats
Recommended