Mooreast MA7 Anchor: Development Process Of A New … TechEvent-MooringInd/Mooreast … · Mooreast...

Preview:

Citation preview

Mooreast MA7 Anchor: Development Process Of A New Anchor For The Offshore Mooring

Industry

Roderick Ruinen Mooreast Asia Pte Ltd

Contents Presentation • Introduction • Review of existing anchors and patents • Testing of scale models • Prototype testing • Structural verification

24/11/2015 2 SNAMES Technical Talk, November 2015

Introduction

24/11/2015 3 SNAMES Technical Talk, November 2015

Floating Oil & Gas

24/11/2015 4 SNAMES Technical Talk, November 2015

Floating Renewable Energy

24/11/2015 5 SNAMES Technical Talk, November 2015

Drag anchor development

24/11/2015

6

SNAMES Technical Talk, November 2015

Drag anchor development

24/11/2015 SNAMES Technical Talk, November 2015 7

• Anchor holding capacity (HC) increased over time: – Stone HC = 1 * Wanchor

– Stock anchor HC = 2 * Wanchor

– Flipper Delate / Stevin anchor HC = 20 * Wanchor

– FFTS / Stevpris HC = 50 to 100 * Wanchor

– Denla / Stevmanta (plate) HC = 100 to 175 * Wanchor

Drag anchor development

24/11/2015 SNAMES Technical Talk, November 2015 8

Anchor design process I. Define the requirements

– Review of existing anchors – Review (anchor) patents – Feedback from industry

II. Define different anchor models III. Test scale models and compare results IV. Proceed with model? Else back to step II. V. Build prototype model for testing VI. Offshore testing of prototype VII. Proceed with prototype? Else back to step II. VIII. Structural analysis of final design

24/11/2015 9 SNAMES Technical Talk, November 2015

Commercial offshore anchors Review of existing anchors

24/11/2015 10 SNAMES Technical Talk, November 2015

11

Holding capacity Ultimate Holding Capacity (UHC)

12 mT MAG 12 mT Stevpris Mk5 12 mT Stevpris Mk6

very soft clay 484 mT 393 mT 512 mT

medium clay - 551 mT 716 mT

hard clay / sand 874 mT 708 mT 921 mT

Ultimate Holding Capacity (UHC)

12 mT MAG 12 mT Bruce FFTS Mk4 12 mT Bruce FFTS PM

very soft clay 484 mT 393 mT 562 mT

medium clay - - -

hard clay / sand 874 mT 485 mT 630 mT

24/11/2015 SNAMES Technical Talk, November 2015

Commercial anchors

24/11/2015 12 SNAMES Technical Talk, November 2015

Commercial anchors

24/11/2015 13 SNAMES Technical Talk, November 2015

Commercial anchors

24/11/2015 14 SNAMES Technical Talk, November 2015

Commercial yacht anchors Review of existing anchors

24/11/2015 15 SNAMES Technical Talk, November 2015

Yacht Anchors

16 24/11/2015 SNAMES Technical Talk, November 2015

17

Yacht anchors

24/11/2015 SNAMES Technical Talk, November 2015

18

Yacht Anchors

24/11/2015 SNAMES Technical Talk, November 2015

Review of (anchor) patents

24/11/2015 19 SNAMES Technical Talk, November 2015

Patents

• Review of valid patents (technology can’t be used)

• Review of expired patents (technology can be used)

• Review of patent applications

24/11/2015 SNAMES Technical Talk, November 2015 20

Patents

24/11/2015 21 SNAMES Technical Talk, November 2015

Patents

24/11/2015 22 SNAMES Technical Talk, November 2015

Requirements

24/11/2015 SNAMES Technical Talk, November 2015 23

Requirements new anchor • Good penetration in hard soil, i.e. medium to dense sand and hard clays • Holding capacity similar (or higher) than that of the commercial anchors • Suitable for handling with a chaser • Stable on deck (when upside down) • Suitable for use in permanent and mobile moorings • Simple fabrication

24/11/2015 SNAMES Technical Talk, November 2015 24

Definition and testing of scale models

24/11/2015 SNAMES Technical Talk, November 2015 25

Models

24/11/2015 SNAMES Technical Talk, November 2015 26

Reference model

24/11/2015 SNAMES Technical Talk, November 2015 27

Test bed

24/11/2015 SNAMES Technical Talk, November 2015 28

Testing

24/11/2015 SNAMES Technical Talk, November 2015 29

0

100

200

300

400

500

600

700

800

900

1000

0 500 1000 1500 2000 2500 3000

Load

ach

ieve

d (k

g)

Drag Distance (mm)

Fluke Design #2

Fluke #2

Test results

Design Holding capacity [kg] Efficiency MA7#1 320 57.1 MA7#2 440 78.6 MA7#3 310 55.4 MA5P 250 41.7

24/11/2015 SNAMES Technical Talk, November 2015 30

Wear pattern after testing

24/11/2015 SNAMES Technical Talk, November 2015 31

Prototype selection

24/11/2015 SNAMES Technical Talk, November 2015 32

Prototype selection

24/11/2015 SNAMES Technical Talk, November 2015 33

Offshore Testing

24/11/2015 SNAMES Technical Talk, November 2015 34

Prototype anchor

• Fabrication of ± 1500 kg prototype testing

• Testing offshore Singapore

• Test with AHV

24/11/2015 SNAMES Technical Talk, November 2015 35

Location

24/11/2015 SNAMES Technical Talk, November 2015 36

Procedure

24/11/2015 SNAMES Technical Talk, November 2015 37

Sensor data

24/11/2015 SNAMES Technical Talk, November 2015 38

Testing

24/11/2015 SNAMES Technical Talk, November 2015 39

Testing

24/11/2015 SNAMES Technical Talk, November 2015 40

Test results

24/11/2015 SNAMES Technical Talk, November 2015 41

Structural design

DESIGN OF DRAG EMBEDMENT ANCHORS

24/11/2015 42 SNAMES Technical Talk, November 2015

Anchor handling

• Modern AHVs are extremely powerfull: – High bollard pull applied

during anchor installation

– Large winches used during anchor recovery

24/11/2015

43

SNAMES Technical Talk, November 2015

Anchor handling

• Mobile moorings: – Anchors deployed and

recovered using chaser system

– Mooring line in contact with anchor during recovery

– Over lifetime multiple installations

24/11/2015

44

SNAMES Technical Talk, November 2015

Anchor handling

• Permanent moorings: – Anchors generally placed

carefully on seabed – Single installation during

lifetime – High installation loads

possible

24/11/2015

45

SNAMES Technical Talk, November 2015

Structural design

24/11/2015 SNAMES Technical Talk, November 2015 46

• The structural design must be sufficient to withstand: – The maximum holding capacity in the seabed (UPC) – Forces due to normal anchor handling, installation / recovery – Accidental situations, for example:

• Anchor stuck behind seabed obstruction • Pulling sidewards on the anchor • Dropping of the anchor

Structural design

• Carefull consideration must be given to the accidental loading conditions.

• It is not possible to predict all situations that will occur.

• It is not possible to design for all.

24/11/2015 SNAMES Technical Talk, November 2015 47

Final steps • Structural analysis of MA7 anchor to be completed resulting in selection of

plate thicknesses • Final relationship between anchor size (weight) and holding capacity to be

defined • Documentation to be submitted for type approval. Before that time on a

case by case basis.

24/11/2015 SNAMES Technical Talk, November 2015 48

The End

Questions?

24/11/2015 SNAMES Technical Talk, November 2015 49

References • All pictures Mooreast Asia Pte Ltd / Mooreast Europe BV unless as stated below. • Page 4, top left, http://maritime-connector.com/wiki/platforms/ • Page 4, top right, http://maritime-connector.com/wiki/platforms/ • Page 4, bottom left, http://www.sci-chain.com/?page_id=234 • Page 4, bottom right, www.maritimeconnector.com • Page 5, top left, https://en.wikipedia.org/wiki/Floating_wind_turbine#/media/File:Agucadoura_WindFloat_Prototype.jpg • Page 5, top right, Øyvind Hagen - Statoil AS • Page 5, bottom left, http://www.cenews.in/pelamis-wave-power/ • Page 5, bottom right, http://www.emec.org.uk/?attachment_id=5720 • Page 6, top left, http://nauticalarch.org/images2/gallery/main/photo_gallery1_31.jpg • Page 6, top right, Mojo Maritime Ltd • Page 6, bottom left, http://www.kolumbustours.com/images/Unterwater%20Museum/replica_of_16th_centurry_stock_anchor.JPG • Page 6, bottom right, http://www.cruisersforum.com/forums/f118/open-source-anchor-project-113732-16.html • Page 12, top left, http://www.sbmoffshore.com/wp-content/uploads/2013/09/SBMO-Glossary-_Original_2045.pdf • Page 12, top right, http://dcl-usa.com/category/product-line/anchors/ • Page 12, bottom left, www.bruceanchor.co.uk • Page 13, left, http://vryhof.com/products/anchor_data_acquisition.html • Page 13, right, http://www.bruceanchor.co.uk/products/ffts-gp/ • Page 14, top left, www.bruceanchor.co.uk • Page 14, top right, www.vryhof.com • Page 14, bottom left, www.bruceanchor.co.uk • Page 14, bottom right, www.vryhof.com • Page 16, http://billspringer.blogspot.nl/2011/03/which-anchor-holds-best-14-anchors-are.html?m=1 • Page 17, http://www.rocna.com/sites/default/files/RocnaBrochure2014.pdf • Page 18, http://www.anchorright.com.au/ • Page 43, http://www.marineinsight.com/wp-content/uploads/2013/03/Anchor-Handling-Tug-Supply-Vessel.jpg?dc5353 • Page 44, https://www.flickr.com/photos/31540804@N08/2947414642 • Page 45, Christian Romberg • Page 47, http://www.gwec.co.uk/ports-and-terminals/139/buoy-moorings

24/11/2015 SNAMES Technical Talk, November 2015 50

Recommended