MGD Advisory Group Meeting
Sydney 5th March 2015
Agenda
Mission – to advise on the way forward.Issues:
1 MGD implications of country experience discussions
2 MGD2 and the Portal
3 Modules
4 Outline of future work
Outcome of country experience discussions
• Main mode of MGD interaction with countries via agencies and programmes – SilvaCarbon, UN-REDD. MGD a source document for this
• Continuing need for an anchor – what’s operational, linked to international agreement and IPCC methods
• Portal and modules give flexibility• Need for advice on sensible applications for
technologies• Useful to have end-to-end flowchart • In–country institutional basis crucial (coordination,
volatility, absorptive capacity…). Increase advice…• Co-benefits linkage (wider forest values…)
Agenda
Mission – to advise on the way forward.Issues:
1 MGD implications of country experience discussions
2 MGD2 and the Portal
3 Modules
4 Outline of future work
MGD2 and the Portal• Existing MGD is version 1 – need for update foreseen, taking account of
experience. • Combination with portal gives access tuned to individual needs linked to
security of the MGD foundation document. MGD portal can help the link between pillars of GFOI
• Version 2 provides opportunity for - Logical synergy with portal- updates on institutional arrangements - strengthen guidance on integration- more complete material on statistical inference (emission factors as well
as area data) and uncertainties- Response to country experiences- Integration of modules- Updates from research track- Updated core data availability
Proposal – joint production of portal and version 2 according to agreed outline
Proposal for outlineElement Concept
1. Institutional Arrangements
1.1 Key functions and components of National Arrangements
2 Design Decisions 2.1 UNFCCC Decisions and Requirements2.2 IPCC GPG2.3 NFMS2.4 Estimation methods and approaches
3 Measurement 3.1 AD3.2 Ground Observations and auxiliary data3.3 Integration and generation of estimates3.4 Uncertainty
4 Reporting and verification
4.1 Scope of reporting4..2 Documentation and data archiving
5 Guiding Principles 5.1 Institutional Arrangements5.2 Design Decisions5.3 NFMS5.4 Reporting and verification
Agenda
Mission – to advise on the way forward.Issues:
1 MGD implications of country experience discussions
2 MGD2 and the Portal
3 Modules
4 Outline of future work
Modules• Intermediate products• Currently:• Relationship with GOFC-GOLD• Global datasets• Reference levels• Relationship with CBD• Inference module
Proposal: Finalize these and retain use of modules as flexible response product
Agenda
Mission – to advise on the way forward.Issues:
1 MGD implications of country experience discussions
2 MGD2 and the Portal
3 Modules
4 Outline of future work
Outline timeline• Identify expertise for new material and work
plan for delivery of this material • Workshop on extending statistical inference to
biomass/emission factors and integrating uncertainties
• Review draft version 2 – end Mar 2016• Prototype portal for review – end Mar 2016• Review period - to end Apr• Integration of review – by end May 2016• Finalization end Jun 2016
MGD2 Structure
Proposal for overall structureElement Concept
1. Institutional Arrangements
1.1 Key functions and components of National Arrangements
2 Design Decisions 2.1 UNFCCC Decisions and Requirements2.2 IPCC GPG2.3 NFMS2.4 Estimation methods and approaches
3 Measurement 3.1 AD3.2 Ground Observations and auxiliary data3.3 Integration and generation of estimates3.4 Uncertainty
4 Reporting and verification
4.1 Scope of reporting4..2 Documentation and data archiving
5 Guiding Principles 5.1 Institutional Arrangements5.2 Design Decisions5.3 NFMS5.4 Reporting and verification
Proposal for overall structureElement Concept
1. Institutional Arrangements
1.1 Key functions and components of National Arrangements
2 Design Decisions 2.1 UNFCCC Decisions and Requirements2.2 IPCC GPG2.3 NFMS2.4 Estimation methods and approaches
3 Measurement 3.1 AD3.2 Ground Observations and auxiliary data3.3 Integration and generation of estimates3.4 Uncertainty
4 Reporting and verification
4.1 Scope of reporting4..2 Documentation and data archiving
5 Guiding Principles 5.1 Institutional Arrangements5.2 Design Decisions5.3 NFMS5.4 Reporting and verification
1. Institutional Arrangements
1.1 Key functions and components of National Arrangements
Existing material
Focus,Augmentation
Expertise
1.1.1 Forest Policy and Governance1.1.2 Technical direction1.1.3 Inventory estimates1.1.4 National Focal Point1.1.5 International Consultation and Analysis
Some material in 1.1. Also FCMC report
Strong institutional foundations. Feedback from country experiences in Sydney
Proposal for overall structureElement Concept
1. Institutional Arrangements
1.1 Key functions and components of National Arrangements
2 Design Decisions 2.1 UNFCCC Decisions and Requirements2.2 IPCC GPG2.3 NFMS2.4 Estimation methods and approaches
3 Measurement 3.1 AD3.2 Ground Observations and auxiliary data3.3 Integration and generation of estimates3.4 Uncertainty
4 Reporting and verification
4.1 Scope of reporting4..2 Documentation and data archiving
5 Guiding Principles 5.1 Institutional Arrangements5.2 Design Decisions5.3 NFMS5.4 Reporting and verification
2. Design Decisions
2.1 UNFCCC Decisions and requirements
Existing material Focus,Augmentation
Expertise
2.1.1 MRV Decisions
2.1.2 Reporting Requirements
Section 1.4.1 , Section 1.5 and other locations
Section 5
Policy basis; add what has happened since Warsaw
2.2 IPCC GPG
2.2.1 UNFCCC principles TACCC2.2.2 Significance and KCA2.2.3 IPCC GHG methodologies
2.2.4 Appropriate approaches, methods, tiers
Section 1.3 / Annex A Section 1.2 / Annex Section 1.1 Section 2.1 / Annex ASection 1.4.6 / Annex A
Methodological basis, revealed responses of countries
2. Design Decisions - continued
2.3 - NFMS Existing material FocusAugmentation
Expertise
2.3.1Scope or REDD+ activities2.3.2 Forest definition2.3.3 Stratification2.3.4 National and sub-national estimation and reporting2.3.5 Use of global datasets
FREL module (part)Section 1.4.4Several placesSection 1.4.3
1.4.5, Box 1, 1.5, Ax CModule
Determination of significant activities; implementing stepwise approach
2.4 Estimation methods and approaches2.4.1 Gain-Loss, stock change methods 2.4.2 Tier 1 to 3 implementation
Section 2.1, Annex C
Annex A
Improve coverage of higher Tiers, degradation and other act ivies
Proposal for overall structureElement Concept
1. Institutional Arrangements
1.1 Key functions and components of National Arrangements
2 Design Decisions 2.1 UNFCCC Decisions and Requirements2.2 IPCC GPG2.3 NFMS2.4 Estimation methods and approaches
3 Measurement 3.1 AD3.2 Ground Observations and auxiliary data3.3 Integration and generation of estimates3.4 Uncertainty
4 Reporting and verification
4.1 Scope of reporting4..2 Documentation and data archiving
5 Guiding Principles 5.1 Institutional Arrangements5.2 Design Decisions5.3 NFMS5.4 Reporting and verification
3. Measurement
3.1 Activity Data Existing material Focus, Augmentation
Expertise
3.1.1 AD requirements3.1.2 RS sources3.1.3 Tools for large data sets3.1.4 Pre-processing3.1.5 Mapping3.1.6 Importance reference data3.1.7 Map products from RS
3.13.2, Annex B---3.33.53.73.4
Introduce MGD Portal, COVE tool and SDMS
3.2 Ground observations
3.2.1 AGB, BGB3.2.2 Litter, deadwoood3.2.3 Soil organic C3.2.4 HWP3.2.5 Non-CO2 GHG3.2.6 Land Use Boundaries3.2.7 Climate variables
3.9.1 Annex G, F, D3.9.2 Annex D3.9.3 Annex D---3.9.4------
Components not currently represented
3. Measurement – cont
3.3 Integration and generation of estimates
Existing material Focus, Augmentation
Expertise
2.4.1 Deforestation2.4.2 Degradation2.4.3 SMF, Enhance, Conserv2.4.4 Enhancement (change use)2.4.5 Conversion natural forests
2.2.12.2.22.2.3, 2.2.42.2.5, 2.2.62.2.7
Improve coverage of higher Tiers, degradation and other activities
3.4 Uncertainty
3.4.1 Area and area change
3.4.2 Emission factors and model parameters (often ground- based data)
3.4.3 Combining uncertainties
3.7, module in preparation
4
4
More examples
Make comparable with AD
Proposal for overall structureElement Concept
1. Institutional Arrangements
1.1 Key functions and components of National Arrangements
2 Design Decisions 2.1 UNFCCC Decisions and Requirements2.2 IPCC GPG2.3 NFMS2.4 Estimation methods and approaches
3 Measurement 3.1 AD3.2 Ground Observations and auxiliary data3.3 Integration and generation of estimates3.4 Uncertainty
4 Reporting and verification
4.1 Scope of reporting4..2 Documentation and data archiving
5 Guiding Principles 5.1 Institutional Arrangements5.2 Design Decisions5.3 NFMS5.4 Reporting and verification
4. Reporting and Verification
4.1 Scope of Reporting Existing material Focus, Augmentation
Expertise
4.1.1 GHG Inventory reporting4.1.2 FR(E)Ls4.1.3 Requirements for results based payments4.1.4 Non-carbon related
---1.4.2 plus module---
Biodiversity module
4.2 Documentation and data archiving4.2.1 Maintaining transparency and consistency
Annex A Make more specific
Proposal for overall structureElement Concept
1. Institutional Arrangements
1.1 Key functions and components of National Arrangements
2 Design Decisions 2.1 UNFCCC Decisions and Requirements2.2 IPCC GPG2.3 NFMS2.4 Estimation methods and approaches
3 Measurement 3.1 AD3.2 Ground Observations and auxiliary data3.3 Integration and generation of estimates3.4 Uncertainty
4 Reporting and verification
4.1 Scope of reporting4..2 Documentation and data archiving
5 Guiding Principles 5.1 Institutional Arrangements5.2 Design Decisions5.3 NFMS5.4 Reporting and verification
5. Guiding Principles
Existing material Focus, Augmentation
Expertise
5.1 Institutional Arrangements5.2 Design Decisions5.3 NFMS
5.4 Reporting and Verification
------3.6, 3.8, Annex E, Annex D---
Distil guiding principles from all sections
Recommended