Crenshaw/LAX Transit Project Construction Update Meeting

March 24, 2015

1

2

Project Overview

• Design-Build Contract - Walsh Shea Corridor Constructors

• 8.5 miles of light rail

• 8 new stations

• Southwestern Yard Maintenance Facility – Separate Contract

• $2.058 billion-Life-of-Project Budget

• Planned opening: 2019

• 24,400 daily project trips (2035)

2

Traffic Closures Map

3

Southern Segment Update

(105 Fwy to West Bl)

Crenshaw/LAX Transit Project

4

5

Crenshaw/LAX Transit Project Underground #1

• Piles that have been installed as a support to the underground tunnel that will run along a portion of Aviation Bl

5

6

Crenshaw/LAX Transit Project Century/Aviation Bridge Progress

• All CIDH columns are complete, 10 columns poured to date

6

7

Crenshaw/LAX Transit Project The Century/Aviation Bridge

A conceptual rendering of the Century/Aviation Station

8

>Tree removal

>Along Metro right-of-way

>Closure of Redondo Bl parking lot

>Construction lay down area

>Closure of Redondo Bl exit at Florence Av

>Construction of La Brea Bridge

Grading work along Metro ROW

8

Construction in Inglewood

9 9

Construction in Inglewood: Redondo Blvd.

New Parking

Road Closure

Parking lot closure

10

Activity Projected Start

Date

Estimated Length of

Activity

Concrete Crushing (La Brea Yard) Redondo Blvd Parking Lot closure (Construction lay down area) Drive H-Piles (Start of Foundation Work on La Brea Bridge)

February, 2015* February, 2015* April, 2015

Complete Duration of project April, 2015

La Brea Bridge Construction Redondo Blvd at Florence Ave. Closure * Work has begun

May, 2015 April, 2015

July, 2016 Duration of project

Projected Construction Schedule: Inglewood

10

11

Activity Projected Start

Date*

Estimated Length of

Activity Clear and Grub along Metro ROW Rough subgrade/initial excavation for trailer Guideway storm drain installation Rail welding ROW at Redondo Bl I-405 Bridge I-405 Bridge MSE Walls

March, 2015* March, 2015* April, 2015 April, 2015 May, 2015 July, 2015

May, 2015 May, 2015 December, 2015 May, 2015 March, 2017 December, 2015

* Work has begun

Projected Construction Schedule: Inglewood

11

12

Activity Projected Start

Date*

Estimated Length of

Activity

Manchester Bridge H-Pile Manchester Bridge Construction Manchester Bridge MSE Walls

May, 2015 May, 2015 June, 2015

May, 2015 November, 2016 December, 2015

Guideway storm drain installation

April, 2015

December, 2015

Projected Construction Schedule: Westchester

12

Activity Projected Start

Date

Estimated Length of

Activity Erect Century Bridge Falsework Remove Century Bridge Falsework 111th St Bridge Foundation Construction Rail welding ROW at Arbor Vitae St Erect 111th St Bridge Falsework Remove 111th St Bridge Falsework

April, 2015 December, 2015 April, 2015 May, 2015 June, 2015 December, 2015

April, 2015 December, 2015 May, 2015 June, 2015 June, 2015 December, 2015

Projected Construction Schedule: Westchester

13

Activity Projected Start

Date

Estimated Length of

Activity

Demo 18” Sanitary sewer March, 2015 April, 2015

CIDH Pile Installation (Foundation) Erect Green Line Bridge Falsework Remove Green Line Bridge Falsework

March, 2015 May, 2015 May, 2016

April, 2015 July, 2015 May, 2016

Projected Construction Schedule: Green Line

14

15 15 15 15 15

15

15 15

Crenshaw/LAX Transit Project

Northern Segment Construction Update

(Crenshaw Bl between Exposition Bl and 67th St/West Bl)

16 16 16 16 16

16

16 16

17 17 17 17 17

17

17 17

Exposition/Crenshaw Station Construction

• Street excavation and decking operation complete

• Utility work requires nightly and weekend closures

• HOBAS Sewer – Crenshaw Bl closure (Expo to Coliseum)

mid-late April 2015

• Crenshaw Bl traffic reconfiguration throughout project

Exposition Bl/Crenshaw Station Construction

18 18 18 18 18

18

18 18 18 18 18 18 18

18

18 18 18 18 18 18 18

18

18 18 18 18 18 18 18

18

18 18 18 18 18 18 18

18

18 18 18 18 18 18 18

18

18 18 18 18 18 18 18

18

18 18 18 18 18 18 18

18

18 18 18 18 18 18 18

18

18 18 18 18 18 18 18

18

18 18 18 18 18 18 18

18

18 18

MLK Station Area Construction

19 19 19 19 19

19

19 19 19 19 19 19 19

19

19 19 19 19 19 19 19

19

19 19 19 19 19 19 19

19

19 19 19 19 19 19 19

19

19 19 19 19 19 19 19

19

19 19 19 19 19 19 19

19

19 19 19 19 19 19 19

19

19 19 19 19 19 19 19

19

19 19 19 19 19 19 19

19

19 19 19 19 19 19 19

19

19 19

• Street excavation and decking on-going • Business and pedestrian access • Crenshaw Bl re-opens on March 28 • Crenshaw Bl traffic reconfiguration throughout project

20 20 20 20 20

20

20 20 20 20 20 20 20

20

20 20 20 20 20 20 20

20

20 20 20 20 20 20 20

20

20 20 20 20 20 20 20

20

20 20 20 20 20 20 20

20

20 20 20 20 20 20 20

20

20 20 20 20 20 20 20

20

20 20 20 20 20 20 20

20

20 20 20 20 20 20 20

20

20 20 20 20 20 20 20

20

20 20 20 20 20 20 20

20 20 20 20

20

20

21 21 21 21 21

21

21 21 21 21 21 21 21

21

21 21 21 21 21 21 21

21

21 21 21 21 21 21 21

21

21 21 21 21 21 21 21

21

21 21 21 21 21 21 21

21

21 21 21 21 21 21 21

21

21 21 21 21 21 21 21

21

21 21 21 21 21 21 21

21

21 21 21 21 21 21 21

21

21 21 21 21 21 21 21

21

21 21 21 21 21 21 21

21 21 21 21

21

21

Leimert Park Station Construction (43rd St to 48th St)

22 22 22 22 22

22

22 22 22 22 22 22 22

22

22 22 22 22 22 22 22

22

22 22 22 22 22 22 22

22

22 22 22 22 22 22 22

22

22 22 22 22 22 22 22

22

22 22 22 22 22 22 22

22

22 22 22 22 22 22 22

22

22 22 22 22 22 22 22

22

22 22 22 22 22 22 22

22

22 22 22 22 22 22 22

22

22 22 22 22 22 22 22

22 22 22 22

22

22

• Crenshaw closure on-going (Vernon Av to 43rd St/Homeland)

• Third party utility relocations with nightly lane closures

• Crenshaw scheduled to re-open on March 28 • March 28 Stage B Traffic Reconfiguration

Leimert Park Station Area Construction From 43rd St to 48th St (cont.)

23 23 23 23 23

23

23 23 23 23 23 23 23

23

23 23 23 23 23 23 23

23

23 23 23 23 23 23 23

23

23 23 23 23 23 23 23

23

23 23 23 23 23 23 23

23

23 23 23 23 23 23 23

23

23 23 23 23 23 23 23

23

23 23 23 23 23 23 23

23

23 23 23 23 23 23 23

23

23 23 23 23 23 23 23

23

23 23 23 23 23 23 23

23 23 23 23

23

23

• Stage B Traffic Reconfiguration – March 28 • Approximately 4 months • East side pile installation and street widening • Two traffic lanes in each direction on Crenshaw Bl • Left turns prohibited from Crenshaw Bl to Vernon Ave • Removal of parking on Crenshaw Bl • Limited and re-routed pedestrian access

• Excavation and decking - Full closure in Spring 2015

Leimert Park Station Area Traffic Reconfiguration Stage B

24 24 24 24 24

24

24 24 24 24 24 24 24

24

24 24 24 24 24 24 24

24

24 24 24 24 24 24 24

24

24 24 24 24 24 24 24

24

24 24 24 24 24 24 24

24

24 24

N

Crenshaw Blvd.

No left turns

Left turns

restored

26

Park Mesa Heights Area Construction (48th St. to 67th St/Brynhurst Av)

• Tree removal and replacement on-going • ‘Cut n Cover’/Tunnel Construction in Spring 2015

• At-Grade construction and street widening (48th St to 59th St) in Summer 2015 • Utility relocation work activities through May

27

Park Mesa Heights (Vernon Av to 67th St) Tree Removal and Replacement

• 107 trees removed to date

• An additional 124 trees slated for removal (sidewalk trees)

• Replacement of trees to occur during later stage of project

• Crenshaw Bl Streetscape Plan by City of LA Planning

28

Park Mesa Heights (59thSt to 67thSt/Brynhurst) Cut And Cover/ Tunnel Construction

• Traffic reconfiguration scheduled for Spring 2015 • Crenshaw Bl - Two lanes in each direction • Crenshaw Bl (59th St to 60th St) – mid-street work zone

• Multiple construction activities:

• Pile installation – 1x1 - one side and one block at a time • Excavation and decking at center of the street • Tunnel construction at center of street • Utility relocations at various locations

• Traffic reconfiguration through duration of construction

29

Park Mesa Heights (59thSt to 67thSt/Brynhurst) Cut And Cover/ Tunnel Construction (cont.)

• Removal of street parking • Temporary parking lots provided

• Left-turn restrictions on Crenshaw Bl

• 63rd St (both directions) • 67 St (southbound) • 59th Pl (permanently to and from 59th Pl)

• Occasional weekend lane closures of Crenshaw Bl • Pedestrian and driveway access maintained • Daytime heavy construction

36

Park Mesa Heights (59thSt to 67thSt/Brynhurst) Cut N Cover/ Tunnel Construction

Activity Anticipated Start Date

Anticipated Duration

Anticipated Impacts

Implementation of Traffic Control Spring 2015 3 1/2 Years Long –Term Lane Reductions

East-side Pile Installation Spring 2015 3-4 Months Some occasional full street closures

West-side Pile Installation Late Summer 2015 3-4 Months Some occasional full street closures

Street Excavation and Decking

Late 2015

8 months Some occasional full street closures

Cut N Cover/Tunnel Construction Mid 2016 2 years Long –Term Lane Reductions

Utility Relocations Ongoing 2015 TBD Lane closures

Final Backfilling and Decking 2018 TBD Some occasional full street closures

Eat, Shop, Play Local Campaign

Support for Community Businesses

37

Crenshaw/LAX Transit Project

Eat, Shop, Play Local Support for Community Businesses

Metro’s Eat, Shop, Play Local campaign brings

focused attention to project-area businesses

impacted by construction of Metro Projects.

Short overview video:

https://www.youtube.com/watch?v=wU4bfka4QYk

38

39

Eat, Shop, Play Bus Shelters, Signs & More

Eat, Shop, Play Local Business Participation is free

Website listing www.metro.net/eatshopplay

40

41

Eat, Shop, Play Crenshaw Promotional Opportunities

Vendor Days at Metro’s Gateway building

42

Eat, Shop, Play Community Fest Leimert Park Village

3.21.15

Eat, Shop, Play Crenshaw to win cash prizes

#1 Metro.net/Crenshaw

#2 Click Eat, Shop, Play

banner

#2 Click Submit Drawing

Entry

Online Form

43

Eat, Shop, Play Local What’s Next…

Quarterly Drawing will be held on April 2nd, 2015!

Cash prizes… $1,000, $500 & $250

44

DEOD-Diversity Economic Opportunity Department

Construction Careers

45

Crenshaw/LAX Transit Project

Crenshaw/LAX Transit Project

Project Labor Agreement (PLA) / Construction Careers Policy (CCP) Update

46

47

48

Crenshaw/LAX Transit Project

49