Economic and Social Commission for Western Asia (ESCWA). Expert Group Meeting on Regional Networking and Partnership for the Information Society Development Beirut, 5-6 September 2007. Regional Plan of Action for Building the Information Society (RPoA) and Partnership in Implementation. - PowerPoint PPT Presentation
Citation preview
Regional Plan of Action for Building the Information Society (RPoA) and Partnership in Implementation
Regional Plan of Action for Building the Information Society (RPoA) and Partnership in ImplementationMansour FarahTeam Leader and Senior Information Technology Officer, ICT Division, ESCWAwww.escwa.org.lb
Mansour FarahTeam Leader and Senior Information Technology Officer, ICT Division, ESCWAwww.escwa.org.lb
Expert Group Meeting onRegional Networking and
Partnership for the Information Society Development
Beirut, 5-6 September 2007
Economic and Social Commission for Western Asia (ESCWA)
Objectives of the RPoAObjectives of the RPoA
To build a sustainable and inclusive information society in the region, in line with WSIS Geneva Plan of ActionTo propose a comprehensive strategic frameworkTo foster partnerships and propose a modality for implementationTo fulfill the Millennium Development Goals
RPoA: Result of Collaborative Efforts
RPoA: Result of Collaborative Efforts
Arab ICT strategy, adopted by the Arab Summit in 2001 Pan-Arab regional conference on WSIS, in Cairo, June 2003, including Cairo declarationTentative plan of action for the information society in the region, produced by ESCWA in December 2003 WSIS-Geneva global Plan of Action (PoA)Series of round tables planned by ESCWA during 2004 to address regional specificityEfforts of the Taskforce on Realization of the Arab StrategyFeedbacks from the ESCWA Second Regional Preparatory Conference for WSIS, and an online forum
Listed in chronological order
Evolving RPoAEvolving RPoA
PartnershipDecentralization Results-based management (RBM) system
Modularity Open-endedness Government priority
Rolling projects Leading responsibility Implementation upon maturity
Periodic monitoring and reportingOnline follow-up
The RPoA can assimilate future needs of Arab countries along with a mechanism to periodically introduce new regional strategic actions, report on progress of work, and adjust the plan accordingly. Considerations include:
Main components of the strategic
framework
Main components of the strategic
framework
Areas
Action lines
Programmes
Projects
The strategic framework aims at streamlining actions at the regional level and at promoting the development of national capacity for achieving the transition towards the information society
The strategic framework aims at streamlining actions at the regional level and at promoting the development of national capacity for achieving the transition towards the information society
WSIS Action LinesWSIS Action LinesC1: The role of public governance authorities and all
stakeholders in the promotion of ICTs for developmentC2: Information and communication infrastructureC3: Access to information and knowledgeC4: Capacity buildingC5: Building confidence and security in the use of ICTsC6: Enabling environmentC7: ICT Applications: e-government, e-business, e-learning, e-health, e-employment, e-environment, e-agriculture, e- scienceC8: Cultural diversity and identity, linguistic diversity and local contentC9: MediaC10: Ethical dimensions of the Information SocietyC11: International and regional cooperation
Areas of interest to the region
Areas of interest to the region
Policies and strategiesICT infrastructureAccess to information and knowledgeCapacity buildingBuilding confidence, trust, and securityEnabling environmentICT ApplicationsCultural, linguistic, and Arabic contentMediaInternational and regional cooperation
Women empowerment in the information society
Nth Programme
Increasing community access with emphasis onthe marginalized and disabled
Developing the ICT sector
WSIS Global plan of action
Empowering Arab NGO’s in the information society
ICT in education and scientific research
Developing telecommunications infrastructure
Developing e-government services
Information society measurements
ICT for economic development
Promoting digital Arabic content (DAC)
Regional plan of actiontowards the Information Society
Partnership programmes
Main areas of action
Arab ICT Strategy Axis 1 Axis 7
Project 1
Project 2
Project n th
Project 1
Project 2
Project n th
ICT
infr
astr
uctu
re
Cap
acit
y bu
ildin
g
Inte
rnat
iona
l and
reg
iona
l coo
pera
tion
Cul
tura
l, lin
guis
tic,
and
loca
l con
tent
ICT
App
licat
ions
Pol
icie
s an
d st
rate
gies
Ena
blin
g en
viro
nmen
t
Bui
ldin
g co
nfid
ence
, tru
st, a
nd s
ecur
ity
Acc
ess
to in
form
atio
n an
d kn
owle
dge
Med
ia
Criteria for adding Programmes
Criteria for adding Programmes
Programme is presented in a clear and concise format (RPoA uses the Resut-Based Management paradigm);Programme has a coordinating agency;Programme has a high impact on a number of areas that are identified in the RPoA strategic framework.
Programmes could be added once they satisfy the following criteria:Programmes could be added once they satisfy the following criteria:
Programme DetailsProgramme Details
Conceptual overview;Mapping to the areas presented in the strategic framework of RPoA;Outline that includes the programme’s main objectives, challenges, implementation strategy, expected accomplishments and indicators of achievements.
Each programme in the RPoA is presented using the following structure:Each programme in the RPoA is presented using the following structure:
List of ProgrammesList of Programmes
1. ICT for economic development;
2. Developing e-government services;
3. Empowering Arab NGOs in the information society;
4. Developing telecommunications infrastructure;
5. Developing the ICT sector;
6. Women empowerment in the information society;
7. Information society measurements;
8. Promoting digital Arabic content;
9. ICT in education and scientific research;
10. Increasing community access with emphasises on the marginalized and disabled.
Projects: Actions translated into results
Projects: Actions translated into results
Originally, there were 38 projects distributed among 10 programmes;Each project has a coordinating/leading agency;Projects are regional in nature, with most having national components;Regional projects recommended by the Taskforce for the Realization of the Arab Strategy are included and flagged as most important for the Arab Governments;Implementation starts upon maturity.
The list is an evolving one and will be adjusted as changes on existing projects are made and as new projects are added.
The list is an evolving one and will be adjusted as changes on existing projects are made and as new projects are added.
Project Development Phases Project Development Phases
Phase 1. Preparing the project concept paper
Phase 2. Identifying
funding agencies and
possible partners
Phases Outputs
Project Concept Paper (PCP)
Preliminary interest for developing a project document
Letter of intent
Phase 3. Preparing
the full project
document
Project document (ProDoc)
Memorandum of Understanding (MoU)
Implementation reports
Progress of work report
Impact analysis report
Phase 4. Implementing the project
Monitoring
Evaluating
Role of different stakeholders
Role of different stakeholders
International /regional
orgs& NGOs
Government
Mature firmsPrivate sector
Banks and donor
organisations
Universities(educationa
l sector)
Modified Four-Sector Model
Modified Four-Sector Model
> International andregional agencies
Endowment income
(I) High impactentrepreneurs and
partnerships
(IV) Universities(II) Mature Firms
Venture funds and investments
Tax and other revenuesEquity and debt
(III) Government
Banks and donororganizations
NGOs
> Strategic investment> Transfer of human capital> Purchase of goods
> R & D funding> Purchase of innovative goods
> Transfer of technology> Transfer of human capital
R & DFunding
R & DFunding
Suggested Modality Suggested Modality
Strategic Partners
Steering level
.......
Steering Committee+
Secretariat
Programme 1 Programme 2 Programme n
Project1.1
Project1.x
Project2.1
Project2.x
Projectn.1
Projectn.x
ProgrammeLevel
Project Level
NationalCoordination
Level
Online Partnership Space Online Partnership Space ICT Partnership Online
Development of Knowledge repository
PartnershipMechanism
maturity level
Flexibility toupdate/addprogrammes
Flexibility toupdate/addprojects
successes
On-line subscription
On-line forum tosolicit comments and
identify partners
Transfer of ownership
Development of partnership networks
Completion of project
Shared failures and
Project monitoring
Project evaluationProgrammes
RPoA Strategic Framework
Main areas of action
Project Project
Project
Project
Implementation phase
Project
Implemented projects:building blocks
for developing theinformation society
1. ICT for economic development
1.1 CyberPort for trade and transport1.2 CyberHaven for regional tourism
development1.3 Connecting Arab ATM networks1.4 ICT Hub for SMEs
2. Developing e-government services
2.1 Enhancing government decision support capabilities in the socio-economic fields
2.2 Regional e-government portal 3. Empowering Arab
NGO's in the information society
3.1 Arab NGO's information network3.2 Arab civil society academy for
capacity building
4. Developing telecommunications infrastructure
4.1 Towards an integrated regional telecommunications network
4.2 Enhanced broadband access through pilot national applications
Programmes
Projects (1/4)
5. Developing the ICT sector
5.1 Legislation model for an ICT enabling environment
5.2 Establishment of ICT incubators5.3 Partnership space for incubating
telecommunications projects
6.1 Women empowerment through ICT6.2 Promoting the rights of women and
children through the use of ICT6.3 Enhancing Arab women’s role in
development and decision making through the use of ICT
6.4 Gender evaluation methodology for ICT initiatives (GEM)
6. Women empowerment in the information society
7. Information society measurements
7.1 Core ICT indicators7.2 ICT indicators database7.3 Capacity building for information
society measurement
Programmes
Projects (2/4)
Programmes
Projects (3/4)8. Promoting digital
Arabic content (DAC)
8.1 Establishing a digital Arabic library*8.2 Connecting Arab documentation
centres*8.3 Developing an Arabic search engine*8.4 Arabized ICT e-glossary8.5 Arabic domain name system (ADNS)8.6 Arab region network for document
cataloguing and processing8.7 Memory of the Arab world 9.1 Regional Hub for capacity building in
open source software for education and research
9.2 IT teacher training framework9.3 Regional scheme for deployment of
technical computing software9.4 Lifelong learning for socio-economic
development.9.5 Networking academies9.6 Learning object repository in Arabic
(LORA)
9. ICT in education and scientific research
* These projects have been
earmarked as most important by Arab Ministers
of Telecommunication
s and Information Technology
Programmes
Projects (4/4)10. Increasing
community access with emphasis on the marginalized and disabled
10.1 Empowerment through community access: total access points*
10.2 PC for Every Home* 10.3 Information technology clubs*10.4 Empowerment of the visually
disabled through ICT10.5 Market information systems for
agriculture and fishing businesses* These projects have been
earmarked as most important by Arab Ministers
of Telecommunicatio
ns and Information Technology
Recommended