View
1
Download
0
Category
Preview:
Citation preview
QUALI
B.Sc. Ge
CURRE
Managin
FIELDS
• Mana
• Deverisk p
• Envircomp
• Condenvir
• Wate
• Wast
• Geol
• Geop
• Geog
• Stake
IFICATIONS
eology 2003
ENT POSITION
ng Director at Earthtim
S OF SPECIAL COM
agement of ESIA/ ESM
elopment of Environmprofiles
ronmental laws petences
ducting environmentronmental sampling
er management
te management
ogical and Hydrogeol
physical surveying
graphic Information Sy
eholder and public ou
me
MPETENCE
MP projects
mental screening and
and legislating
tal field studies and
logical surveys
ystem
utreach
d
g
d
SUMMAR
Wassim HamdDirector of EaWassim has exprocedures. Hof ESIAs for m
Wassim has a bin‐country ESIactivities, wooplants, and por
He has also unaudits, identifidrilling and su
More recently,
deliverables in
he’s contact pe RECENT RE• Liberia – M• Liberia – W
System Enh• Liberia – M• Liberia – M• Liberia – M• Liberia – M• Liberia – M• Liberia – M• Liberia – M• Liberia – En
Y OF COMPETE
dan is an environmenarthtime Inc. in Monrxtensive experience wHe has worked in the eultiple industries.
background in GeologIA activities includingdchip biomass produrt rehabilitation.
ndertaken projects asscation of potential lan
upervision.
Wassim worked on E
ncluding: Regulatory o
erson at Earthtime on m
LEVANT PROJECTManagement of ESIA/EWorld Bank Consultanthancement Project (LEManagement of in‐counManagement of ESMP fManagement of ESIA foManagement of ESIA foManagement of ESIA foManagement of EMP foManagement of several nvironmental water sa
ENCIES
ntal systems specialisrovia since 2006. He ith Liberian ESIA legienvironmental service
gy and Hydrogeologyg oil and gas exploratuction, rubber plantati
sociated with groundndfill sites, geophysica
Environmental and Soc
obligation table, roadm
major ESIA with sever
T EXPERIENCE INSMP for municipal wat on preparing EnvironSEP), and Liberia Accntry activities of ESIA for 4 mineral exploratior 20 MW power planor two 66 kVA transmor 66 kVA transmissioor rehabilitation of a poEIAs in different sectoampling for Greater M
st with extensive expworked directly witislation and has workes field for over 10 yea
y, and is an EPA’s certion offshore, transmiion and rubber proces
water and surface waal surveying, hydrogeo
cial Regulatory Study
map and schedule, and
ral international partn
NCLUDES: ater distribution projenmental & Social Mancelerated Electricity Exfor 4 offshore oil and gion projects nt mission lines between Mon line between Kakatortion of Port of Buchaors, including breweri
Monrovia Master Plan
perience working in Lh regulators to imprked directly with reguars and has managed
tified environmental eission lines, HFO andssing facilities, brewer
ater management as pological investigations
for oil and gas explor
d Environmental Scree
ners.
ect in 3 major Liberian nagement Framework xpansion Project (LACgas exploration
Mt. Coffee and Monroa and Paynesville anan ies, mineral testing lab
Wa
Managing Dir
Liberia, including as rove the national ESIulators to improve the in‐country teams in t
evaluator, and has mad power plants, minerries, landfills, wastew
part of master plans, s, geological mapping
ration and production
ening and Risk Profile
Cities (ESMF) for Liberia Ele
CEEP).
ovia
boratories, and rubber
ssim Hamd
rector – Earthtim
the Managing A procedures. national ESIA the completion
anaged several ral exploration
water treatment
environmental g, and borehole
with main
. Currently,
ectricity
r sector
dan
e Inc.
Recommended