London Bridge Station Grimshaw - Architecture Today · 2020. 8. 19. · Grimshaw Building London...

Preview:

Citation preview

  • Architect

    GrimshawBuilding

    London Bridge Station

    TopSection through deck bridge atplatforms 13/14. The steel girders areencased in concrete to enhance theacoustic performanceAboveCross-section through concourse andstation operations building. ColumnsThe highest column, at bridge deck C,is 7.3m; the lowest, at bridge deck H, is4.7m. The maximum crosshead span is10.5m, and the minimum is 10.1m.The volume of concrete per column isup to 82 cubic metre (207.5 tonnes) andthe steel tonnage for rebar cages is uptto 26.6 tonnes.