Local Transport Performance and Futures Chris Carter Transport Strategy Manager. Contents. Latest transport performance indicators Recent significant transport investment announcements Coordination of transport works Forthcoming events and policy announcements. Performance Update. - PowerPoint PPT Presentation
Citation preview
Local Transport Performance and Futures
Chris Carter
Transport Strategy Manager
Contents
• Latest transport performance indicators• Recent significant transport investment
announcements• Coordination of transport works• Forthcoming events and policy announcements
Performance Update
• Local Transport Plan 2 Delivery Report Five year review 2006 to 2011
• Local Transport Plan Delivery Report First year progress Apr 2011 to Mar 2012
• Available at: www.mynottingham.gov.uk/ltp3
Public transport patronage
47.9344.43 45.00 46.10 46.47 47.30 46.72 47.60 48.76
0.41 7.909.11
9.33 9.49 9.02 8.248.96 8.30
0
10
20
30
40
50
60
2003/4 2004/5 2005/6 2006/7 2007/8 2008/9 2009/10 2010/11 2011/12
Year
Pa
ss
en
ge
r jo
urn
ey
s (
mill
ion
s)
pe
r y
ea
r
Bus Tram
Main route average journey speed (peak time)
Carbon emissions from transport
73000
70000 70000
69000
67000
68000 68000 68000
67000
64000
65000
66000
67000
68000
69000
70000
71000
72000
73000
74000
2004 2005 2006 2007 2008 2009 2010 2011 2012
To
nn
es p
er a
nn
um
Carbon emissions from transport (city only)
All road casualties (Killed or seriously injured)
Other
• 15% increase in cycling trips since 2010• 91% satisfaction with local bus journeys – national
average = 85%(2011 Passenger Focus survey)
• 85% satisfaction with local street - up from 81% in 2010 (2011 Citizens survey)
Ongoing challenges:• Deterioration in local roads in need of maintenance
(Up from 5% to 6%)• Compliance with air quality standards for the City Centre
Recent Transport Investment Announcements
• £15m Local Sustainable Transport Fund • £5m Better Bus Areas bid successful• Up to £9m City Deal linked to Growth Plan• Commitment to upgrading and electrification of
the Midland Mainline
2011-1st 2011-2nd 2012-1st 2012-2nd 2013-1st 2013-2nd 2014-1st 2014-2nd 2015-1st 2015-2nd 2016-1st 2016-2nd
NET Phase 2
A453 Widening
Ring Road
Station Hub (main contract)
Station Area Blockade
Major Transport Works Coordination
Upcoming events and announcements
• Ring Road Major Scheme information events• National Transport Strategy Refresh• Local Major Transport Scheme Funding
Devolution• High Speed Rail• National Airports Policy development