View
252
Download
0
Category
Preview:
Citation preview
BO
RU
SA
N M
AN
NE
SM
AN
N L
INE
PIP
E P
RO
DU
CT
CA
TALO
GU
E
+90 212 393 58 58Borusan Mannesmann Call Center E-Mail: mannesmann@borusan.com www.borusanmannesmann.com
May
201
2
BORUSAN MANNESMANNBORU SAN. ve T‹C. A.fi.
Head Office:Meclisi Mebusan Caddesi 35,Sal›pazar› 34427 ‹stanbul / TURKEYPhone: +90 212 393 59 59Fax: +90 262 323 18 03E-Mail: mannesmann@borusan.com
LINE PIPE PRODUCT CATALOGUE
Borusan Group at a Glance
Borusan Mannesmann in Brief
Borusan Mannesmann Line Pipe Production Facilities
Production Flow
Production Range
Production Standards
Quality System Certificates
Protective OD & ID Coating Systems
Pipe Joint Systems
Integrated Logistics Experiences
References
1
3
5
7
9
11
12
13
15
17
18
Contents
1
Borusan Group at a Glance
Steel
The PipeGroup
The Flat SteelGroup
Borusan Mannesmann
Borusan StainlessSteel Pipe
Borusan Engineering
Borusan ‹stikbal Trading
Borçelik
Kerim Çelik
Distributorship
The Earth MovingEquipments Group
The AutomotiveGroup
Borusan Makina veGüç Sistemleri
Borusan Otomotiv &Borusan Oto
Supsan Engine Valves
Manheim Turkey
Partners
Distributed Brands
Logistics
Borusan Logistics
Borusan International
2
In 4 major business areaswith 5.000 employees...
Energy
Borusan EnBW Energy
Borusan Mannesmann in Brief
Flagship of Borusan Group with 54 years of pipe manufacturing experience.
Operates with 5 plants, 4 in Turkey (2 HSAW, 2 ERW), 1 in Italy (ERW)
Total annual capacity of 1 mn tons.
Workforce of 1.250 people.
20 years of Contract Management competency
Has its own port (Borusan Port) which brings operational flexibilityin terms of logistics inbound and outbound.
Together with Borusan Group's integrated logistic company Borusan Logistics;provides logistic services for every international pipeline project.
Sole 24.5 m single seam API/ISO/EN large diameter line pipe producer in Europe
Corporate Structure:Borusan Group and one of Europe's leading steel and technology companies;Salzgitter Mannesmann GMBH, merged their welded steel pipe investmentsin Turkey and named that partnership; “Borusan Mannesmann Boru Yat›r›mHolding” in 1998. The company has 73% shares of Borusan MannesmannBoru San. ve Tic. A.fi.
3
U.S
CANADA
UNITED STATES
73%
16%
11%
77% 23%
Borusan MannesmannInvestment Company
Free Float
Others
4
“Our mission is to provide products and services thatenhance the quality of life with our expertise in steelpipe industry and to promote the process of economicand social progress of our community...”
Location of Borusan Mannesmann Plants
Halkal› Plant‹zmit PlantGemlik Plant
Vobarno Plant
TURKEY
Workforce of 1.250committed people...
ISRAEL
DENMARK
NETH.
BELGIUM
CYPRUS
CUBA
LEB.
PORTUGAL
SERBIA
SWITZ.
IRELAND
UNITEDKINGDOM
ITALY BULGARI
AZERBAIJAN
GEORGIA
TUNISIA
SLOVAKIA
CZECHREP.
AUSTRIA
GREECE
ALB.
BOS.&HERZ
SLOVENIACROATIA
EST.
LAT.
LITH.
REIGNONISLAND
QUEEN ELIZABETHISLANDS
ICELAND
FINLAND
SWEDEN
POLAND
GAMBIA
SENEGAL
SICILY
FRENCHGUIANA
ROMANIAFRANCE
SPAIN
ALGERIALIBYA
EGYPT
TANZANIA
ANGOLA
SOUTHAFRICA
QATAR
GABON
CAMEROON
SAUDIARABIA
YEMEN
OMAN
IRANIRAQ
UZBEKISTAN
KAZAKHSTAN
SYRIA
JORDAN
GERMANY
NORWAY
UKRAINE
BELARUS
HUNGARY
PAKISTAN
U.A.E
CHAD
NIGERIA
BOTSWANA
CONGO
5
Borusan Mannesmann Line Pipe Production Facilities
Gemlik Two Step Spiral Pipe PlantProcess Helically Two Step SAWOD 20” - 64”Wall Thickness Up to 25.4 mmLenght up to 24.5 mGrade including X80Coating PE, PP, FBE, Dual Layer
FBE (ARO), FCE, SFE
Gemlik ERW Pipe PlantProcess HFI - ERWOD 1/2” - 12 3/4”Wall Thickness Up to 12,5 mmLenght up to 18.3 mGrade including X70Coating PE, PP
Two Step SpiralPipe Plant
ERWPipe Plant
Borusan Port
Cold RollingPlant
Gemlik Plant
‹zmit Plant
6
İzmit Spiral Pipe PlantProcess Helically SAWOD 14” - 100”Wall Thickness Up to 25.4 mmLenght up to 18.3 mGrade including X70Coating PE, PP, FBE, FCE, SFE,
Cement Mortar Lining
7
Beveling ofPipe Ends
Hidrostatic Test
X-Ray Inspection
Offline UltrasonicInspection Final Inspection
and Marking Stockpiling
Inside Welding
Cutting to Length
Ultrasonic Test
Outside Welding
Spiral Forming
Edge Preparing
UncoilingCoil Identityand Analysis
Production Flow
Online Helical Submerged Arc Welded Pipe
Beveling ofPipe Ends
Hidrostatic Test
Final Inspectionand Marking
Cutting to Length
Ultrasonic Test
Welding
Forming
Edge Preparing
Uncoiling
Coil Identityand Analysis
Ultrasonic Test
Quenching
Post-Annealer
Sizing and Straightening
Beat Cutting(inner/outer)
Preforming
Electric Resistance Welded Pipe
Stockpiling
8
Offline Helical Submerged Arc Welded Pipe
CrimpingUncoiling Straightener
Forming Tack WeldingInternal and External TackWelding - Visual Control
Inside Cleaning-1
100% Strip Lamination Control
Pipe Length Cutting & Pipe Identification
Tab Plate Installation
Inside Cleaning - 2 Off - line Ultrasonic - 1Manuel Ultrasonic and
Magnetic Particle InspectionGrinding & Beveling of
Pipe Ends
Hydrostatic TestingOff - line Ultrasonic - 2Digital Filmless Radiography
Sampling andDestructive Testing
Final Inspection of Surfacesand Pipe Geometry
Weighing and Final Marking
Inside & Outside Offline Saw Welding
Stockpiling
4.500
BORUSAN MANNESMANNAPI 5L PSL2 X80
Edge Preparing
Quality Steps
Production Steps
9
Production Range - SAWH Line Pipes
355.6
406.4
457.2
508
559
610
660
711.2
762
812.8
863.6
914
965.2
1016
1067
1118
1168
1219
1321
1372
1422
1524
1626
1676
1727
1829
2032
2083
2235
2540
14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 52 54 56 60 64 66 68 72 80 82 88 100
Wal
l Thi
ckne
ss (m
m &
inch
)O
D
mm
mm
40.15
74.5
0.17
75
0.19
75.5
0.21
76
0.23
67
0.27
68
0.31
59
0.35
415
0.59
121
0.82
710
0.39
416
0.63
022
0.86
611
0.43
317
0.66
323
0.90
612
0.47
218
0.70
924
0.94
513
0.51
219
0.74
825
.41.00
014
0.55
120
0.78
7inch
Mat
eria
l Gra
de: U
p to
X80
For
furt
her
and
mor
e de
taile
d in
form
atio
n pl
ease
con
tact
our
sal
es d
epar
tmen
t. (m
anne
sman
n@bo
rusa
n.co
m)
10
Production Range - ERW Line Pipes
5.2
21.3
26.9
33.7
42.4
48.3
60.3
73 88.9
114.
3
141.
3
168.
3
219.
1
273
323.
9
2.8
3.4
3.68
3.7
3.9
4.5
2.9
3.56
5.1
66.
67
7.1
8.4
8.1
8.6
9.3
9.5
1211
0.10
90.
133
0.14
50.
147
0.15
40.
179
0.20
00.
203
0.23
70.
258
0.27
70.
331
0.28
00.
318
0.33
70.
365
0.37
50.
432
0.47
2m
m
mm
inch
OD
1/2
3/4
1 1 1
/4
1 1
/2
2 3
/8
2 7
/8
3 1
/2
4 1
/2
5 9
/16
6 5
/8
8 5
/8
10 3
/4
12 3
/4
0.11
30.
140
1.28
1.66
2.13
2.73
3.14
3.97
4.85
1.32
1.72
2.20
2.82
3.25
4.10
5.01
6.15
7.97
1.50
1.97
2.54
3.27
3.76
4.77
5.84
7.17
9.30
11.5
6
1.56
2.05
2.65
3.41
3.93
4.98
6.10
7.49
9.72
12.0
9
1.60
2.11
2.72
3.51
4.05
5.14
6.29
7.73
10.0
4
12.4
9
14.9
4
19.5
5
1.61
2.12
2.74
3.53
4.07
5.16
6.32
7.77
10.0
9
12.5
5
15.0
2
19.6
5
1.67
2.21
2.87
3.70
4.27
5.42
6.65
8.17
10.6
2
13.2
1
15.8
1
20.7
0
25.8
8
2.49
3.24
4.21
4.86
6.19
7.60
9.37
12.1
8
15.1
8
18.1
8
23.8
1
29.8
0
35.4
4
3.60
4.69
5.43
6.94
8.54
10.5
4
13.7
3
17.1
3
20.5
3
26.9
1
33.6
9
40.0
9
4.77
5.53
7.07
8.69
10.7
3
13.9
9
17.4
5
20.9
1
27.4
3
34.3
4
40.8
7
9.91
12.2
7
16.0
2
20.0
2
24.0
1
31.5
3
39.5
1
47.0
4
17.5
3
21.9
2
26.3
2
34.5
9
43.3
6
51.6
4
18.5
2
23.1
8
27.8
4
36.6
1
45.9
2
54.7
0
18.7
7
23.5
0
28.2
2
37.1
2
46.5
6
55.4
7
21.2
1
26.6
1
32.0
0
42.1
5
52.9
1
63.0
8
21.9
4
27.5
3
33.1
2
43.6
5
54.8
1
65.3
5
22.4
2
28.1
4
33.8
7
44.6
4
56.0
7
66.8
7
24.0
8
30.2
7
36.4
6
48.1
2
60.4
8
72.1
5
30.8
8
37.2
0
49.1
0
61.7
3
73.6
5
35.3
5
42.6
7
56.4
5
71.0
7
84.8
8
46.2
5
61.2
9
77.2
4
92.3
0
Wal
l Thi
ckne
ss (m
m &
inch
)
12.5
0.49
2
48.0
3
63.6
8
80.3
0
95.9
9
X 52
X 60
X 65
X 70
We
can
mee
t all
X 42
req
uire
men
ts in
our
pro
duct
ion
rang
e.
11
Petroleum and Gas Line PipesAPI 5L/ISO 3183 : Requirements of PSL 1 & PSL 2
Annex G : Resistance to ductile fracture propagationAnnex H : For Sour Service
EN 10208 : Requirements of Part 1 & Part 2GOST 20295 : Requirements of Type 1, 2 and 3.
Water Line PipesWith protective OD and/or ID coating, plain (beveled) or sleeve welded joints.EN 10217-1 : SAWH & ERWEN 10224 : SAWH & ERWAWWA C 200 : SAWH & ERWBS 534 : SAWH & ERW
General Purpose PipesEN 10217-3 : SAWH - Alloy, fine grain Service condition: max 400°C, min -50°CEN 10217-5 : SAWH - Alloy or non-alloy,
Service condition: max 400°C,EN 10217-6 : SAWH - Non-alloy,
Service condition: - 40°CASTM A139 : SAWH
Piling & Construction PipesASTM A 252 : SAWHEN 10219 : SAWH & ERWEN 10210 : SAWH & ERW
Pipe Lengths: any desired lengths between 8 - 24,5 m
These are our general production standards and specifications.We can meet other production standards and specifications upon request.
Production Standards
12
Quality System Certificates
ISO 9001ISO 14001ISO 10002ISO 29001ISO 31000ISO 17025OHSAS 18001
API 5LAPI 5CTAPI QRAPI Q1AD 2000HP0AD 2000 W0ANSI/AWWA C205ÜHPUNE
PED 97/23 ECB-MARKNSF CertifiedFM CertifiedUL/CUL ListedCE CertifiedDNW CertifiedBV MARINE Certified
DSAWHDVGW 7101-2DIN 30670EN 10208-2EN 10217EN 10219EN 10305EN ISO 3834-2SI 530SI 103SI 1458SI 314
13
Protective OD & ID Coating Systems
Maximum Operating Temperature of Coating
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
HDPE
FBE DRY CONDITION
FBE WET CONDITION
PP NORMAL
PP SPECIAL
MDPE
LDPE
Temperature (0C)
Borusan Mannesmann offers wide range of anti-corrosive and protective OD & ID coatings in itsfully integrated coating facilities. The below table illustrates the type of coatings applied externally andinternally according to standards and special customer requirements.
OD (Outer Diameter): External CoatingID (Inner Diameter): Internal Coating
Type of Coating
Dual-Layer FBE
FBE
Epoxy (liquid)
Polyethylene (PE)
Polypropylene (PP)
Cement Mortar
Gas & Oil Line Pipe
General Application AreaOD ID
Water Line Pipe
Other OD&ID coating processes can also be designed for each specific application i.e. PU, Coal tar,Bitumen, Glass reinforced epoxy etc. which all above processes are within Borusan Mannesmann’sbroad experience.
DUAL-LAYER FBE
14
General Application Standards
Dual Layer Abrasion Resistant FBE OD Coating: Dual layer fusion bonded epoxy provides aperfect abrasion and impact resistance, also maintains an excellent protection for gas - oil linepipes.(API 5L7, CSA Z 245-20, NACE RP 0394, AWWA C213)
FBE (Fusion Bonded Epoxy) OD Coating: Fusion bonded powder epoxy coating provides highprotection of gas and oil pipe lines.(API 5L7, CSA Z 245-20, NACE RP 0394, AWWA C213)
Polyethylene OD Coating: Excellent protection of buried line pipes. High mechanical strength andcorrosion resistance are achieved by 3-layer coating method.(DIN 30670, TS 5139, NF A 49-710, UNI 9099)
Polypropylene OD Coating: Excellent protection of buried line pipes. High mechanical strengthand corrosion resistance are achieved by 3-layer coating method.(DIN 30678, NF A 49-711)
Flow Efficiency ID Coating: For gas transmission lines, flow-coat ID epoxy coating is applied inorder to reduce pipe wall roughness thus increasing throughput.(API RP 5L2)
Epoxy OD & ID Coating: Various epoxy coatings applied externally or internally are enablinghygienic inner surface for potable water transportation and outer surface to resist soil or sea watercorrosion. Coating thickness is up to 1000 μm.(AWWA C 210, TS EN 10289)
Cement Mortar ID Coating: Specifically for potable water pipe lines cement mortar ID coatingprovides hygienic and excellent corrosion resistance and protection. On demand regular cementmortar ID coating or synthetic dispersion added special cement mortar ID coating can be applied.(AWWA C 205, DIN 2614, BS 534, TS 8590)
Pipe Joint Systems
f
NW
av
NW
do dod1
d2
a
a SS
l
Spherical endButt WeldJoint Preparation
30˚ (+5˚/-0˚)
1,6 mm ± 0,8mm
Cylindrical end
Rubber Ring
PE
S
b
D
Y
D1
Cement
f
a a
t
ZAP-LOK®
3020
2526
24 2129
2822
31 32
27
*Double Joint Operation
* For high pressure gas & oil pipelines up to 12”* For water pipelines
* For all types of applications* For water pipelines
Other types of joints may be available upon request.
15
Just in timeon-site deliveryJust in timeon-site delivery
16
Integrated Logistics Experiences
The care devoted to proper storage and shipment of products is part of Borusan Mannesmann’scommitment to customer satisfaction.
Borusan Mannesmann plants are located on the eastern coast of Marmara Sea in the vicinity ofmany piers that are expert in pipe loading equipped with mobile cranes, forklifts and other machinerynecessary for international shipment.
Borusan Mannesmann, together with Group’s integrated logistic company Borusan Logistics, isable to deliver with high versatility for every international project from Saharan desert to Rockymountains.
We deliver• By railway• By barge transportation• By IACS class vessels (sous-palan unloading)• By truck and trailers• Even by containers
In many of our projects we have been in charge of custom clearance, sous-palan operations,leasing and management of stockyards, on-site delivery; providing complete integrated logisticssolutions to meet even the most stringent client delivery terms.
17
Project:In SalahGas Southern Fields Development
18
Operational Highlights
Project DetailsSize: 24"-32"Total Length: 133 kmStandard: API 5L 44th Edition PSL2 X70 and Customer SpecificationsOD Coating: 3 layers of High Density PolyethyleneID Coating Flow Coat EpoxyClient: Salzgitter Mannesmann International Division - GermanyContractor: Petrofac Engineering and Construction - SharjahEnd-User: BP - Statoil - Sonatrach (JV)
Scope of Logistics: Delivery of line pipes with minimum 12.7 meters of average pipe lengthand bends to Djen Djen Port in Algeria as unloaded to the trucks in the port.
Logistic Partners: Borusan Logistics - a Borusan Holding companyBorusan Logistics International Algeria
Project:Capacity Expansion Ellund - Egtved Pipeline- Line Pipes and Bends
Operational Highlights
Project DetailsSize: From DN600 to DN1000 line pipes and bendsTotal Length: 95 kmStandard: EN10208-2 and ENDK Specifications - L 485 MBOD Coating: 3 layers of High Density PolyethyleneID Coating Flow Coat EpoxyClient: Energinet.dk - DenmarkEnd-User: Energinet.dk - Denmark
Scope of Logistics: Delivery of line pipes with minimum 16.5 meters of average pipe length andbends to 40 pipe yards along the route of the pipeline as unloaded and stockpiled in Denmark.
Logistic Partners: Borusan Logistics - a Borusan Holding company
19
20
Operational Highlights
Project DetailsSize: DN500Total Length: 48.5 kmStandard: EN10208-2 and C4Gas / Fluxys Specifications - L 415 MBOD Coating: 3 layers of High Density PolyethyleneID Coating BareClient: Fluxys - BelgiumEnd-User: ThyssenKrupp Mannex GmbH - Germany
Scope of Logistics: Delivery of line pipes with minimum 15.8 meters of average pipe length to Fluxys pipe yard via train in Belgium.
Logistic Partners: Borusan Logistics - a Borusan Holding company
Project:Ben Ahin Bras Pipeline Project
Operational Highlights
Project DetailsSize: DN800Total Length: 57 kmStandard: EN10208-2 and EVN Specifications - L 485 MB
OD Coating: 3 layers of High Density PolyethyleneID Coating Flow Coat EpoxyClient: EVN Netz GmbH - AustriaEnd-User: EVN Netz GmbH - Austria
Scope of Logistics: Delivery of line pipes with minimum 17.2 meters of average pipe length to EVN pipe yard via train as unloaded and stockpiled in Austria.
Logistic Partners: Borusan Logistics - a Borusan Holding company
Project:West 4 Westrail DN800 High PressureGas Pipeline
21
22
Operational Highlights
Project DetailsSize: 36"-42"Total Length: 313 kmStandard: API 5L PSL2 X70OD Coating: FBE
Client: Southern Natural Gas Pipeline Group
Scope of Logistics: DDP basis delivery to 5 pipe yards. The logistics scope includes unloading,double jointing, girth weld coating, sand berms preparations and stacking.
- 22 shipments via A class vessels.- On site double-joint operation- Management of 6 different stockyards.
Logistic Partners: Borusan Logistics (Transportation from Izmit/Turkey to USA) Borusan Logistics International (USA operations)
On this prestigious project Borusan Mannesmann produced FBE coated 48" pipes according tothe client’s requirements. The pipes were double jointed to 80 ft (24 m) pipe length. 80 ft pipeswere transported with special trucks to 4 other designated pipe yards.
Project:Elba Express Expansion Gas Pipeline/ USA - 2008
Operational Highlights
Project DetailsSize: 40"Total Length: 205 kmStandard: EN 10208-2 L485 MBOD Coating: 3 Layer PE acc. to DIN 30670ID Coating: Flow Coat Epoxy acc. to API RP5 L2
Client: Salzgitter Mannesmann (GE)End User: MOL-Hungary
Scope of Logistics: DDP transportation to 14 different pipe yards along the pipeline route in Hungary. The logistics scope includes unloading, stockpiling and safe guardingduring entire delivery operation
Logistic Partners: Borusan Logistics (Transportation from Izmit plant to Hungary) Borusan Logistics International (Hungary operations)
The following transportation methods have been used simultaneously because of the tight deliveryschedule1- Transportation by vessel & barges (45 % of the total quantity)2- Transportation by train (55 % of the total quantity)
Complete handover of the project to the Client was realized in 10 months time.
Project:MOL Natural Gas Transmission Project/ HUNGARY-2007
23
24
Operational Highlights
Project DetailsSize: 42"Total Length: 194 kmStandard: API 5L - PSL 2 X65 (HIC)Outside Coating: 3 Layer PE acc. To DIN 30670
Client: BTC DirectorateEnd User: BTC CO.
Scope of Logistics: Delivery to the pipe yards located at 4 different locations (Kars, Erzincan, Ceyhan and Terminal), including unloading and stockpiling of the pipes.
The following transportation methods have been used simultaneously because of the tight deliveryschedule:
- Transportation by trucks (15 % of the total quantity)- Transportation by train & trucks (85 % of the total quantity)
The project has been completed within a period of 12 months.This project was one of the most important pipeline projects of its time. Global energy conglomerates,along with the world’s top engineering groups took part in this major infrastructure investment,where highest technical, operational and HSE standards were applied.
Project:Baku - Tbilisi - CeyhanCrude Oil Pipeline / TURKEY- 2005
Over 10,000 KmLarge Diameter Oil/Gas Line Pipe
Over 15,000 KmErw Line Pipe
25
COUNTRY CLIENT USAGE PROJECT DESCRIPTION QUANTITY YEAR
USA
USA
LITHUANIA
POLAND
ALGERIA
BELGIUM
AUSTRIA
DENMARK
TURKEY
TURKEY
FRANCE
ALGERIA
HUNGARY
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
WATER
GAS
GAS
GAS
GAS
NORTHEAST SUPPLY DIVERSIFICATION GASPROJECT30” X 70 OD FBE COATED
NORTHEAST UPGRADE AND MPP PROJECT30” X 70 OD FBE COATED, ID EPOXY COATED
JURBARKAS TAURAGE GAS PIPELINE16” L360MB OD PE COATED
GAZOCIAG SWINOUJSCIE SZCZECIN GASPIPELINE PROJECT32” L555MB - 28” L 485MB OD PE & ID EPOXYCOATED
IN-SALAH GAS SOUTHERN FIELDDEVELOPMENT PROJECT24”-32” X 70 OD PE COATED, ID EPOXYCOATED
BEN AHIN BRAS GAS PIPELINE20” L415MB OD PE COATED
EVN WESTRAIL PROJECT32” L485MB OD PE COATED, ID EPOXYCOATED
ELLUND EGTVED PROJECT30” L485MB OD PE COATED, ID EPOXYCOATED
WATER PIPELINE PROJECT88” S355JR OD PE COATED, ID CEMENTMORTAR
SAMSUN COMBINED CYCLE POWER PLANT24” X 65 OD PE COATED, ID EPOXY COATED
F72 LE MANS PIPELINE PROJECT36” X 70 OD PE COATED, ID EPOXY COATED
GR4 PIPELINE PROJECT48” X 70 OD PE COATED, ID EPOXY COATED
CROATIAN TRANSIT PIPELINE32” L485MB OD PE COATED, ID EPOXYCOATED
11 KM
76 KM
35 KM
21 KM
134 KM
49 KM
57 KM
95 KM
44 KM
52 KM
2 KM
305 KM
209 KM
2012
2012
2011
2011
2011
2011
2011
2011
2010
2010
2009
2009
2009
TENNESSEE GASPIPELINE
TENNESSEE GASPIPELINE
AB LIETUVOS DUJOS
GAZ-SYSTEM
PETROFACEND USERS:BP-STATOIL-SONATRACH (JV)
FLUXYS
EVN AUSTRIA
ENERGINET.DK
ASK‹
OMV AG
GRTgaz
SONATRACH
MOL
Major Large-Diameter HSAW Reference List for the Last Seven Years
26
COUNTRY CLIENT USAGE PROJECT DESCRIPTION QUANTITY YEAR
ALGERIA
USA
HUNGARY
USA
ALGERIA
HUNGARY
TURKEY
HUNGARY
ALGERIA
IRAN
TURKEY
TURKEY
ALGERIA
IRAN
TURKEY
GAS PIPELINE PROJECTS20” - 28” X 60 - X 70 OD PE COATED,ID EPOXY COATED
300 LINES PIPELINE PROJECT30” X 70 OD FBE COATED, ID EPOXY COATED
FGSZ PIPELINE PROJECT28” L450MB OD PE COATED, ID EPOXYCOATED
ELBA EXPRESS PIPELINE PROJECT36” - 42” X 70 OD FBE COATED
LZ2 HASSI R'MEL - ARZEW PIPELINE24” X 60 OD PE COATED
GAS PIPELINE PROJECT40” L485 OD PE COATED, ID EPOXY COATED
KIZILIRMAK - KES‹KKÖPRÜ PIPELINE64” - 56” S355JR OD PE COATED, ID CEMENTMORTAR
GAS PIPELINE PROJECT32” L485MB OD PE COATED, ID EPOXYCOATED
GZ1 HASSI R'MEL - MEDAREG PIPELINE40” X 60 OD PE COATED, ID EPOXY COATED
GAS PIPELINE PROJECT48” X 65
SHAHDENIZ PHASE 2 PIPELINE PROJECT42” X 65 OD PE COATED
TURKEY GREECE PIPELINE36” X 65 OD PE COATED
NK1 PIPELINE PROJECT30” X 60 OD PE COATED
GAS PIPELINE PROJECT48” X 65
BAKU - TBILISI - CEYHAN PIPELINE34” - 42” X 65 OD PE COATED
717 KM
212 KM
49 KM
313 KM
476 KM
205 KM
185 KM
55 KM
234 KM
103 KM
115 KM
180 KM
665 KM
226 KM
193 KM
2009
2008
2008
2008
2007
2007
2007
2007
2006
2005
2005
2005
2005
2005
20052004
CAMEG
TENNESSEE GASPIPELINE
FGSZ
SOUTHERNNATURAL GAS
SNAMPROGETTI
MOL
ASK‹ WATERAUTHORITY
MOL
SONATRACH
NIGC
BOTAfi
BOTAfi
SONATRACH
NIGC
BOTAfi, BTCDirectorate
GAS
GAS
GAS
GAS
GAS
GAS
WATER
GAS
GAS
GAS
GAS
GAS
CRUDE
OILGAS
CRUDEOIL
27
Recommended