Lifecycle of reconstruction and key events and stages (short, medium & long term)

Preview:

DESCRIPTION

Martin Kaleta CVUT Prague, Czech Xavi García Martí Universidad Politécnica de Valencia Joao Reis Instituto Superior Técnico Nyoman Jaya University of Salford, UK Eric Lou University of Salford, UK Norbaya Ab Rahim University of Salford, UK Silvia Adarmes Gómez - PowerPoint PPT Presentation

Citation preview

3

Lifecycle of reconstruction and key events and stages (short, medium & long term)

TelčMartin KaletaCVUT Prague, Czech

Xavi García MartíUniversidad Politécnica de Valencia

Joao ReisInstituto Superior Técnico

Nyoman JayaUniversity of Salford, UK

Eric LouUniversity of Salford, UK

Norbaya Ab RahimUniversity of Salford, UK

Silvia Adarmes GómezUniversidad Politécnica de Valencia

3

Sustainable planning, customised for Telc

3

Short Term Recovery

3Temporary Health and

Humanity ServicesConstruct temporary hospital Manage local and foreign humanitarian

volunteersIdentify local residence in assisting

humanitarian aidProvide social and physiological help to

the victims

SSHORT TERM ACTIONS

3Housing & Facilities

• More than 11,000 people ‘unhoused’• Provide temporary housing and shelter for

victims and volunteers• Provide basic facilities and utilities for the

victims and volunteers

• Get expert to assess the structure stability• Replace and repair the fixtures and fittings for

temporary electricity supply

NEW ZONES

Affected People

Volunteers

Kitchen

Administration And Information Centre

Health Services

LEGENDHumanitarian Supplies

SSHORT TERM ACTIONS

3Temporary Infrastructure

Reinstate damaged bridgeConstruct temporary bridgeAllocate temporary helipadRepair electrical sub-stationsProvide generatorIdentify area for cemetery (special memory)

SSHORT TERM ACTIONS

3Existing roads and bridges

SSHORT TERM ACTIONS

3Temporary roads and bridges

SSHORT TERM ACTIONS

3Communication & Services

One-stop centre for information

SSHORT TERM ACTIONS

Provide critical information through the official disaster website

Establish satellite mobile services for telecommunications and internet services

Establish collaborative environments with standard interoperability for information interchange (IFC, BIM, GIS)

3Command Centre

• One stop centre for coordination and information interchange

Affected People

Volunteers

Kitchen

Administration And Information Centre

Health Services

LEGENDHumanitarian Supplies

SSHORT TERM ACTIONS

3Humanitarian Aid

Organisation of food aid

SSHORT TERM ACTIONS

Investigate supply of food from nearby factories (meat)/ store

Ensure the provision of clean water to avoid negative effect towards the health

3Transportation and Accessibility

Provide alternative and temporary transport

SSHORT TERM ACTIONS

Provide temporary walking path/roads

Provide temporary signage

3Security

Identify the victims and their possession

SSHORT TERM ACTIONS

Monitor the people with possession list

Tighten the security to avoid further looting

3Security

• Identify the victims and their possession

• Monitor the people with possession list

• Tighten the security to avoid further looting

Affected People

Volunteers

Kitchen

Administration And Information Centre

Health Services

LEGENDHumanitarian Supplies

Security Posts

SSHORT TERM ACTIONS

3Flooding

Develop temporary dam for reservoir

SSHORT TERM ACTIONS

Provide water pump

Install temporary flood wall

Divert water (canalisation)

3Security

• Identify the victims and their possession

• Monitor the people with possession list

• Tighten the security to avoid further looting

Affected People

Volunteers

Kitchen

Administration And Information Centre

Health Services

LEGENDHumanitarian Supplies

Security Posts

SSHORT TERM ACTIONS

3

Mid Term

Recovery

3MMIDDLE TERMIDDLE TERM

WATER

ENERGY

ICT

TRANSPORTS

HOUSING

PUBLIC EQUIPMENTS

INDUSTRY

MANAGEMENT

3WWATERATER

PROBLEMS... SOLUTIONS...

• Damage in the infrastructures - supply pipelines - main pipelines - houses pipelines

• Water contamination (caused by earthquake)

• Waste water production

• Supply increase for reconstrution

•Repair and rebuild pipelines

• Build a new treatment plant

• Build a waste water treatment plant

• New dams

• Increase the current supply

• Using treated wastewater (ex: cleaning, concrete making)

3WWATERATER

New hydroelectric & mini dams

3EENERGYNERGY

PROBLEMS... SOLUTIONS...Electricity

• Damage in the network• Supply increase for the reconstrution

• Price

Gas

• Damage in the infrastructures• Contamination

Fuel

• Damaged petrol station

Electricity

• Repair and rebuild• Assure more electricity from the general network• Alternative energies

Gas

• Repair and rebuild• Alternative energies

Fuel

• New petrol station

3EENERGYNERGY

3IICTCT

PROBLEMS... SOLUTIONS...

• Damaged infrastructures (telephone lines, mobile comunication)

• Inefficient of convencional conections

• Repair

• Wireless Internet (WiMax)

3TTRANSPORTSRANSPORTS

PROBLEMS... SOLUTIONS...

• Damage in the infrastructures - roads; railways; bridges

• Need transports for people - inhabitants - project staff - tourists

• Restablishment of the infrastructures - Repair - Reconstrution - Improvement

• Establishment of public transport system

3TTRANSPORTSRANSPORTS

3HHOUSINGOUSING

PROBLEMS... SOLUTIONS...

• Damage of the Historical Center

• Damage of the existing houses

• Slow process of reconstrution

• Reconstrution structure of

buildings + Restoration of facets

• Reconstrution or building new houses (depending on available budget)

• Maintainence of temporary acomodation

3HHOUSINGOUSING

3PPUBLIC EQUIPMENTSUBLIC EQUIPMENTS

PROBLEMS... SOLUTIONS...

• Damaged buildings / public spaces

- Schools - Hospital - Local Administration - Parks - Cemeterys

• Repair or Rebuilding

3PPUBLIC EQUIPMENTSUBLIC EQUIPMENTS

3IINDUSTRYNDUSTRY

PROBLEMS... SOLUTIONS...

• Necessity of products for the reconstrution process (ex: material supply)

• Needs for Telc inhabitants and people involved in the project

• Damaged preexisting industries and new necessities

• Build temporary local factories involved with the project (creating local jobs and attracting money)

• Assure restaurants, bars, pubs or shops

• Restablishment of industrial areas

3MMANAGEMENTANAGEMENT

PROCUREMENT

FUNDING

LEGAL ISSUES

HUMAN RESOURCES

MONITORING

3

Long Term

Recovery

3

Take into consideration the recovery, reconstruction and regeneration of Telc.

Unfortunately, in disasters, there are opportunities to change the town.

LLONG TERM ACTIONS

3LLONG TERM ACTIONS

Social

SLEEPT concept

Legal

Economical

Political

Technical

Evironmental

3LLONG TERM ACTIONS

Education

Energy

Infrastructures

Industries

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

26 Public Universities available in Czech

38 Private Universities available in Czech

Only ONE University in Vysočina area (West Movarian University of Trebac)

Only 30+ registered students

Higher Education

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

European strategies & funds•EU Seventh Framework Programme (FP7 & FP8)•Lisbon Strategy 2000 - Education and Training Contribution•Government Commissioner for European Research - Professor Ivan Wilhelm•European Research Council•European Social Fund (ESF)

National strategies & funds•National Programme for the Development of Education in Czech Republic•The Ministry of Education, Youth and Sports (MEYS) MŠMT - provisions of Section 33 of Act No. 130/2002•National Action Plan for Employment - Resolution No. 696

Regional strategies & funds •Vysocina Regional Council for Education•Vysocina Fund

Higher Education

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

Dec JulyJuly

inco

me

Tou

rism

Stu

dent

s

Sustainable economy

Higher Education

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

• Increase skilled workers in the region• Provide consistent number of skilled labor within the region• Balance and improve age demography

• Environmental Information & Protection• Land Use Planning• Integrated Prevention Pollution Control• Air, water & land protection• Nature, landscape and forest protection• Chemicals & Genetically modified organisms• Health protection against noise and vibrations• Nuclear Safety

• European Union & European Commission Treaties• Czech Environmental Legislation Constitutional Act No. 1/1993

Higher Education

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

Pre-contract submission

Pre-contract evaluation

Choose 2 for negotiated PPP

Infrastructure Private-Public Partnership (PPP) process

Higher Education

3LLONG TERM ACTIONS

Higher Education Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

Infrastructure Transfer of risk through Private-Public Partnership (PPP) process

Sample requirements:To provide classrooms and learning space15 years contractTo be reviewed after 8 years

To use modular constructionTo use at least 20% local materialsTo use at least 10% recycled materialsTo use at least 30% off-site manufactured materialsTo use at least 20% local workforce

3LLONG TERM ACTIONS

Energy Politi

cal

Econ

omic

al

Sustainable Energy

Renewable Energy

Green Energy

• Lowering cost of energy

• Reduce dependency for energy consumption

Solar

Biomass

Heating

Water

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

European strategies & funds•EU Seventh Framework Programme (FP7) - € 2.35 billion •European Research Council•European Social Fund (ESF)

National strategies & funds•National Programme for the Development of Education in Czech Republic•The Ministry of Education, Youth and Sports (MEYS) MŠMT - provisions of Section 33 of Act No. 130/2002•National Action Plan for Employment - Resolution No. 696

Regional strategies & funds •Vysocina Regional Council•Vysocina Fund

Energy

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

• Lower dependency on external energy resources• Lower cost for home energy• Environmentally friendly solutions

• Environmental Information & Protection• Land Use Planning• Integrated Prevention Pollution Control• Air, water & land protection• Nature, landscape and forest protection• Chemicals & Genetically modified organisms• Health protection against noise and vibrations• Nuclear Safety

• European Union & European Commission Treaties• Czech Environmental Legislation Constitutional Act No. 1/1993

Energy

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

Reform the institutional framework for the energy sector and made it

more consistent with that of other EU countries

The New law Act No. 180/2005 Coll. on Support of Electricity

Production from renewable energies

Renewable Act should ensure an 8% share of renewable energy in

the Czech Republic’s gross domestic electricity consumption by

2010

Currently 20% is generated by nuclear, future projection is 40%

Energy Regulatory OfficeState Energy Inspection BoardMinistry of Industry and Trade: www.env.cz Ministry of the Environment: www.mpo.cz Energy Regulatory Office (ERO): www.eru.cz

State Environment Fund (CR SEF): www.sfzp.cz

Energy

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

Hydroelectric (Water)• Transforming canals for mini-hydroelectric for homes • Transforming lakes into miniature dams for industries

Wind • Installing wind turbines at home roofs for homes• Installing wind propellers at wind fields

Bio-mass• Installing bio-mass facilities for heating (Water and solid waste)

Solar• Installing solar panels for individual homes from existing temporary fascilities

Energy

3LLONG TERM ACTIONS

Infrastructure

UNESCO Historical City

Market Telc as the hub of tourism in Vysocina

Develop infrastructure for higher education and technology park

New Tourist infrastructuresPedal Board Port & other Lake activities

Handicraft fair

Tulip tree park

Agri-tourism & Eco-tourism

Other actions

Multi-lingual (HHRR)

Improve Hotel facilities

The possibility to rent a Castle

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

European strategies & funds•EU Seventh Framework Programme (FP7) - € 2.35 billion •European Research Council•European Social Fund (ESF)

National strategies & funds•National Programme for the Development of Education in Czech Republic•The Ministry of Education, Youth and Sports (MEYS) MŠMT - provisions of Section 33 of Act No. 130/2002•National Action Plan for Employment - Resolution No. 696

Regional strategies & funds •Vysocina Regional Council•Vysocina Fund

Infrastructure

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

Infrastructure

Telĉ citizens and tourism

Smart homes – renewable energies and ICT

Suppliers (tourism large companies)

Museums and monuments for disaster

Lifecycle – temporary housing to hostels

Comply with environmental issues

Financial support – European, national and regional

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

Regenerate local economy for the local community

Encourage expansion of R&D

Promotion of industries

Comply with environmental issues

Infrastructure

3LLONG TERM ACTIONS

New Industries

Meat industry

Food Technologies

Politi

cal

Econ

omic

al

Soci

al

Lega

l

Tech

nica

l

Envi

ronm

enta

l

National, Regional and Local government

Stakeholder

Users (Telĉ citizens)

Food industries and agricultural Companies

Private financial support

Consulters

Main Construction Companies and Subcontractor

Law

Act no. 137/2006 Law about public commisions

Act no. 183/2006 Building law

Act no. 513/1991 Trade law

Act no. 185/2001 Law about waste

Act no. 406/2000 Law about economy with energy

3LLONG TERM ACTIONS

ICT Politi

cal

Econ

omic

al

Enabler for Telc – common platform for all industries – standard platform for communication

Promote Vysocina as Region for Information Technologies

Assess the readiness of Telc and Vysocina in adapting ICT into everyday lives

3LLONG TERM ACTIONS

ICT

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

European strategies & funds• EU Seventh Framework Programme (FP7) - €9.1 billion • European Research Council• European Construction Technology Platform (ECTP)• Europa i2010

National strategies & funds•National information and communication policy (e-Czech 2006) - nr.453+P/2004

Regional strategies & funds •Vysocina Regional Council•Vysocina ICT Fund

3ICT in Vysočina

LLONG TERM ACTIONS

3ICT in Telč

LLONG TERM ACTIONS

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

ICT to make the Region more attractive for young people

Supporting the vision of an open, accessible and professional

Regional Authority

Initiating co-operation in European projects, the transfer of experience,

support for partnership, and implementation of the best practises

Sustainable technologies

ICT

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

• European Union & European Commission Treaties• ICT standardisation and interoperatability• Electronic Signature Law• Cyber Law

• Managing interoperatability of software and databases• Enhancing security and hacking prevention• Encourage the use of collaborative environments• Encourage the use of free software

• ICT courses • ICT in higher education

ICT

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

ICT

Collaborative Environment

Design & Planning

IFCBIMGIS

Archiving

eGovernmentServices

Communication & E-mailsWorking

Documents

3LLONG TERM ACTIONS

Transportation Econ

omic

al

New and improved transportation links

• Land

• Air

• Rail

• Local transportation

3LLONG TERM ACTIONS

Transportation Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

European strategies & funds• EU Seventh Framework Programme (FP7) - €4.1 billion • European Research Council• Europa transport• EU Road Safety Action Programme (2003-2010)

National strategies & funds• Ministry of Transport• Rail Authority• Transport R&D organisations (COST, OECD, CEMT)

Regional strategies & funds • Vysocina Regional Council

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

• Better transportation = economic growth• New connection with Prague (middle Czech)• Improved connectivity with Prague and Vienna• Alternative airport at Jihlava

• Environmental Information & Protection• Land Use Planning• Integrated Prevention Pollution Control• Air, water & land protection• Health protection against noise and vibrations

• European Union & European Commission Treaties• Czech Environmental Legislation Constitutional Act No. 1/1993

Transportation

3LLONG TERM ACTIONS

Politi

cal

Econ

omic

al

Soci

al

Envi

ronm

enta

l

Lega

l

Tech

nica

l

Safety Directive (2004/49/EC) Rail systems no. 266/1994 Coll (as amended)

Regulation No. 376/2006 Coll (safety certification)

European Rail System (2001/12) comply with European Transport Lawavoid land acquisition

Transportation

3Transportation - Road

LLONG TERM ACTIONS

Telč

3Transportation - Train

LLONG TERM ACTIONS

Vienna Bratislava

Telc

3

Key points

3KKEY POINTS

• New areas are dedicated for victims• Temporary housing, facilities and infrastructures are prepared for victims• Social and physiological support for victims• ICT will be used to enable management, planning and media• Temporary communication through satellite transmission

• Old town – facets of buildings to be reconstructed at best possible• New and improved facilities:

• Water Housing• Energy Public buildings• ICT Industry• Transportation

• Future focus on:• Education – higher education and research and development• Energy – renewable and green energies• Infrastructures – tourism, education, R&D and smart homes• Industries – local economy and people• ICT – technological, people and process push• Transportation – improved links internally (Prague, Brno) and Vienna

3LLONG TERM ACTIONS

• Feasible long-term plans to Telc• Extravagant ideas, but not feasible

Super Casino(eg. Las Vegas)

International Airport(eg. Frankfurt)

Super Skyscraper(eg. Dubai)

Long term sustainable plan, customised for Telc

3Security

• Identify the victims and their possession

• Monitor the people with possession list

• Tighten the security to avoid further looting

Affected People

Volunteers

Kitchen

Administration And Information Centre

Health Services

LEGENDHumanitarian Supplies

Security Posts

MMAPPING

Hostels

Mini dam &hydroelectric

3THANK YOU

MUCHAS GRACIAS

MUITO OBRIGADO

(SHOKRAN) شكرا.ُ

DËKUJI

Recommended