0 | P a g e
Bahagian Pengurusan Sumber Air dan Hidrologi
Unit Ramalan dan Operasi
Seksyen Ramalan Banjir dan Kemarau
Bahagian Pengurusan Sumber Air dan
Hidrologi
Laporan Pemantauan Kemarau Semenanjung Malaysia (Berdasarkan Analisa Hidrologi)
1 | P a g e
ISI KANDUNGAN
1. RINGKASAN ............................................................................................................................................... 2
1.1 RUMUSAN DATA..................................................................................................................................... 4
2. ANALISIS HUJAN ...................................................................................................................................... 6
2.1 Taburan Hujan Semasa ................................................................................................................... 6
2.2 Taburan Hujan Kumulatif 3 Bulan ................................................................................................ 6
2.3 Peratusan Perbandingan Purata Hujan Januari 2016 dengan LTM..................................... 7
2.4 Peratusan Perbandingan Hujan Kumulatif 3 Bulan dengan LTM ........................................ 9
2.5 Analisis Berdasarkan Jumlah Hujan 3 Bulan (Moving Three Months Analysis) ........... 10
3. ANALISIS LUAHAN SUNGAI ................................................................................................................ 23
3.1 Bacaan Purata Luahan Sungai yang Dipantau bagi Bulan Januari 2016. ....................... 23
3.2 Sungai yang berada dibawah Drought Flow 5 Year : 2 Sungai .......................................... 27
4. ANALISIS STORAN EMPANGAN ......................................................................................................... 29
4.1 Aras Air bagi Empangan-empangan yang Dipantau pada Januari 2016 ......................... 29
4.2 Empangan di Bawah Baki Storan 50% : 2 Empangan .......................................................... 31
5. PENGESAHAN.............................................................................................................................................. 33
2 | P a g e
1. RINGKASAN
Sejumlah 41 stesen kemarau telah dipantau dalam analisis hujan bagi menyediakan
Laporan Kemarau. Senarai 41 stesen kemarau di Semenanjung Malaysia yang terlibat
adalah seperti Jadual 1.
Bil. Stn Indeks
No. Stesen
Nama Stesen Daerah Negeri
1 R1 6501005 Abi Kg. Bahru Kangar Perlis
2 K1 6206035 Kuala Nerang Padang Terap Kedah
3 K3 6103047 Rumah Pam Sungai Raja Kota Setar Kedah
4 K4 6207032 Ampang Pedu Padang Terap Kedah
5 K5 6108062 Ampang Muda Padang Terap Kedah
6 P1 5505033 Rumah Pam Pinang Tunggal Seb. Perai Utara Pulau Pinang
7 P2 5304045 Pusat Kesihatan Bkt. Berapit Seb. Perai Tengah Pulau Pinang
8 P3 5302003 Kolam Takongan Air Itam Daerah Timur Laut Pulau Pinang
9 A4 4109095 Kg. Pulau Besar Perak Tengah Perak
10 A6 4011139 Rumah JPS., Sg. Mengkuang Hilir Perak Perak
11 A8 4011144 Rumah Kerajaan JPS., Chui Chak Hilir Perak Perak
12 A12 4511111 Politeknik Ungku Omar di Ipoh Kinta Perak
13 A14 5006021 Kolam Air Bkt. Merah Kerian Perak
14 A15 5003028 Stn. Petak Ujian Tg. Piandang Kerian Perak
15 A16 5210069 Stn. Pemeriksaan Hutan Lawin Hulu Perak Perak
16 B3 3411017 Stor JPS Tg.Karang Kuala Selangor Selangor
17 B4 2917001 RTM Kajang Hulu Langat Selangor
18 B5 2818110 SMK Tasik Kesuma Hulu Langat Selangor
19 B6 3516022 Loji Air Kuala Kubu Bahru Hulu Selangor Selangor
20 B7 3117070 Pusat Penyelidikan di JPS Ampang WP Selangor
21 B8 3010001 Tmn Ehsan Kg. Melayu Subang Sg.Buloh
Petaling Selangor
22 N1 2719001 Setor JPS Sikamat Seremban Seremban N. Sembilan
23 N3 3023098 Sg. Lui Halt Kuala Pilah N. Sembilan
24 M1 2321006 Ldg. Lendu Alor Gajah Melaka
25 J1 2526001 Ldg. Sungai Gemas Segamat Johor
26 J2 2033002 Stn. Telemetri Bandar Kluang Kluang Johor
27 J5 1437116 Stor JPS Johor Bahru Johor Bahru Johor
28 J7 1829001 Sek. Men. Munshi Sulaiman Batu Pahat Johor
29 J8 2528002 Stn. Telemetri di Bandar Segamat Segamat Johor
30 J9 2536168 Empangan Labong, Endau Mersing Johor
31 J10 2527004 Ldg. Paya Lang, Segamat Segamat Johor
32 C3 3424081 JPS Temerloh Termeloh Pahang
33 C4 3533102 Rumah Pam Pahang Tua di Pekan Pekan Pahang
34 C8 4414036 Ldg. Boh (Kawasan Kilang) Cameron Higlands Pahang
35 C9 3930012 Sg. Lembing P.C.C.L Mill Kuantan Pahang
36 D1 4726001 Gunung Gagau Gua Musang Kelantan
37 D2 4819027 Gua Musang Gua Musang Kelantan
38 D6 5921009 Ibu Bekalan To' Uban Pasir Mas Kelantan
39 T1 4234109 JPS Kemaman Kemaman Terengganu
40 T2 4734079 Sek. Men. Sultan Omar di Dungun Dungun Terengganu
41 T5 5331048 Setor JPS Kuala Terengganu Kuala Terengganu Terengganu Jadual 1: Senarai 41 Stesen Kemarau di Semenanjung Malaysia
3 | P a g e
Rajah 1 merupakan lokasi 41 stesen kemarau di Semenanjung Malaysia yang digunakan
bagi penyediaan laporan.
Rajah 1 : Lokasi 41 Stesen Kemarau di Semenanjung Malaysia
4 | P a g e
1.1 RUMUSAN DATA
Purata keseluruhan jumlah hujan bulan Januari 2016 adalah 140 mm sebagaimana
Jadual 2.
INDEKS
STESEN
JUMLAH HUJAN (MM) Minggu 1 Minggu 2 Minggu 3 Minggu 4
(mm) 1hb-7hb 8hb-14hb 15hb-21hb 22hb- 31hb
0.0 0.0 20.0 2.0 22.0 K1 0.0 1.0 6.5 0.5 8.0 K3 5.0 0.0 33.0 1.5 39.5 K4 0.0 1.9 175.1 18.0 195.0 K5 0.0 0.0 52.0 23.0 75.0 P1 39.5 8.5 30.0 130.0 208.0 P2 22.0 32.5 98.0 64.5 217.0 P3 0.0 1.0 89.0 0.0 90.0 A4 1.5 11.5 24.0 48.0 85.0 A6 48.5 75.5 35.5 155.5 315.0 A8 22.0 61.0 56.0 128.0 267.0
A12 2.5 97.5 56.5 21.0 177.5 A14 2.5 5.0 35.0 60.0 102.5 A15 14.5 10.0 7.0 1.0 32.5 A16 0.5 0.0 77.5 49.0 127.0 B3 10.5 0.0 20.0 76.5 107.0 B4 2.0 3.5 25.0 82.0 112.5 B5 0.5 7.0 48.0 77.5 133.0 B6 0.0 22.5 18.5 31.0 72.0 B7 60.0 9.0 91.5 6.5 167.0 B8 52.5 12.5 67.0 154.5 286.5 N1 22.0 45.0 3.0 62.0 132.0 N3 0.0 0.0 0.0 32.0 32.0 M1 21.0 1.0 14.0 97.0 133.0 J1 35.0 0.0 0.0 27.0 62.0 J2 40.0 32.0 44.5 31.5 148.0 J5 23.5 13.0 105.0 58.5 200.0 J7 71.0 187.5 14.0 86.5 359.0 J8 149.5 2.5 5.0 28.5 185.5 J9 44.5 7.0 44.0 143.5 239.0 J10 8.0 0.0 5.0 44.5 57.5 C3 3.0 4.5 20.0 37.0 64.5 C4 13.5 0.0 19.0 62.5 95.0 C8 11.0 0.0 22.5 17.5 51.0 C9 34.5 2.0 21.0 65.5 123.0 D1 26.0 17.0 113.0 81.0 237.0 D2 24.0 0.0 80.0 31.0 135.0 D6 2.0 0.0 100.0 247.5 349.5 T1 23.0 3.0 13.0 36.0 75.0 T2 4.0 13.0 34.0 39.0 90.0 T5 5.0 5.0 98.0 14.0 122.0
JUMLAH PURATA HUJAN (MM) 140
Jadual 2 : Purata Hujan Bulan Januari 2016
5 | P a g e
Jumlah purata hujan bulan Januari 2016 didapati telah berkurang sebanyak 58mm
bersamaan - 29% berbanding dengan jumlah purata hujan bulan Disember 2015
seperti Jadual 3.
PURATA HUJAN (mm)
DISEMBER JANUARI PERBEZAAN % PERBEZAAN
198 140 -58 -29%
Jadual 3 : Peratus Perbezaan Purata hujan bulanan semasa dengan Purata hujan Bulanan Sebelum
Manakala bagi data kumulatif 3 bulan (bulan semasa dan 2 bulan ke belakang) hujan
sebenar dengan kumulatif 3 bulan (bulan semasa dan 2 bulan ke belakang) hujan
jangka panjang (Long Term Mean rainfall, LTM), didapati berlaku pengurangan hujan
sebanyak -74 mm bersamaan -10.2 % seperti Jadual 4.
PURATA HUJAN (mm)
KUMULATIF 3
BULAN LTM
KUMULATIF 3
BULAN SEBENAR PERBEZAAN % PERBEZAAN
730 656 -74 -10.2%
Jadual 4 : Peratus Perbezaan Kumulatif 3 bulan (bulan semasa dan 2 bulan ke belakang) hujan sebenar dengan Kumulatif 3 bulan (bulan semasa dan 2 bulan ke belakang) hujan jangka panjang
(LTM)
6 | P a g e
2. ANALISIS HUJAN
2.1 Taburan Hujan Semasa
Peta isohyet pada Rajah 2 menggambarkan taburan keadaan hujan semasa bagi bulan
Januari 2016. Purata taburan hujan bagi Semenanjung Malaysia ialah 140mm.
Pengurangan hujan sebanyak -58mm bersamaan -29% berbanding dengan jumlah
purata hujan bulan Disember 2015 iaitu 198mm (rujuk Jadual 3).
2.2 Taburan Hujan Kumulatif 3 Bulan
Peta isohyet pada Rajah 3 menggambarkan taburan hujan kumulatif untuk 3 bulan
sebenar (Januari 2016, November dan Disember 2015). Purata taburan hujan
kumulatif untuk 3 bulan sebenar bagi Semenanjung Malaysia ialah 656mm.
Pengurangan hujan sebanyak -74mm bersamaan -10.2% berbanding dengan taburan
hujan kumulatif 3 bulan LTM iaitu 730mm (rujuk Jadual 4).
Rajah 2 : Hujan Bulan Januari 2016 Rajah 3: Hujan Kumulatif 3 Bulan
7 | P a g e
2.3 Peratusan Perbandingan Purata Hujan Januari 2016 dengan LTM
Analisis berdasarkan jumlah hujan satu bulan, iaitu purata hujan bulan Januari 2016
(140mm) berbanding dengan purata hujan jangka panjang (146mm) menunjukkan
terdapat pengurangan sebanyak -6mm, iaitu -4.44 %.
NO. INDEKS
STESEN
HUJAN
SEMASA
HUJAN LTM PERBEZAAN (MM) % PERBEZAAN
1 R1 22 37 -15 -40.9 2 K1 8 28 -20 -71.1
3 K3 40 24 15 61.9
4 K4 195 32 163 513.2
5 K5 75 42 33 78.6
6 P1 208 65 143 220.5
7 P2 217 99 118 118.3
8 P3 90 60 30 49.8
9 A4 85 160 -75 -46.7
10 A6 315 239 76 31.9
11 A8 267 265 2 0.9
12 A12 178 140 38 26.8
13 A14 103 181 -79 -43.5
14 A15 33 78 -45 -58.1
15 A16 127 54 74 137.4
16 B3 107 149 -42 -28.1
17 B4 113 126 -14 -10.7
18 B5 133 74 59 79.2
19 B6 72 106 -34 -32.1
20 B7 167 133 34 25.3
21 B8 287 168 119 70.8
22 N1 132 105 27 25.8
23 N3 32 137 -105 -76.6
24 M1 133 71 62 88.4
25 J1 62 124 -62 -50.1
26 J2 148 177 -29 -16.5
27 J5 112 196 -84 -43.1
28 J7 55 156 -101 -64.7
29 J8 200 173 27 15.5
30 J9 359 458 -99 -21.6
31 J10 186 149 36 24.2
32 C3 239 100 139 139.0
33 C4 58 292 -235 -80.3
34 C8 51 132 -81 -61.3
35 C9 123 282 -159 -56.4
36 D1 237 338 -101 -29.9
37 D2 135 119 16 13.7
38 D6 350 153 197 128.6
39 T1 75 267 -192 -71.9
40 T2 90 171 -81 -47.4
41 T5 122 143 -21 -14.9
PURATA
140 146 -6 -4.44
Jadual 5 : Peratusan Perbandingan Hujan Bulan Januari 2016 dengan Hujan Jangka Panjang (LTM)
8 | P a g e
Jadual 5 menunjukkan peratusan perbandingan hujan bulan Januari 2016 dengan hujan
jangka panjang. Berdasarkan 41 stesen kemarau yang dipantau, empat belas (14)
stesen merekodkan defisit hujan melebihi 35% (kawasan kering); iaitu di:-
i. Abi Kg. Bahru, Perlis ii. Kuala Nerang, Kedah iii. Kg. Pulau Besar, Perak iv. Kolam Air Bukit Merah, Perak v. Stn. Petak Ujian Tg. Piandang, Perak vi. Sg. Lui Halt, Negeri Sembilan vii. Ladang Sg Gemas, Johor viii. Stor JPS Johor Bahru, Johor ix. Sek. Men. Munshi Sulaiman, Johor x. Rumah Pam Pahang Tua di Pekan, Pahang xi. Ladang Boh (Kawasan Kilang), Pahang xii. Sg. Lembing P.C.C.L Mill, Pahang xiii. JPS Kemaman, Terengganu xiv. SM Sultan Omar, Terengganu
Peta isohyet pada Rajah 4 menunjukkan peratusan perbandingan hujan Januari 2016
dengan hujan jangka panjang (LTM)
Rajah 4 : Peratusan Perbandingan Hujan Januari 2016 dengan hujan LTM
9 | P a g e
2.4 Peratusan Perbandingan Hujan Kumulatif 3 Bulan dengan LTM
Analisis berdasarkan purata kumulatif 3 bulan hujan sebenar, iaitu jumlah purata
hujan bulan November 2015, Disember 2015 dan Januari 2016 (656mm) berbanding
dengan purata kumulatif 3 bulan hujan jangka panjang (730mm) menunjukkan
terdapat pengurangan sebanyak -74mm, iaitu -10.2 %.
Berdasarkan 41 stesen kemarau yang dipantau, terdapat lapan (8) stesen merekodkan
defisit hujan melebihi 35% (kawasan kering); iaitu di:-
i. Kolam Air Bukit Merah, Perak ii. Ladang Sg Gemas, Johor iii. Empangan Labong, Endau, Johor iv. Rumah Pam Pahang Tua di Pekan, Pahang v. Gunung Gagau, Kelantan vi. JPS Kemaman, Terengganu vii. SM Sultan Omar, Terengganu viii. Setor JPS Kuala Terengganu, Terengganu
Peta isohyet pada Rajah 5 menunjukkan peratusan perbandingan hujan kumulatif 3
bulan dengan hujan kumulatif 3 bulan LTM.
Rajah 5 : Peratusan Perbandingan Hujan Kumulatif 3 Bulan dengan Hujan Kumulatif 3 Bulan LTM
10 | P a g e
2.5 Analisis Berdasarkan Jumlah Hujan 3 Bulan (Moving Three Months Analysis)
Analisis hujan 3 bulan dijalankan bertujuan untuk meramalkan kebarangkalian berlaku
kemarau di Semenanjung Malaysia dengan membandingkan keadaan hujan semasa
dengan purata hujan jangka panjang bagi 3 bulan bergerak.
Bagi bulan Januari 2016, analisis hujan 3 bulan dijalankan dengan mengambilkira data
hujan bagi bagi bulan-bulan berikut:-
i. Analisis 1 : November, Disember 2015 dan Januari 2016
ii. Analisis 2 : Disember 2015, Januari dan Februari LT 2016
iii. Analisis 3 : Januari 2016, Februari LT dan Mac LT 2016
Bagi Analisis 1, data hujan semasa bagi ketiga-tiga bulan terlibat digunapakai. Bagi
Analisis 2 dan 3, oleh kerana pada bulan Januari 2016, data hujan semasa bagi bulan
Februari 2016 dan Mac 2016 masih belum diperolehi, maka data hujan jangka panjang
(LT) digunakan di dalam analisis-analisis ini.
Setiap analisis seperti di atas dibahagikan kepada tiga (3) senario seperti berikut:-
i. Senario 1 : Andaian hujan normal untuk tiga bulan
ii. Senario 2 : Andaian penambahan 20% kepada purata hujan jangka panjang
iii. Senario 3 : Andaian pengurangan 20% kepada purata hujan jangka panjang
Keputusan analisis hujan 3 bulan untuk bulan Januari 2016 bagi ketiga-tiga senario
adalah diperincikan di dalam Rajah 6 hingga Rajah 8 dan Jadual 6 hingga Jadual 12.
11 | P a g e
Rajah 6 : Peta Isohyet Analisis Hujan 3 Bulan – Senario 1 (Andaian Hujan Normal untuk 3 Bulan)
Berdasarkan peta isohyet bagi Senario 1, dapat dirumuskan:-
i. Analisis 1 (November, Disember 2015 dan Januari 2016) menunjukkan, pada bulan Januari 2016, pengurangan hujan melebihi
35% (kering) berlaku di stesen berindeks A14, J1, J9, C4, D1, T1, T2 dan T5
ii. Analisis 2 (Disember 2015, Januari dan Februari LT 2016, meramalkan keadaan kering akan berlaku pada bulan Februari 2016 di
stesen berindeks R1, K1, A14, J1, J5, J9, C4, C8, D1, T1, T2 dan T5
iii. Analisis 3 (Januari, Februari LT dan Mac LT 2016) meramalkan keadaan kering akan berlaku pada bulan Mac 2016 di stesen
berindeks C4 dan T1
12 | P a g e
Rajah 7 : Peta Isohyet Analisis Hujan 3 Bulan – Senario 2 (Andaian Penambahan Hujan 20% kepada Purata Hujan Jangka Panjang)
Berdasarkan peta isohyet bagi Senario 2, dapat dirumuskan:-
i. Analisis 1 (November, Disember 2015 dan Januari 2016) menunjukkan, pada bulan Januari 2016, pengurangan hujan melebihi
35% (kering) berlaku di stesen berindeks A14, J1, J9, C4, D1, T1, T2 dan T5
ii. Analisis 2 (Disember 2015, Januari dan Februari LT 2016) meramalkan keadaan kering akan berlaku pada bulan Februari 2016 di
stesen berindeks K1, J1, J9, C4, C8, D1, T1, T2 dan T5
iii. Analisis 3 (Disember 2015, Januari LT 2016 dan Februari LT 2016) meramalkan TIADA keadaan kering akan berlaku pada bulan
Mac 2016
13 | P a g e
Rajah 8: Peta Isohyet Analisis Hujan 3 Bulan – Senario 3 (Andaian Pengurangan Hujan 20% kepada Purata Hujan Jangka Panjang)
Berdasarkan peta isohyet bagi Senario 3, dapat dirumuskan:-
i. Analisis 1 (November, Disember 2015 dan Januari 2016) menunjukkan, pada bulan Januari 2016, pengurangan hujan melebihi 35%
(kering) berlaku di stesen berindeks A14, J1, J9, C4, D1, T1, T2 dan T5
ii. Analisis 2 (Disember 2015, Januari dan Februari LT 2016) meramalkan keadaan kering akan berlaku pada bulan Februari 2016 di
stesen berindeks R1, K1, J1, J5, J9, C4, C8, D1, T1, T2 dan T5
iii. Analisis 3 (Januari, Februari LT dan Mac LT 2016) meramalkan keadaan kering akan berlaku pada bulan Mac 2016 di stesen berindeks
N3, C4, C9 dan T1
14 | P a g e
NO Station Index NOV DEC JAN Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev 1 R1 386 44 22 452 351 101 29
2 K1 230 21 8 259 315 -57 -18
3 K3 365 57 40 461 323 138 43
4 K4 214 27 195 436 413 23 5
5 K5 328 57 75 460 469 -9 -2
6 P1 443 38 208 689 455 233 51
7 P2 503 135 217 855 518 336 65
8 P3 360 105 90 555 428 126 29
9 A4 286 359 85 730 620 110 18
10 A6 282 327 315 924 913 11 1
11 A8 462 269 267 998 1053 -55 -5
12 A12 266 252 178 695 602 93 15
13 A14 258 109 103 470 798 -328 -41
14 A15 221 148 33 401 401 0 0
15 A16 315 201 127 643 398 244 61
16 B3 164 122 107 393 541 -148 -27
17 B4 327 166 113 606 637 -31 -5
18 B5 317 150 133 600 510 90 18
19 B6 445 212 72 729 628 101 16
20 B7 399 228 167 794 624 170 27
21 B8 409 406 287 1102 705 396 56
22 N1 333 212 132 677 554 123 22
23 N3 297 206 32 535 648 -113 -17
24 M1 290 124 133 547 428 119 28
25 J1 177 62 62 301 531 -230 -43
26 J2 363 349 148 860 678 181 27
27 J5 584 139 112 834 751 83 11
28 J7 222 206 55 483 635 -152 -24
29 J8 151 300 200 651 568 83 15
30 J9 321 233 359 913 1696 -783 -46
31 J10 66 235 186 487 579 -93 -16
32 C3 267 470 239 976 513 463 90
33 C4 144 190 58 391 1224 -833 -68
34 C8 436 77 51 564 648 -85 -13
35 C9 230 566 123 919 1208 -289 -24
36 D1 316 84 237 637 1656 -1019 -62
37 D2 320 282 135 737 616 121 20
38 D6 517 340 350 1206 1209 -3 0
39 T1 288 216 75 579 1427 -848 -59
40 T2 317 245 90 652 1285 -633 -49
41 T5 418 157 122 697 1378 -681 -49
318 198 140 656 730 -74 -10.2
Jadual 6 : Hujan 3 Bulan (November, Disember 2015 dan Januari 2016) bagi Analisis 1 -Senario 1,2 dan 3
15 | P a g e
NO Station Index DEC JAN FEB LT Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev 1 R1 44 22 48 114 188 -73.7 -39
2 K1 21 8 49 78 172 -93.8 -55
3 K3 57 40 47 144 150 -6.1 -4
4 K4 27 195 63 285 244 40.6 17
5 K5 57 75 94 226 294 -68.4 -23
6 P1 38 208 85 331 273 58.4 21
7 P2 135 217 98 450 344 106.0 31
8 P3 105 90 77 272 257 15.4 6
9 A4 359 85 173 617 534 83.7 16
10 A6 327 315 234 876 794 82.0 10
11 A8 269 267 251 787 895 -108.0 -12
12 A12 252 178 122 551 455 96.3 21
13 A14 109 103 180 391 627 -236.2 -38
14 A15 148 33 98 279 300 -21.5 -7
15 A16 201 127 72 400 251 149.5 60
16 B3 122 107 98 327 432 -105.4 -24
17 B4 166 113 165 443 497 -53.8 -11
18 B5 150 133 123 406 366 40.0 11
19 B6 212 72 137 421 436 -14.7 -3
20 B7 228 167 171 566 500 65.7 13
21 B8 406 287 179 871 590 281.2 48
22 N1 212 132 120 464 388 76.9 20
23 N3 206 32 108 346 492 -146.6 -30
24 M1 124 133 84 341 278 64.0 23
25 J1 62 62 98 222 422 -200.0 -47
26 J2 349 148 105 602 545 57.1 10
27 J5 139 112 138 389 624 -235.3 -38
28 J7 206 55 162 423 549 -125.6 -23
29 J8 300 200 93 593 469 123.5 26
30 J9 233 359 223 815 1482 -666.9 -45
31 J10 235 186 118 539 485 53.4 11
32 C3 470 239 97 806 406 400.3 99
33 C4 190 58 113 361 1018 -657.0 -65
34 C8 77 51 115 243 463 -220.4 -48
35 C9 566 123 119 808 938 -129.7 -14
36 D1 84 237 192 513 1303 -790.3 -61
37 D2 282 135 80 497 437 60.4 14
38 D6 340 350 85 775 797 -22.3 -3
39 T1 216 75 104 395 1040 -644.8 -62
40 T2 245 90 75 410 823 -413.8 -50
41 T5 157 122 91 370 797 -426.6 -54
198 140 119 457 545 -88.0 -16.1
Jadual 7 : Hujan 3 Bulan (Disember 2015, Januari dan Februari LT 2016) bagi Analisis 2- Senario 1
16 | P a g e
NO Station Index JAN FEB LT MAC LT Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev 1 R1 22 48 124 194 209 -15.2 -7
2 K1 8 49 144 202 221 -19.7 -9
3 K3 40 47 116 203 188 15.1 8
4 K4 195 63 140 398 235 163.2 70
5 K5 75 94 174 344 311 33.0 11
6 P1 208 85 134 427 284 143.1 50
7 P2 217 98 147 462 345 117.6 34
8 P3 90 77 123 290 260 29.9 11
9 A4 85 173 201 459 533 -74.6 -14
10 A6 315 234 293 842 766 76.2 10
11 A8 267 251 328 845 843 2.3 0
12 A12 178 122 188 487 450 37.5 8
13 A14 103 180 253 535 614 -78.8 -13
14 A15 33 98 147 278 323 -45.1 -14
15 A16 127 72 117 316 243 73.5 30
16 B3 107 98 122 327 369 -41.9 -11
17 B4 113 165 238 515 529 -13.5 -3
18 B5 133 123 197 453 394 58.8 15
19 B6 72 137 194 403 437 -34.1 -8
20 B7 167 171 222 560 527 33.7 6
21 B8 287 179 236 701 583 118.8 20
22 N1 132 120 200 453 426 27.1 6
23 N3 32 108 194 334 439 -104.8 -24
24 M1 133 84 150 368 305 62.4 20
25 J1 62 98 159 319 381 -62.2 -16
26 J2 148 105 183 436 465 -29.3 -6
27 J5 112 138 240 490 574 -84.4 -15
28 J7 55 162 203 420 521 -100.9 -19
29 J8 200 93 179 472 445 26.9 6
30 J9 359 223 208 790 889 -98.9 -11
31 J10 186 118 166 470 434 36.1 8
32 C3 239 97 147 483 344 139.0 40
33 C4 58 113 180 351 586 -234.9 -40
34 C8 51 115 197 363 443 -80.7 -18
35 C9 123 119 195 437 596 -159.2 -27
36 D1 237 192 226 656 757 -101.0 -13
37 D2 135 80 116 332 315 16.3 5
38 D6 350 85 85 519 323 196.6 61
39 T1 75 104 170 349 541 -191.7 -35
40 T2 90 75 156 321 402 -81.0 -20
41 T5 122 91 154 367 389 -21.4 -5
140 119 179 438 445 -6.5 -1.5
Jadual 8 : Hujan 3 Bulan (Januari, Februari LT dan Mac LT 2016) bagi Analisis 3 -Senario 1
17 | P a g e
NO Station Index DEC JAN FEB LT (+20%)
Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev
1 R1 44 22 58 124 188 -64.1 -34
2 K1 21 8 59 88 172 -84.0 -49
3 K3 57 40 56 153 150 3.3 2
4 K4 27 195 75 297 244 53.1 22
5 K5 57 75 113 245 294 -49.5 -17
6 P1 38 208 103 349 273 75.5 28
7 P2 135 217 117 469 344 125.6 37
8 P3 105 90 93 288 257 30.8 12
9 A4 359 85 208 652 534 118.3 22
10 A6 327 315 281 923 794 128.8 16
11 A8 269 267 301 837 895 -57.9 -6
12 A12 252 178 146 576 455 120.7 27
13 A14 109 103 215 427 627 -200.3 -32
14 A15 148 33 118 298 300 -1.9 -1
15 A16 201 127 87 415 251 163.9 65
16 B3 122 107 117 346 432 -85.9 -20
17 B4 166 113 198 476 497 -20.8 -4
18 B5 150 133 147 430 366 64.6 18
19 B6 212 72 164 448 436 12.7 3
20 B7 228 167 205 600 500 99.9 20
21 B8 406 287 215 907 590 317.0 54
22 N1 212 132 145 489 388 101.0 26
23 N3 206 32 129 367 492 -125.1 -25
24 M1 124 133 101 358 278 80.9 29
25 J1 62 62 117 241 422 -180.5 -43
26 J2 349 148 126 623 545 78.2 14
27 J5 139 112 166 416 624 -207.6 -33
28 J7 206 55 195 456 549 -93.2 -17
29 J8 300 200 111 611 469 142.0 30
30 J9 233 359 268 860 1482 -622.3 -42
31 J10 235 186 142 562 485 77.0 16
32 C3 470 239 117 826 406 419.8 103
33 C4 190 58 136 383 1018 -634.3 -62
34 C8 77 51 138 266 463 -197.4 -43
35 C9 566 123 143 832 938 -105.9 -11
36 D1 84 237 230 551 1303 -751.9 -58
37 D2 282 135 96 513 437 76.5 18
38 D6 340 350 102 792 797 -5.2 -1
39 T1 216 75 125 416 1040 -623.9 -60
40 T2 245 90 90 425 823 -398.8 -48
41 T5 157 122 109 388 797 -408.4 -51
198 140 143 481 545 -64.1 -11.8
Jadual 9 : Hujan 3 Bulan (Disember 2015, Januari dan Februari LT 2016) bagi Analisis 2 -Senario 2
18 | P a g e
NO Station Index JAN FEB LT (+20%)
MAC LT (+20%)
Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev
1 R1 22 58 148.6 228.65 209.4 19.2 9
2 K1 8 59 173.3 240.41 221.4 19.0 9
3 K3 40 56 139.5 235.44 187.7 47.8 25
4 K4 195 75 167.9 438.25 234.5 203.7 87
5 K5 75 113 209.3 397.29 310.6 86.7 28
6 P1 208 103 160.3 470.84 283.9 187.0 66
7 P2 217 117 176.9 511.13 344.5 166.6 48
8 P3 90 93 147.3 330.08 260.2 69.9 27
9 A4 85 208 240.8 533.61 533.5 0.1 0
10 A6 315 281 351.9 947.59 765.9 181.7 24
11 A8 267 301 393.0 960.76 842.8 118.0 14
12 A12 178 146 225.1 548.97 449.5 99.4 22
13 A14 103 215 303.8 621.65 613.9 7.8 1
14 A15 33 118 176.7 326.95 323.0 4.0 1
15 A16 127 87 140.4 354.22 242.9 111.3 46
16 B3 107 117 146.3 370.69 368.6 2.0 1
17 B4 113 198 285.5 596.00 528.9 67.1 13
18 B5 133 147 236.8 517.31 394.4 122.9 31
19 B6 72 164 232.6 468.97 436.9 32.1 7
20 B7 167 205 266.7 638.90 526.5 112.4 21
21 B8 287 215 283.2 784.40 582.6 201.8 35
22 N1 132 145 240.5 517.05 425.8 91.3 21
23 N3 32 129 233.3 394.64 439.0 -44.4 -10
24 M1 133 101 180.1 414.50 305.2 109.3 36
25 J1 62 117 191.2 370.57 381.4 -10.8 -3
26 J2 148 126 219.5 493.84 465.5 28.4 6
27 J5 112 166 288.0 565.42 574.2 -8.8 -2
28 J7 55 195 243.1 492.96 520.9 -28.0 -5
29 J8 200 111 214.8 525.81 444.6 81.2 18
30 J9 359 268 250.0 876.74 889.3 -12.6 -1
31 J10 186 142 199.7 526.88 433.9 93.0 21
32 C3 239 117 176.8 532.31 344.4 187.9 55
33 C4 58 136 216.2 409.42 585.7 -176.3 -30
34 C8 51 138 236.6 425.15 443.5 -18.3 -4
35 C9 123 143 233.6 499.76 596.2 -96.4 -16
36 D1 237 230 271.8 739.23 756.5 -17.3 -2
37 D2 135 96 139.6 370.99 315.3 55.6 18
38 D6 350 102 101.5 553.33 322.7 230.6 71
39 T1 75 125 203.5 403.86 540.7 -136.8 -25
40 T2 90 90 187.3 367.03 401.8 -34.8 -9
41 T5 122 109 185.1 416.25 388.6 27.7 7
140 143 215.1 498.0 444.8 53.2 12
Jadual 10 : Hujan 3 Bulan (Januari, Februari LT & Mac LT 2016) bagi Analisis 3- Senario 2
19 | P a g e
NO Station Index DEC JAN FEB LT (-20%)
Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev
1 R1 44 22 39 105 188 -83.4 -44
2 K1 21 8 39 68 172 -103.7 -60
3 K3 57 40 38 134 150 -15.5 -10
4 K4 27 195 50 272 244 28.0 11
5 K5 57 75 75 207 294 -87.2 -30
6 P1 38 208 68 314 273 41.3 15
7 P2 135 217 78 430 344 86.5 25
8 P3 105 90 62 257 257 -0.1 0
9 A4 359 85 139 583 534 49.0 9
10 A6 327 315 187 829 794 35.2 4
11 A8 269 267 200 736 895 -158.1 -18
12 A12 252 178 98 527 455 71.9 16
13 A14 109 103 144 355 627 -272.1 -43
14 A15 148 33 79 259 300 -41.1 -14
15 A16 201 127 58 386 251 135.0 54
16 B3 122 107 78 307 432 -125.0 -29
17 B4 166 113 132 410 497 -86.8 -17
18 B5 150 133 98 381 366 15.4 4
19 B6 212 72 110 394 436 -42.1 -10
20 B7 228 167 137 532 500 31.5 6
21 B8 406 287 143 836 590 245.4 42
22 N1 212 132 96 440 388 52.8 14
23 N3 206 32 86 324 492 -168.2 -34
24 M1 124 133 68 325 278 47.1 17
25 J1 62 62 78 202 422 -219.6 -52
26 J2 349 148 84 581 545 36.1 7
27 J5 139 112 111 361 624 -262.9 -42
28 J7 206 55 130 391 549 -158.1 -29
29 J8 300 200 74 574 469 105.0 22
30 J9 233 359 179 771 1482 -711.6 -48
31 J10 235 186 94 515 485 29.8 6
32 C3 470 239 78 787 406 380.9 94
33 C4 190 58 91 338 1018 -679.6 -67
34 C8 77 51 92 220 463 -243.3 -53
35 C9 566 123 95 784 938 -153.6 -16
36 D1 84 237 154 475 1303 -828.7 -64
37 D2 282 135 64 481 437 44.4 10
38 D6 340 350 68 758 797 -39.4 -5
39 T1 216 75 84 375 1040 -665.7 -64
40 T2 245 90 60 395 823 -428.7 -52
41 T5 157 122 73 352 797 -444.8 -56
198 140 95 433 545 -111.8 -21
Jadual 11 : Hujan 3 Bulan (Disember 2015, Januari dan Februari LT 2016) bagi Analisis 2 -Senario 3
20 | P a g e
NO Station Index JAN FEB LT (-20%)
MAC LT (-20%)
Cumm of 3 Months Actual Rainfall Cumm of 3 Months LT Rainfall Diff in Rainfall (mm) % Dev
1 R1 22 38.7 99.1 159.77 209.4 -49.6 -24
2 K1 8 39.4 115.5 162.94 221.4 -58.4 -26
3 K3 40 37.6 93.0 170.12 187.7 -17.6 -9
4 K4 195 50.3 111.9 357.16 234.5 122.7 52
5 K5 75 75.3 139.6 289.86 310.6 -20.7 -7
6 P1 208 68.3 106.9 383.23 283.9 99.3 35
7 P2 217 78.2 117.9 413.09 344.5 68.6 20
8 P3 90 61.8 98.2 250.05 260.2 -10.1 -4
9 A4 85 138.6 160.5 384.07 533.5 -149.4 -28
10 A6 315 187.1 234.6 736.73 765.9 -29.2 -4
11 A8 267 200.5 262.0 729.51 842.8 -113.3 -13
12 A12 178 97.6 150.1 425.15 449.5 -24.4 -5
13 A14 103 143.6 202.5 448.60 613.9 -165.3 -27
14 A15 33 78.5 117.8 228.80 323.0 -94.2 -29
15 A16 127 57.9 93.6 278.48 242.9 35.6 15
16 B3 107 78.3 97.5 282.79 368.6 -85.8 -23
17 B4 113 132.0 190.3 434.83 528.9 -94.1 -18
18 B5 133 98.3 157.9 389.21 394.4 -5.2 -1
19 B6 72 109.6 155.1 336.65 436.9 -100.3 -23
20 B7 167 136.8 177.8 481.60 526.5 -44.9 -9
21 B8 287 143.1 188.8 618.43 582.6 35.8 6
22 N1 132 96.4 160.3 388.70 425.8 -37.1 -9
23 N3 32 86.2 155.5 273.76 439.0 -165.3 -38
24 M1 133 67.6 120.1 320.67 305.2 15.5 5
25 J1 62 78.2 127.5 267.71 381.4 -113.7 -30
26 J2 148 84.2 146.3 378.56 465.5 -86.9 -19
27 J5 112 110.6 192.0 414.12 574.2 -160.1 -28
28 J7 55 129.9 162.1 346.97 520.9 -173.9 -33
29 J8 200 74.0 143.2 417.21 444.6 -27.4 -6
30 J9 359 178.5 166.7 704.16 889.3 -185.2 -21
31 J10 186 94.5 133.1 413.08 433.9 -20.8 -5
32 C3 239 77.7 117.8 434.54 344.4 90.1 26
33 C4 58 90.5 144.1 292.11 585.7 -293.6 -50
34 C8 51 91.7 157.7 300.43 443.5 -143.0 -32
35 C9 123 95.4 155.8 374.17 596.2 -222.0 -37
36 D1 237 153.6 181.2 571.82 756.5 -184.7 -24
37 D2 135 64.2 93.1 292.32 315.3 -23.0 -7
38 D6 350 68.2 67.6 485.39 322.7 162.6 50
39 T1 75 83.6 135.7 294.24 540.7 -246.5 -46
40 T2 90 59.8 124.9 274.69 401.8 -127.2 -32
41 T5 122 72.8 123.4 318.17 388.6 -70.4 -18
140 95.3 143.4 378.6 444.8 -66.2 -15
Jadual 12 : Hujan 3 Bulan (Januari, Februari LT dan Mac LT 2016) bagi Analisis 3- Senario 3
21 | P a g e
Berdasarkan keputusan Analisis Hujan 1 bulan dan Analisis Hujan 3 Bulan bagi bulan
Januari 2016 untuk keseluruhan senario, kebarangkalian kawasan kering bagi bulan
Februari 2016 dan Mac 2016 adalah seperti Jadual 13, Jadual 14 dan Jadual 15.
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
Februari 2016
R1 Abi Kg Bahru Kangar Kedah Kangar
K1 Kuala Nerang Padang Terap
Kedah Padang Terap
A14 Kolam Air Bkt. Merah Kerian Perak Kerian
J1 Ldg Sungai Gemas Segamat Johor Segamat
J5 Stor JPS Johor Bahru Johor Bahru Johor Johor Bahru
J9 Empangan Labong Mersing Johor Mersing
C4 Rumah Pam Pahang Tua di Pekan
Pekan Pahang Pekan
C8 Ladang Boh (Kawasan Kilang)
Cameron Highland
Pahang Cameron Highland
D1 Gunung Gagau Gua Musang
Kelantan Gua Musang
T1 JPS Kemaman Kemaman Terengganu Kemaman
T2 Sek Men Sultan Omar Dungun Terengganu Dungun
T5 Setor JPS Kuala Terengganu
Kuala Terengganu
Terengganu Kuala Terengganu
Mac 2016
C4 Rumah Pam Pahang Tua di Pekan
Pekan Pahang Pekan
T1 JPS Kemaman Kemaman Terengganu Kemaman Jadual 13 : Senarai Stesen Kebarangkalian Kering Berpandukan Analisis Hujan bagi Bulan Januari
2016 (Senario 1 : Sekiranya Berlaku Hujan Normal bagi bulan Februari 2016 dan Mac 2016)
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
Februari2016
K1 Kuala Nerang Padang Terap
Kedah Padang Terap
J1 Ldg Sungai Gemas Segamat Johor Segamat
J9 Empangan Labong Mersing Johor Mersing
C4 Rumah Pam Pahang Tua di Pekan
Pekan Pahang Pekan
C8 Ladang Boh (Kawasan Kilang)
Cameron Highland
Pahang Cameron Highland
D1 Gunung Gagau Gua Musang
Kelantan Gua Musang
T1 JPS Kemaman Kemaman Terengganu Kemaman
T2 Sek Men Sultan Omar Dungun Terengganu Dungun
T5 Setor JPS Kuala Terengganu
Kuala Terengganu
Terengganu Terengganu
Mac 2016
TIADA
Jadual 14 : Senarai Stesen Kebarangkalian Kering Berpandukan Analisis hujan bagi Bulan Januari 2016 (Senario 2 : Sekiranya Berlaku Pertambahan 20% Kepada Purata Hujan Jangka Panjang bagi
Bulan Februari 2016 dan Mac 2016)
22 | P a g e
Bulan Indeks Stesen
Nama Stesen Daerah Negeri Kawasan Kebarangkalian
Kering
Februari 2016
R1 Abi Kg Bahru Kangar Kedah Kangar
K1 Kuala Nerang Padang Terap
Kedah Padang Terap
J1 Ladang Sg Gemas Segamat Johor Segamat
J5 Stor JPS Johor Bahru Johor Bahru Johor Johor Bahru
J9 Empangan Labong Mersing Johor Mersing
C4 Rumah Pam Pahang Tua di Pekan
Pekan Pahang Pekan
C8 Ladang Boh (Kawasan Kilang)
Cameron Highland
Pahang Cameron Highland
D1 Gunung Gagau Gua Musang Kelantan Gua Musang
T1 JPS Kemaman Kemaman Terengganu Kemaman
T2 Sek Men Sultan Omar Dungun Terengganu Dungun
T5 Setor JPS Kuala Terengganu
Kuala Terengganu
Terengganu Terengganu
Mac 2016
N3 Sg Lui Halt Kuala Pilah Negeri Sembilan
Kuala Pilah
C4 Rumah Pam Pahang Tua di Pekan
Pekan Pahang Pekan
C9 Sg Lembing PCCL Mill Kuantan Pahang Kuantan
T1 JPS Kemaman Kemaman Terengganu Kemaman Jadual 15 : Senarai Stesen Kebarangkalian Kering Berpandukan Analisis hujan bagi Bulan Januari 2016 (Senario 3 : Sekiranya Berlaku Pengurangan 20% Kepada Purata Hujan Jangka Panjang bagi
Bulan Februari 2016 dan Mac 2016)
23 | P a g e
3. ANALISIS LUAHAN SUNGAI
3.1 Bacaan Purata Luahan Sungai yang Dipantau bagi Bulan Januari 2016.
B. NAMA
STESEN NEGERI
PARAS
NORMAL
SUNGAI
(m)
PURATA
PARAS
SUNGAI
BULAN DIS
(m)
PURATA
KADARALIR
SUNGAI
BULAN DIS
(m3/s)
PURATA
PARAS
SUNGAI
BULAN JAN
(m)
PURATA
KADARALIR
SUNGAI
BULAN JAN
(m3/s)
KADARALIR KEMARAU TEMPOH ULANGAN UNTUK
7 HARI KADARALIR RENDAH
(m3/s)
2-Tahun 5-Tahun 10-
Tahun 20-Tahun
01
SG.MUAR DI
BULOH
KASAP
JHR 15.50 5.44 26.88 4.87 16.79 8.05 5.05 4.2 3.2
02
SG .BEKOK
DI BT.77 JLN
Y.P
JHR 5.94 3.55 4.15 3.32 2.48 1.88 0.73 0.35 0.14
03
SG. JOHOR
AT RANTAU
PANJANG
JHR 4.00 3.72 41.59 3.13 27.39 8.14 4.79 3.15 1.9
04
SG. MUDA
AT
JAMBATAN
SYED OMAR
KDH 8.00 7.17 90.35 6.45 28.75 17.6 10.96 9.33 8.6
05 SG.GALAS
DI DABONG KEL 28.00 26.46 205.11 25.89 129.13 195.13 101.74 61.48 33.74
06
SG.KELANT
AN DI
KUSIAL
KEL 10.00 10.67 811.40 10.26 648.80 155.4 98.9 70.5 48.5
07
SG. LINGGI
AT SUA
BETONG
N. S 5.00 - - 4.02 1.49 3.47 1.73 1.07 0.65
24 | P a g e
B. NAMA
STESEN NEGERI
PARAS
NORMAL
SUNGAI
(m)
PURATA
PARAS
SUNGAI
BULAN DIS
(m)
PURATA
KADARALIR
SUNGAI
BULAN DIS
(m3/s)
PURATA
PARAS
SUNGAI
BULAN JAN
(m)
PURATA
KADARALIR
SUNGAI
BULAN JAN
(m3/s)
KADARALIR KEMARAU TEMPOH ULANGAN UNTUK
7 HARI KADARALIR RENDAH
(m3/s)
2-Tahun 5-Tahun 10-
Tahun 20-Tahun
08
SG.BENTON
G DI KUALA
MARONG
PHG 86.00 85.61 8.65 85.26 4.72 2.77 1.64 1.16 0.83
09
SG.KUANTA
N DI BUKIT
KENAU
PHG 17.00 16.62 2.35 16.36 1.34 8.28 1.5 0.91 0.64
10
SG.PAHANG
DI SUNGAI
YAP
PHG 44.00 45.29 756.24 44.64 572.60 104.52 51.78 32.16 20.05
11
SG.TRIANG
DI
JAM.KERET
API
PHG 31.00 31.85 30.10 30.80 10.59 18.11 7.31 3.33 0.9
12
SG.PAHANG
DI
TEMERLOH
(LUBUK
PASU)
PHG 26.00 25.74 833.10 24.68 362.20 165.43 110.86 90.75
78.44
13
SG. KULIM
DI ARA
KUDA
P.P 7.00 6.40 15.83 6.10 7.23 1.74 1.22 1.07 0.99
14
SG.MUDA DI
LADANG
VICTORIA
P. P 3.50 3.53 101.09 2.84 37.52 15.75 9.83 8.2 7.39
15 SG.PLUS DI
KG.LINTANG PRK 52.00 53.38 64.08 52.93 40.52 13.3 9.29 7.41 6.03
25 | P a g e
B. NAMA
STESEN NEGERI
PARAS
NORMAL
SUNGAI
(m)
PURATA
PARAS
SUNGAI
BULAN DIS
(m)
PURATA
KADARALIR
SUNGAI
BULAN DIS
(m3/s)
PURATA
PARAS
SUNGAI
BULAN JAN
(m)
PURATA
KADARALIR
SUNGAI
BULAN JAN
(m3/s)
KADARALIR KEMARAU TEMPOH ULANGAN UNTUK
7 HARI KADARALIR RENDAH
(m3/s)
2-Tahun 5-Tahun 10-
Tahun 20-Tahun
16
SG.PERAK
DI
ISKANDAR
BRIDGE
PRK 32.00 32.51 231.17 31.81 134.70 122.65 68.94 45.49 29.16
17 SG. KERIAN
DI SELAMA PRK 10.00 9.47 30.58 8.60 16.86 10.13 6.09 4.21 2.84
18 SG.LANGAT
DI DENGKIL SEL 4.00 3.91 55.40 3.32 17.33 7.29 4.31 3.15 2.41
19
SG.BERNAM
DI
JAMBATAN
SKC
SEL 16.60 17.36 80.70 16.48 36.69 15.79 12.17 10.88 10.12
20
SG.BERNAM
DI TANJUNG
MALIM
SEL 38.30 36.77 4.00 36.47 2.72 3.27 2.28 1.97 1.81
21 SG.LANGAT
DI KAJANG SEL 22.89 22.53 10.42 22.31 7.06 2.29 1.13 0.79 0.61
22
SG.SELANG
OR DI
RANTAU
PANJANG
SEL 4.50 5.72 84.55 4.17 18.83 18.87 13.07 9.95 7.4
23 SG.LUI DI
KG. SG. LUI SEL 77.00 74.81 6.46 74.75 5.60 0.65 0.37 0.24 0.16
26 | P a g e
Jadual 16 : Rekod Luahan Sungai pada Januari 2016
B. NAMA
STESEN NEGERI
PARAS
NORMAL
SUNGAI
(m)
PURATA
PARAS
SUNGAI
BULAN DIS
(m)
PURATA
KADARALIR
SUNGAI
BULAN DIS
(m3/s)
PURATA
PARAS
SUNGAI
BULAN JAN
(m)
PURATA
KADARALIR
SUNGAI
BULAN JAN
(m3/s)
KADARALIR KEMARAU TEMPOH ULANGAN UNTUK
7 HARI KADARALIR RENDAH
(m3/s)
2-Tahun 5-Tahun 10-
Tahun 20-Tahun
24
SG.SEMENY
IH DI
RINCHING
SEL 22.00 20.52 4.47 20.48 3.82 1.93 1.14 0.96 0.88
25
SG.DUNGUN
DI
JAM.JERAN
GAU
TER 7.00 5.88 42.68 5.47 17.48 26.84 12.81 6.12 1.14
27 | P a g e
3.2 Sungai yang berada dibawah Drought Flow 5 Year : 2 Sungai
28 | P a g e
29 | P a g e
4. ANALISIS STORAN EMPANGAN
4.1 Aras Air bagi Empangan-empangan yang Dipantau pada Januari 2016
BIL. ID
STESEN NEGERI NAMA EMPANGAN
NORMA
L LEVEL
(M)
MIN
LEVEL
(M)
MAX
LEVEL
(M)
ARAS
AIR MIN
BULAN
JAN (M)
ARAS
AIR MAX
BULAN
JAN (M)
ARAS AIR
PURATA
BULAN
DIS (M)
ARAS
AIR
PURATA
BULAN
JAN (M)
STORAN
EMPANGA
N (MCM)
STORAN
EMPANGA
N (%)
1 1832401 JHR EMPANGAN MACHAP 15.85 13.10 19.4 16.08 16.71 16.49 16.39 15.66 100
2 1931425 JHR EMPANGAN SEMBRONG 10.00 6.00 13.8 9.46 9.82 9.49 9.57 26.9 88.23
3 2030401 JHR EMPANGAN BEKOK 15.50 8.70 22.00 13.65 14.11 13.34 13.82 37.80 61.85
4 2536468 JHR EMPANGAN LABONG 8.03 7.01 10.06 5.95 6.13 5.97 6.05 0.51 8.54
5 6397405 KDH EMPANGAN PADANG
SAGA 21.18 18.50 22.60 19.06 19.55 19.54 19.43 0.08 54.66
6 5907401 KDH EMPANGAN BERIS 84.00 68.00 86.40 82.87 83.74 84.17 83.18 110.22 91.77
7 5919403 KEL EMPANGAN BUKIT
KWONG 16.76 12.20 17.72 14.85 15.01 13.71 14.95 6.78 49.20
8 6207480 KDH EMPANGAN PEDU 97.56 67.07 97.56 95.49 96.83 96.64 96.20 997.67 92.38
9 6307480 KDH EMPANGAN AHNING 105.70 101.90 114.00 110.18 111.27 110.64 110.88 248.42 90.72
10 6108480 KDH EMPANGAN MUDA 94.50 82.20 103.30 100.31 100.87 101.01 100.62 154.51 100
11 2634402 PHG EMPANGAN ANAK
ENDAU 19.00 12.00 21.60 19.15 19.19 19.10 19.15 38.86 67.29
12 6502436 PLS EMPANGAN TIMAH
TASOH 29.10 25.30 30.10 27.88 28.37 28.38 28.09 27.57 69.17
13 4613401 PRK EMPANGAN ULU KINTA 245.00 189.80 245.00 245.17 245.26 245.29 245.22 67.82 100
30 | P a g e
BIL. ID
STESEN NEGERI NAMA EMPANGAN
NORMA
L LEVEL
(M)
MIN
LEVEL
(M)
MAX
LEVEL
(M)
ARAS
AIR MIN
BULAN
JAN (M)
ARAS
AIR MAX
BULAN
JAN (M)
ARAS AIR
PURATA
BULAN
DIS (M)
ARAS
AIR
PURATA
BULAN
JAN (M)
STORAN
EMPANGA
N (MCM)
STORAN
EMPANGA
N (%)
14 5006401 PRK EMPANGAN BUKIT
MERAH 8.70 6.40 9.80 8.12 8.49 8.24 8.30 65.50 82.86
15 3218402 SEL EMPANGAN LANGAT 220.96 204.21 220.96 213.65 215.90 211.37 214.79 22.16 65.00
16 3517401 SEL EMPANGAN SUNGAI
SELANGOR 220.00 184.63 220.00 220.15 220.20 217.97 220.17 230.00 100
17 3114401 SEL EMPANGAN TASIK
SUBANG 37.87 34.75 37.87 38.57 38.71 38.56 38.67 4.21 100
18 3515401 SEL EMPANGAN SUNGAI
TINGGI 59.50 45.03 59.50 56.50 58.04 55.85 57.32 98.58 86.07
19 3018402 SEL EMPANGAN SEMENYIH 111.00 84.30 113.90 110.26 111.03 109.06 110.74 58.10 82.24
20 3216403 WLY EMPANGAN BATU 102.70 79 107.3 98.95 101.59 97.13 100.40 27.15 84.92
21 3217435 WLY EMPANGAN KLANG
GATE 94 84 98 95.16 95.65 95.37 95.34 28.05 100
22 - N.SMN EMPANGAN
GEMENCHEH 110 86 120 94.46 94.92 93.31 94.73 6290.00 21.11
Jadual 17 : Rekod Aras Empangan pada Bulan Januari 2016
31 | P a g e
4.2 Empangan di Bawah Baki Storan 50% : 2 Empangan
32 | P a g e
33 | P a g e
5. PENGESAHAN
Disediakan Oleh:-
Mohammad Hasmiruddin bin Mohd Nasaruddin Penolong Jurutera
Unit Ramalan dan Operasi Seksyen Ramalan Banjir dan Kemarau
Siti Azura binti Mat Daud Penolong Pengarah Kanan (Fleksi)
Unit Ramalan dan Operasi Seksyen Ramalan Banjir dan Kemarau
Disemak Oleh;
______________________________________________ Muhammad Al-Muzammil bin Chu Ahmad
Ketua Penolong Pengarah Unit Ramalan dan Operasi
Seksyen Ramalan Banjir dan Kemarau
Tarikh : 04 Mac 2016