Kct Profile

Preview:

Citation preview

FINAL

We Build Trust . . .

. ................................................................

FINAL

CONTENTS

Foreword.............................................................................Mission & Vision.................................................................. Profile...................................................................................Key Activities.......................................................................

KCT Orgenization Chart & Personnel..............................

KCT Owned Machinery And Equipment List..................

Ready Mixed Concrete Dept. ..................................... Machinery & Reinforcement Dept. .............................

Global Trade & Supplying Dept. ......................................

QA / QC / HSE.....................................................................

Why KCT ?...........................................................................Contacts Information.......................................................

4

5

6

7

Certificates 8

13

20

77

81

85

88

90

92

93

KCT Projects. ................................................................

4

Chairman Word

FINAL

To move AL KHAYYAT COTRACTING TRADING from a local establishment in Syrian Arab Republic to a leader regional and international one capable to execute all kind of projects even in the hardest circumstances, armed with confidence, knowledge, and long experience in our field.

To rise the real estate and projects local market up to an international levels to commensurate the exceptional building renaissance that takes place in Syrian Arab Republic during last few years, through applying the highest professionalits , creativity and commitment criterias in whole business fields matching the top of perfection levels.

Mission & Vision

OUR VISION

OUR MISSION

FINAL

6

KCT is a Syrian establishment was formed by Mr. Mouhamad Resslan Al Khayyat. Ever since it started operating in 1983, KCT has grown to assume a leading role in the field of construction for the quality and timely completion of its projects.

KCT is classified by the Ministry of Housing & Construction in Syrian Arab Republic as an “A” class contractor in the field of construction of all types of projects and all related components such as roads, bridges, buildings, water & sewage and electromechanical works.

concrete products, foundation, reinforcement, and real estate investments.

KCT offers turn key engineering and construction projects in Syria. A large measure of its success has come from its use of qualified technical & engineering staff, owned building machinery, equipment and management systems to tackle the most difficult jobs.

KCT has earned a reputation in the Syrian market through executing huge number of projects (Bridges & Tunnels, Reinforcement Works, Hospitals, Factories, Hotels & Residentel Cities, Universities & Instituts and Palaces ....etc) in ideal time with best quelity criterion Such as (ready mixed concrete, cement products, piles, anchors, shot-crete and precast bridges).

KCT est. is a full service construction firm offering a broad menu of specialized services to our national and local clients.

Our professional leadership and many years of experience allow us to focus on special customer needs. .

We believe that there are “five critical” factors that determine the project’s success:• Responsiveness• Timeliness• Quality & Safety• Flexibility• Cost Awareness

We are dedicated to spending an extra time understanding each project as not only sticks and bricks but as a business catering to our clients’ goals. The management team understands that the highest level of “trust and confidence” awarded by a client is the responsibility of building the next project. We take great pride in this confidence and trust.

Profile

turnover rate was 42000,000 USD in 2007 , 45500,00 USD in 2008 ,

while our estimated turnover rate for 2010 is 100,000,000 USD.KCT

Other activities of the company are engineering services, ready mixed

65350000 USD in 2009

Concrete ,

FINAL

KCT through its Projects Department involved in the General Constructions & Turne Key Projects; commercial and educational buildings, Residential complexes, bridges, industrial buildings, which include site development, infrastructure and utilities all types of construction, structural works, plant infrastructural civil works, and surveying services. i.e; KCT executes all civil, mechanical, electrical, sanitary, telecommunication, renovation, beautification works.

CIVIL WORKS: Site Development, Road Works, Bridges Works, Earth Works, and Water Treatment Works.

MECHANICAL WORKS: Water Treatment Plants, Plumbing, Drainage Installations, Vacuum

Systems, Fire Protection Systems, Air Conditioning & Heating Systems, Ventilation Piping Networks,…etc.

ELECTRICAL WORKS: Supply and Install all those of Light Points & Lightening Devices, Cabels, Panel Boards, Power Generators, Audiovisual Systems, Alarm System, Operator & Phone Devices, Controling Systems,…etc.

KCT also carried out study, design and build projects, besides to engineering and consulting services.KCT established other departments in addition to the Projects Department specialized in differnet fields mentioned below:

Ready Mixed Concrete Dept.

Ownership of lands, Intergrated Cities, Buildings, and Apartments completed with all services and furnishings.

Real Estate Projects Dept.

Specialized in producing concrete and other Cemented Products with best modern machineries through four owned automated concrete plants and concrete patching machines up to 64 m height provided by 43 trans-mixers with different capacities .

Machinery and Foundations Dept.Specialized in the design and installation of foundation Systems for construction projects, Piling, and reinforcing works using a professional machineries up to 28 ones for various types of excavations.

Global Trade & Supplying Dept.Specialized in Supplying all kind of raw material and decorations issue Our mission is to make quality products available to clients at reasonable price on time. Our aim is to cater the needs of the client with adequate support of premier technical and management services in a highly responsible manner.For that all, KCT offeres a wider range of services in the most economic way.

Key Activities

FINAL

8

CERTIFICATES

SINCE 1983

FINAL

40

Orgenization Chart & Personnel

SINCE 1983

ORGANIZATION CHART

Arthur
Line
Arthur
Line
Arthur
Line
Arthur
Line
Arthur
Line
Arthur
Line
Arthur
Line
Arthur
Line

FINAL

46

KCT PROJECTS

SINCE 1983

REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATEContract Value

(USD)GLIMPSE ABOUT THE PROJECT

1 Yaafour Resort Damascus 27000 sqm 52000 sqm 100% 12,238,000.00 4 stars hotel, playgrounds, sport halls

2 Al Bayt Al Shami Damascus 20500 sqm 90000 sqm 80% 83,200,000.00

residential palace of 3 floors - floor area 3000 sqm including all civil, archtectural, electrical, mechanical and agricultural works , decorationand gardens design - mosaics - site works of 5000 sqm

3 Intradus Resort and Hotel Tartous 37000 sqm 35000 sqm 75% 30,000,000.00 _

4 Prime Minister of Qatar Palace - Sabboura Damascus 15500 sqm 52000 sqm 45% 51,500,000.00 landscape 32000 m2

5 Qatari Prince Palace at Palmyra Palmyra 105000 sqm 18000 sqm 90% 40,200,000.00civil, archtectural, electrical, mechanical , decorationand gardens design

6 Manors/ Palmyra Palmyra 28000 sqm 60000 sqm 100% 2,000,000.00 _

7 Presidential Platform for Camels Track Race Palmyra 7000 sqm _ 100% 3,700,000.00two main divisions Bldg (presidential - platform and auditorium) as well as employees offices - turn key project

8 Fishermen Appartments Lattakia 7280 sqm 17000 sqm 10% 5,300,000.00 104 appartments, 70 sqm each - turnkey project

9 Al Salemlik Bldg / Yaafour Damascus 2600 sqm 600 sqm under execution 3,200,000.00 _

10 Al Jaryan Mosque / Yaafour Damascus 2800 sqm 400 sqm under execution 1,800,000.00 _

11 Al Shamia Villas Project Damascus 6600 sqm 22000 sqm under execution 15,000,000.00 _

12 Al Diyar Al Qataria - Ibn Hani Damascus 8000 sqm 17000 sqm 100% 12,576,000.005 floors Bldg - 104 residences - each residence 70 sqm - turn key

13 Zaman Al Khair Touristic Compound Damascus 25000 sqm 17500 sqm 100% 5,582,000.00restauarants , cars trach race, children entertainment

14Shaikh Bin Hamad Bin Khalifa

Al Atiyya PalaceDamascus 6000 sqm 8000 sqm 100% 2,500,000.00

residential villa of 3 floors, all civil, archtectural, electrical, mechanical , decorationand gardens design - damascene mosaics

Hotels and Palaces Projects

FINAL

Project and LocationClientWork Description

Execution Period Performance Percentage

• Ya'fourResortExpansion-Damascus• Jupiter• Turnkeyproject-Luxurystar hotel capacity27000sq.m• 180Day• 100%

Ya'four Resort Expansion

chalet and resorts.

built up area

residential

FINAL

Execution Period •

Al Bayt al shami Project and Location • Al Bayt Al Shami- YafourClient •Work Description • palace, 4 floors. Civil, Architectural, Mechanical, Electrical and Agricultural

18 Months

Qatari Prince

Performance Percentage: 80%

FINAL

FINAL

Antradous Tartous Project and Location . Client • Al Amer Group & Wahoud Group

Scope of Work: Turn key

Job Description: built up area 37000 sqm, civil, mechanical, MEP works

Execution Period: 8 months

Performance Percentage: 75 %

Antradous Hotel and Resorts

FINAL

Al Saboura PalaceProject and Locatio . Al Saboura Palace - Saboura

Work Description •

Client • Prime Minister of Qatar

Turn Key Project

Execution Period: 18 months

Performance Percentage: 45 %

FINAL

Palmyra Palace Project and Location

Palmyra Palace

-

PalmyraClient .

Qatari

Prince

Scope of Work: Turn Key Work Description: Built up area 10500 sqm, Palace, chalet, landscape, Majles

Execution Period: 12 months

Performance Percentage: 90 %

Project and Location: Palmyra Client: Qatari prince Work Description: Turnkey project Execution Period: 4 months Performance Percentage: 100 %

Qatari Prince Manors

Project and Location: Palmyra Client: Qatari prince Work Description: Turnkey project Execution Period: 3 months Performance Percentage: 100 %

Presidential Platform for Camels Track Race

FINAL

Fishermen AppartmentsProject and Location • FishermenAppartments-LattakiaClient • QatariDiarRealEstateInvestmentCompanyWork Description • Constructingbuildingof5floors,

104apartments,70sqmeachTurnKeyProject

Execution Period • 310DayPerformance Percentage • 100%

FINAL

64

Project and LocationClientWork Description

Execution Period

• SihnayaVilla-Damascus• Private• StructuringresidentialVilla -TurnKey/7150m2-TheProject

mechanical,decorationworks.Inadditiontogardendesignworks.• 360Day

Sihnaya Villa

REF PROJECT NAME Location (sqm) BLDG AREA LAND AREA COMPLETION RATEContract Value

(USD)GLIMPSE ABOUT THE PROJECT

1 Steel Melt Factory / Adra Industrial AreaDamascus

Countryside175000 sqm 165000 sqm 80% 94,330,000

the project consists of different blocks:1- A.S.P2- W.T.P (Water Treatment Plant)3- R.W.T.P (Rural Water Treatment Plant)4- LPG5- Workshop6- Substation7- F.T.P8- Ferroalloy9- Scrap Yard10- E.A.F11- C.C.M (Continous Cast Machine)12- Slag Area13- Roads and Infrastructure14- Piping Worksin addition to all the mechanical and electrical works

2 Steel Scrap WarehousesDamascus

Countryside68000 sqm 120000 sqm 90% 15,540,000

the project consists of different blocks:1- Admin Bldg: 4 floors2- Workshops Bldg: 4 floors3- Workshops warehouse Bldg: 5000 sqm4- Steel Scrap yards: 8000 sqm5- Oil Station6- Various Service Bldgs7- Special break room on the admin Bldg

3 SHAM PRINTDamascus

Countryside6244 sqm 9573 sqm 50% 35,000,000 MEP,Architectural, structural works - Turn key project

4 Mowaslat Sq Parking Damascus 13500 sqm _ 100% 6,120,000Structural, Architectural, Electrical, Mechanical, and Controling Works / 4 floors under ground parking 13500m2 / 500 cars

5Installing and operating the technical inspection equipment of gas, lights,

replacement and cars brakesAll Syrian Provinces 39000 sqm _ 100% 3,588,936

Supply, install, and commissioning electro-mech. equipments for testing big and small cars. 13 hangars with 2 test lanes each.

6 Wadi Ali Bridge Dei Al Zour 150 ML _ 100% 713,200

Constructing the last bridge to link the Syrian Railways to the Iraqi Railways150 Ml / 6 spans, prestressed girders. 11000m3 concrete based on 4000 Ml pile depth 35 Ml & 100000m3 excavations.

7 Al Na'na' Parking Damascus 10000 sqm _ 100% 3,200,000Structural and Architectural Works10000m2 / 5 floors, 1 under ground and4 above ground parking / 350 cars .

8 Air Planes Parking Aprons Damascus 300000 sqm _ 100% 7,460,000excavation and backfilling from chosen soils in addition to levelling ,compacting, anti-herbal treatment and concrete pavement works

Industrial and Infrastructure Projects

FINAL

Project and LocationClient

Execution Period Performance Percentage

• SteelMeltingFactory-AdraIndustrial Area• SMIGroup

• 360Day• 90%

Steel Melting Factory

FINAL

1- A.S.P2- W.T.P (Water Treatment Plant)

4- LPG5- Workshop6- Substation

7- F.T.P8- Ferroalloy9- Scrap Yard

10- E.A.F11- C.C.M (Continous Cast Machine)

12- Slag Area

PROJECT BLOCKS

FINAL

Steel Scrap WarehousesProject and Location

Work Description Administrationbuilding+warehousessetonatotalClient • SMIGroup

spaceof68000sq.mExecution Period • 360DayPerformance Percentage • 100%

Steel Scrap Warehouses Project - Adra Industrial Area

FINAL

MEP, Architectural, structural works - Turn key project

Project and LocationClientWork Description

Execution Period

Performance Percentage

SHAM PRINTSham Print - Adra Industrial Area

Hamsho International Group

three months and half

50 %

FINAL

Mowaslat Sq ParkingProject and Location • MowaslatSq.Parking-AlHamra'-DamascusClient • DamascusGovernorateWork Description • Structural,Architectural,Electrical,Mechanical,

andControlingWorks/4floorsundergroundparking13500m2/500cars

Execution Period • 1290DayPerformance Percentage • 100%

FINAL

Project and LocationClientWork Description

Execution Period

• CarsTestlanes-AllSyrianProvinces• MinistryofTransportation• Supply,install,andcommissioningelectro-mech.equipmentsfortestingbigandsmallcars.13hangerswith2testlaneseach.• 210Day

Cars Test lanes

FINAL

Project and LocationClientWork Description

Execution Period

• WadiAliBridge-AlBouKamalCity-Iraqi Boarders• SyriaRailWayEst.• 150l.m/6spans,prestressgirders.11000m3concretebasedon4000l.mpilesdepth35l.m&100000m3excavations.• 360Day

Wadi Ali Bridge

FINAL

Project and LocationClientWork Description

Execution Period

• AlNa'na'Parking-Baramekah-Damascus• DamascusGovernorate• StructuralandArchitecturalWorks10000m2/5floors,1undergroundand4abovegroundparking/350cars.• 1080Day

Al Na'na' Parking

FINAL

Airplanes Parking ApronsProject and Location • AirplanesParkingAprons-DamascusAirportClient • GeneralAssociationforCivilAviationWork Description • Excavationandbackfillingfromchoosensoilsin

treatmentandconcretepavementworks.Execution Period • 550DayPerformance Percentage • 100%

additiontoleveling,compacting,anti-herbal

REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATEContract Value

(USD)GLIMPSE ABOUT THE PROJECT

1Al Doha City

Doha Mall - Hotel - Villas - ResortsDamascus 118900 sqm 400000 sqm 50% 30,000,000.00

International Construction & Building Co.Civil, Architectural, Electrical, and Mechanical

Works / Villas, Apartments, and Commercial Mall

2 Al Salam Mall Damascus 30200 sqm 65000 sqm 80% 14,670,000.00Study and design and installation of new public

lighting, cabling, earthing, and controlling of high-tech designe.

Malls Projects

FINAL

Project and LocationClientWork Description

Execution PeriodPerformance Percentage

• DawhaCity-Damascus• InternationalConstruction&BuildingCo.• Civil,Architectural,Electrical,andMechanicalWorks/Villas,Apartments,andCommercialMallTurnKey• 900Day• 50%

Dawha City

REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATEContract Value

(USD)GLIMPSE ABOUT THE PROJECT

1 Rehabilitation & Development of Omayyad Sq. Damascus N/A N/A 100% 6,300,000

Execution of beautifying, renovating, Civill,Mechanical, Electrical, and Tanks for deposition, Balancing / filtering. maintenance, Inspecting, and servicesAgricultural Works with best europian lighting devices / Under ground Rooms for pumps, computers, control panels

2Rehabilitation & Development of Conference

PalaceDamascus N/A N/A 100% 5,775,000

Reconstruction, Renovating The Periphery of the Palace in addition to supplying mechanical and electrical equipments. Water Fountain / Squares / Lightening / Pavements by using luxury materials.

3 Al Jalaa Park Damascus N/A N/A 100% 140,000Study and design and installation of new public lighting, cabling, earthing, and controlling of high-tech designe.

4 Al Manshiya Park Damascus N/A N/A 100% 180,000Study and design and installation of new public lighting, cabling, earthing, and controlling of high-tech designs.

5 Al Samaka Park Damascus N/A N/A 100% 159,000Study and design and installation of new public lighting, cabling, earthing, and controlling of high-tech designs.

Rehabilitation & Development Projects

FINAL

Project and LocationClientWork Description

Execution Period

• BeautifyingOmayadSq.-Damascus• DamascusGovernorate• Executionofbeautifying,renovating,Civill,Mechanical,Electrical,and

AgriculturalWorksbesteuropianlightingdevices/UndergroundTanksfordeposition,Balancing/filtering.Roomsforpumps,computers,controlpanalsmaintenance,Inspecting,andservices• 90Day

Rehabilitation & Development of Omayyad Square

FINAL

58

Project and LocationClientWork Description

Execution Period

• ReconstructionforConventionsPalacePeriphery-AirportRoad• DamascusGovernorate• Reconstruction,RenovatingThePeripheryofthePalacein

additiontosupplyingmechanicalandelectricalequipments.WaterFountain/Squares/Lightening/Pavementsbyusingluxurymaterials.• 150Day

Rehabilitation & Development of Conferences Palace

FINAL

60

Project and LocationClientWork Description

Execution Period

• AlJalaaPark-Damascus• DamascusGovernorate• Studyanddesignandinstallationofnewpubliclighting,cabling,earthing,andcontrollingofhigh-techdesigne.• 60Day

Al Jalaa Park

FINAL

62

Project and LocationClientWork Description

Execution Period

• AlManshiyaPark-Damascus• DamascusGovernorate• Studyanddesignandinstallationofnewpubliclighting,cabling,earthing,andcontrollingofhigh-techdesigne.• 60Day

Al Manshiya Park

FINAL

Project and LocationClientWork Description

Execution Period

• AlSamakaPark-Damascus• DamascusGovernorate• Studyanddesignandinstallationofnewpubliclighting,cabling,earthing,andcontrollingofhigh-techdesigne.• 60Day

Al Samaka Park

REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION

RATEContract Value

(USD)GLIMPSE ABOUT THE PROJECT

1 Dental Institute Hama 15000 sqm 25000 sqm 45% 4,656,754

construction and architectural works, turn key, auditoriumaccomodates 300 persons - 5 halls, Labs,service library and a dome

2 Social Care Institute Damascus 23200 sqm 40000 sqm 60 % 6,980,000 turn key, construction and architectural works

3 Computer Science Institute Damascus 14000 sqm 27000 sqm 50% 5,297,1206 floors +a basement, construction and architectural works, accomodates for 4000 students

4Skeleton works execution for the Engineering

Bldgat Al Kalamoun University

Damascus Countryside

15800 sqm _ 50% 1,300,000 Skeleton works only - 4 floors

5 Administrative Works Institute Homs 21000 sqm 35000 sqm 50% 9,500,0005 floors +a basement, construction and architectural works, turn key

6Constructing and finishing the commercial

and the secretariat institute Damascus 10500 sqm 31000 sqm 50% 4,000,000

6 floors , construction and architectural works, along with 40000 sqm site works

Educational Bldgs Projects

FINAL

Project and LocationClientWork Description

Execution Period Performance Percentage

• DentalInstitute-Hama• MinistryofHighEducation• StructuralandArchitecturalWorks/Turnkey/15000sq.m/stadiumfor300Per./5halls/Labs/Library/andbasementforservices.• 730Day• 45%

Dental Institute

FINAL

66

Project and LocationClientWork Description

Execution Period Performance Percentage

• SocialCareInstitute-Damascus• Ministryofwork&SocialAffairs• StructuralandArchitecturalWorksTurnKeyProject/23200m2• 720Day• 60%

Social Care Institute

FINAL

Computer Science InstituteProject and Location • ComputerScienceInstitute-DamascusClient • MinistryofHighEducationWork Description • StructuralandArchitecturalWorks

TurnKey/14000m2/1Basement6Floors/Capacityfor4000Student

Execution Period • 720DayPerformance Percentage • 95%

FINAL

52

Project and LocationClientWork Description

Execution Period

• CivilEngineeringBuilding-DamascusRural• QalamonUniversity• ConstructionWorksonly15800m2/4Floors• 100Day

Civil Engineering Building

FINAL

Project and LocationClientWork Description

Execution Period

• Commercial&SecretaryInstitute-Damascus• MinistryofHighEducation• StructuralandArchitecturalWorksTurnKey/12500m2/5Floors10500m2/6Floors• 1000Day

Commercial & Secretary Institute

REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATEContract Value

(USD)GLIMPSE ABOUT THE PROJECT

1 Civil Affairs Governorate Homs 8000 sqm 12000 sqm 80% 2,210,000.00civil, electrical, mechanical, architectural and

construction works - turn key

2 Civil Affairs Governorate Dar'a 5000 sqm 9500 sqm 45% 1,557,608.006 furnished floors +a basement, construction

and architectural works, turn key

3 Operations Bldg at Al Basel Hospital Damascus 11000 sqm _ 65% 11,900,000.00Operations Bldg at Al Basel Hospital - Dummar -

Damascus along with medical equipment

4 Patriot Block Building Damascus 2400 sqm 3000 sqm 100% 5,200.004 floors +2 underground floors, construction

and architectural works, Garage and other services

5constructing and finishing

Aleppo Transport Governorate Bldg Aleppo 12500 sqm 40200 sqm 100% 3,460,000.00

5 floors, floor area 12500 sqm, turn key, construction and architectural works as well as

40000 sqm of site works

7 Al Qunaytra Finance Governorate Qunaytra 6850 sqm 13880 sqm 100% 2,340,000.006 floors, construction and architectural works,

turn key

Governmental Bldgs Projects

FINAL

74

Project and LocationClientWork Description

Execution Period Performance Percentage

• CivilAffairs -Homs• MinistryOf• StructuralandArchitecturalWorksTurnKey/5000sq.mOnebasementand4furnishedfloors.• 420Day• 80%

InteriorAdministration

Civil Affairs Administration

Administration

Civil Affairs Administration

FINAL

Project and LocationClientWork Description

Execution PeriodPerformance Percentage

• CivilAffairs -Daraa• MinistryOfInteriol• Civil,Architectural,Electrical,andMechanicalWorks/TurnKey• 540Day• 45%

FINAL

68

Project and LocationClientWork Description

Execution PeriodPerformance Percentage

• AlBaselHospitalOperationsBuilding-Domar-Damascus• MinistryofHealth• StructuralandArchitecturalWorksTurnKeyProjectWithSupplyingMedicalInstrument.• 1080Day• 65%

Al Basel Hospital Operations Building

FINAL

54

Project and LocationClientWork Description

Execution Period

• PatriotBloc.Building-AlRawdha-Damascus• PresidencyAttainMinistry• StructuralandArchitecturalWorksTurnKey/7150m22 /4Floor• 540Day

Patriot Bloc. Building

Basements

FINAL

Project and LocationClientWork Description

Execution Period

• TransportationAdministration-AleppoCity• MinistryofTransportation• StructuralandArchitecturalWorksTurnKey/12500m2/5Floors4000sq.msiteworks.• 1100Day

Transportation Administration

FINAL

48

Project and LocationClientWork Description

Execution Period

• FinancialAdministrationBuilding-QunaitrahCity• MinistryofFinance• StructuralandArchitecturalWorksTurnKey/6850m2/6floors.• 1020Day

Financial Administration Building

REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATE Contract Value GLIMPSE ABOUT THE PROJECT

3Resdential Bldgs at Al Yarmouk + commercial

marketsDamascus 51000 sqm 75500 sqm Completed 5,800,000

turn key projectconstruction and architectural works - 360 residential units - 2 commercial markets 2000 sqm

5 University Residences Homs 13000 sqm 3500 sqm Completed 2,210,0002 towers/ 12 floors (for each tower) construction and architectural works, turn key

4 Resdential Bldgs at Al Barzeh Damascus 20800 sqm _ Completed 4,700,000

2 towers/ 12 floors / 144 apartments (for each tower) construction and architectural works, turn key project

1New Residences - Jadidah Artouz -

phase 1 - 1253 residential unitDamascus 188000 sqm 125000 sqm Completed 83,533,000

Turn Key project including all the architectural and construction works

2New Residences - Jadidah Artouz - phase 2

(advanced) - 2200 residential unit Damascus 330000 sqm 175000 sqm Completed 146,670,000Turn Key project including all the architectural and construction works

Residential Bldgs Projects

FINAL

Project and LocationClientWork Description

Execution Period

• ResidencesBuildings-Alyarmouk-Damascus• DamascusGovernorate• StructuralandArchitecturalWorksTurnKey/24Buildings/4Flooreach51000m2/360Apartment.• 720Day

Residences Buildings

FINAL

The begining was since 1983…

• All our real estates are void from checks and claims on the cadastre and are sectioned into partitions and then authorized in order to erect buildings on them.• Buildings are constructed together with their complete overall facilities up to a high quality standard, exactness and aestheticism.• We perform public services

pavements, asphalts and street lighting. - Finishing unification and standardization through overlaying the four frontages of each building with granite or natural stone, fitting and assembling stairs and walls marble, as well as a wooden front door and balcony banisters and ceiling lights, all form unified to all built partitions.• We carry out the registry of all built partitions at the Real Estate Directorates then, buildings are finally allotted to buyers.

And we still carry on …

Real Estate Dept.

- Non portable water lines, potable water, electricity and telephone networks as well as

FINAL

FINAL

University ResidencesProject and Location • UniversityResidences-HomsCityClient • MinistryofHighEducationWork Description • StructuralandArchitecturalWorks

TurnKey/13000sq.m2Towers/12Floorseach.

Execution Period • 945DayPerformance Percentage • 95%

FINAL

Project and LocationClientWork Description

Execution Period

• BarzehTowers-Damascus• DamascusGovernorate• StructuralandArchitecturalWorks/TurnKey/20800m2/Towers12Floorseach/144Apartment.• 820Day

Barzeh Towers

REF PROJECT NAME Location BLDG AREA LAND AREA COMPLETION RATEContract Value

(USD)GLIMPSE ABOUT THE PROJECT

1 Reinforcement works for Marabaa Hangar Damascus _ N/A 100% 400,000 soil shoring works by using nails and shotcrete system

2 Reinforcement works for Ghardenia Hotel Homs 8000sqm N/A 100% 2,800,000Soil Shoring Works by using nails and Shotcrete system at depth of 18 metres

3shoring and constructing retaining walls

at Dummar, Island 4Damascus _ N/A 100% 350,000

Constructing a retaining wall of 17 metres height with concrete piles no 52, dim 90 cm through using nails and shotcrete system

Reinforcement and renovation Projects

FINAL

82

Project and Location

Work Description

Execution Period

• ReinforcementWorksforMarabaaHanger

• SoilShoringWorksbyusingnailsandShotcretesystem• 90Day

Reinforcement Works for Marabaa Hangar

Client • InternationalHamshoGroup

FINAL

Project and LocationClientWork Description

Execution Period

• ReinforcementWorksforGardeniaHotel-Homs• AlGadriniaRealEstateInvestmentCompany• SoilShoringWorksbyusingnailsandShotcretesystem8000sqm,Depth18m• 120Day

Reinforcement Works for Gardenia Hotel

FINAL

Project and LocationClientWork Description

Execution Period

• RetainingWall-Domar-Damascus• DamascusGovernorate• Retainingwall/hight17mbyusingnailsandshotcretesystem.• 45Day

Retaining Wall In Domar

FINAL

Ready Mixed Concrete Dept.

SINCE 1983

FINAL

84

FINAL

It is a division for producing all types of mixed concrete with its all forms (normal, resistant, cast….etc) and cement products (edges, tiles, bricks and interlock) which we produce automatically.Khayyat Contracting & Trading has established several mixing plants throughout Damascus and Damascus countryside besides the movable ones in order to provide the demands of its projects and to provide a part of the local market demands. Moreover, these weighted mixing plants are equipped with the latest technologies and automated systems by computer which meet the highest international quality standards and with total production capacity exceeded 3800 m3/day. This division is also equipped with wide range of modern and developed machines which ensure the proper work flow without any hindrance, delay or without any delay towards the customers under all circumstances and at all sites. It also includes the capability to meet the demands in quantities without delay.

Since the evolution of this division and in order to satisfy customers and maintain their great confidence in the Establishment, Khayyat Contracting & Trading has established a laboratory to control and monitor quality. This laboratory was equipped with the latest international test equipments of high reliability. These tests include:

• Test the granules grades of supplies through screens ASTM C136.• Test measurement and chemical analysis for very fine substances and which pass through

screens (200) micron 75- C117 ASTMN.• Test the qualitative weight and pebbles and sand absorption ASTM C127/C128.• Chemical tests to define impurities in sand ASTM C40.• Los Angles Test to define pebbles resistance (anti-collision).

The laboratory controls quality also by designing concrete mixtures through the most modern programs in this regard and it compares it to the reality. The laboratory monitors mixtures produced daily through some field tests and other internal laboratorial ones regularly and continuously. The most important advantages to deal with "Mixed Concrete and Cement Product" Division in Khayyat Contracting & Trading are:

1- Accurate appointments schedule strictly applied as the company ensure an administrative system and excellent organizational structure in addition to several vehicles and three mixing machines distributed around Damascus to allow it to regulate long and accurate appointments schedules without any problems or delay in delivery date and casting.

2- Excellent quality for the mixed concrete for several reasons; most importantly:

-All permitted materials are of all types of sand, granules and cement types, which is excellent raw materials as the company adopts high standards to buy these materials, even if it is from remote sources and with additional cost for transport and loading because the aim is to have best quality types and brands to realize the best quality of mixed concrete in addition to a set of additives to the mixtures to give it high and excellent resistance as per the minimum limit of the Syrian Arab code.

Ready Mixed Concrete

FINAL

86

Mixing plant addressMixing plant description

Capacity

Damascus countryside, industrial area – Adraa

Weight mixing plant automated by computer 2006

100 m3 / h

Sahnaya – Daraa highwayWeight mixing plant automated

by computer 2008150 m3 / h

Movable mixing plants to be installed at projects wherever

Installation within 24 hours ----

-Professional technical team with high competence and experience in this field, starting from the technicians in charge to mix the materials to the laboratory staff who test these materials and to trained drivers and supervising engineers. 3- Very competitive price compared to the quality of the concrete.

4- Extreme care for customers in terms of the after sale service.

5- Possibility to install movable mixing plants at casting sites within 24 hours only. Mixing plants sites of Khayyat Contracting & Trading

FINAL

90

Machinery & Reinforcement Dept.

SINCE 1983

FINAL

FINAL

92

FINAL

Specialized in performing all works of reinforcement, excavation and transportation relative to the establishment projects or the common and/or private sector projects through offering the following services:• Execution of concrete wedge works up to various depths and dimensions by the use of international class most modern wedge borer machines and all related technical accessories.• Carrying out soil lateral reinforcement by using horizontal stud technology with injected concrete or by concrete wedges with horizontal tensors.• Implementing boring works of all types and dimensions.• Effectuating transport works.• welcoming various engineering works.

Machinery & Reinforcement Dept.

1Six Wheel Tipping Lorry, capacity 20 m3, made by Mercedes Benz - Germany

5

2 Truck Towing Head, Six wheel Tipper, capacity 20m3, made by Kamaz 5

3 Wheel Loader 950 Caterpillar 7

4 Wheel Loader 4500, Volvo 4

5 Wheel Loader L 90, Volvo 4

6 Wheel Loader 980, Caterpillar 1

7 Jack Hammer with Air Compressor, Atlas Capco, 10 cylinders, pressure 23 bar, with two impellers

4

8 Electric Generating Set, 60KVA 20

9 Telescopic Crane, 50 tons capacity, made by Kobelco of Japan 1

10Tower Crane, length 44m, full automatic control, with lifting capacity 3.5 tons, jib 75m, made by Liebher - Germany

5

11 Welding Machines, MOSA Italy, with Electric Generating ,10 KVA 10

12 Welding Machines, 999 ,Chaina, 375 Am. 35

13 Electronic Total satation 30

14 Auto Level 60

15 concrete vibrators 150

Project Dept Machinery & Equipment List

1 Concrete Batching Plant, capacity 100m3, made by MEKA - Turkey, located in Addra.

1

2 Concrete Batching Plant,(Mobil system) capacity 100m3, made by MEKA - Turkey, located inYaafor

1

3 Concrete Batching Plant, capacity 120m3, made by B Makena - Turkey, located in Sahnaya.

1

4 Concrete Batching Plant, capacity 200m3, made by B Makena - Turkey, located inTartos city

1

5 Truck Mounted - Mercedes - concrete pump - Schwing. 1

6 Truck Mounted - Daewoo - concrete pump - Putzmeister. 1

7 Concrete Pump,whetzinger mounted on mercedes truk length 37m 2

8 Concrete Pump,,shwing mounted on mercedes truk length 28m 1

9 Concrete Pump, ,pustmister mounted on mercedes truk length 32m 1

10 Concrete Pump, hanwoo mounted on daewoo length 48m 1

11 Concrete Pump, hanwoo mounted onDaewoo length 58m 1

12 Truck Mixer, capacity 8.5m3, made by Kamaz. 17

Ready Mix Concret Dept Machinery & Equipment List

13 Truck Mixer, capacity 9.5m3, made by Kamaz. 12

14 Truck Mixer, capacity 10m3, made by Akor - Mercedes 14

15 Truck Mixer, capacity 12m3, made byActros - Mercedes 3

16 Laboratory Equipment for Batching Plant 1

17 Laboratory Equipment for Batching Plant z

18 Laboratory Equipment for Batching Plant 1

19 Laboratory Equipment for Batching Plant 1

20 Cement Silo, capacity 100 tons each. 4

21 Towing Heads, made by Kamaz. 5

22 Towing Heads, made by Scania. 4

23 Electric Generating Set, Noiseless, 300KVA, Assembled by CTM - Italy 12

24 Air compressor, Atlas Capco, 4 cylinders 11

25 Welding Machines For all type of steel,999 China, ACDC ,260 AM. 5

1Drilling Rig, Rotary, drilling depth up to 43m and diameter of 1.5m, with metallic sleeves, and all necessary equipment, made by Gasagrandi - Italy

5

2Hydraulic Vibrators for lowering sleeves of 110cm diameter, made by Gasagrandi - Italy

2

3Hydraulic Vibrators for lowering sleeves of 200cm diameter, made by Gasagrandi - Italy

1

4 All equipments for testing of wedges (piles) through Tensile Force. 1

5Hydraulic Pump for aerating the vibrator, pressure 400 bar with Deutz diesel engine of 6 cylinders.

1

6 Injection Machine, pressure of 200 bar, Hani 151 - Switzerland 1

7 Concrete Shooting Machine, Aliva (Sika) 146 - Switzerland 4

8 Horizontal drilling Tensiles Machine, made by Gasagrandgi - Italy 2

9Drilling Rig, Rotary, drilling depth up to 43m and diameter of 1.5m, with metallic sleeves, and all necessary equipment, made by Sany - China

1

10 Dewatering pump 50

Foundation and Pilling DeptMachinery & Equipment List

1 Bulldozer D9, Caterpillar 3

2 Crawler Loader 977, Caterpillar 2

3 Water Tank Wagon 2

4 Rollers, 8 tons, Dynapac 4

5 Grader, Caterpillar 1

6 Agricultural Tractor 11

7 Loader, capacity 70 tons, made by Mercedes 8

8 Excavator - Poclain C170 - France 2

Roads and Infra Dept Machinery & Equipment List

1 AUDI S08 12 H.VERNA 13 LADA 14 SHANA 15 KIA RIO 26 AVANTI 17 KIA PICANTO 38 SUZUKY 19 PEUGOT 206 1

10 RENAULT KANGO 211 KIA MORNING 512 KIA 113 H.VAN 414 HYUNDAI 1

Service Cars Machinery & Equipment List

FINAL

Global Trade & Supplying Dept.

SINCE 1983

FINAL

96

This dept is specialized in global trading and supplying around the world, we import all equipment and technology from manufacturers to employer.

Our mission is to make quality products available to client at reasonable price and on time, our aim is to cater the needs of the client with adequate support of premier technical and management services in a highly responsible manner.

We are welcoming in any company and manufacturer to be our partner in our successful business.

Global Trade & Supplying Dept.

FINAL

Quality & Safety Philosophy

SINCE 1983

FINALThrough built-in monitoring and implementation procedures, KCT is commitied to

delivering a quality construction projects and final product. The procedures begin during the pre-construction phase with budgeting, value engineering services, and subcontractor selection. The Quality Control proceduers togather through a concentrated effort of teamwork involving KCT Estimators, Project Manager, Safety Director, and field staff to deliver the Client a successful project.At KCT, safety is a prime concern. Our full-time Safety Director visits each individual project site, performs regular staff training and networks with other to insure safe working conditions are being maintained.Weekly safety meetings are held on each project site to stress the importance of jobsite safety and to keep safety in the minds of each individual working on the site.

At KCT, we are always improving...

Quality & Safety Philosophy

FINAL

KCT executes diverse construction projects and has a reputation of being one of the best construction companies, who successfully complete all projects in the shortest time possible.

Our qualified & committed project management team, adequate manpower and sophisticated machinery contribute to our success and continued grwoth.

Our specialization enables us to deliver beyond expectations in markets where technical proficiency is a necessity.

We constantly upgrade our processes and adopt new technologies to retain our competitive edge and maintain our position as market leader in the construction field.

Why KCT ?

FINAL

Contacts Info.

Damascus Rural - SyriaP.O.BOX : 206Tel : +963 11 622 49 96 +963 11 621 61 79 +963 11 621 70 21Mobile : +963 955 88 88 80Fax : +963 11 621 55 79e-mail: info@khayyat-sy.com

Damascus Rural - SyriaP.O.BOX : 13404Fax: +963 11 214 48 45Tel : +963 11 214 55 77 +963 11 214 6002 +963 11 214 6003Mob.+963 949 99 99 96 +963 949 99 99 97info-rmc@khayyat-sy.com

www.khayyat-sy.com

Recommended