Bangladesh Infrastructure Finance Fund Limited
4 Anjuman Mufidullslam Road, Kakrail Dhaka-1000-
Statement on Green Banking as of 30/06/2015 (Quarter 2)
(
1.1· ··~"·Polic,iFormulationand Governance ,.- '--~-', '-:~' .;;f~,*:;i~~.:~~:~~:,, ~;ffoiK '...
Yes No Remarks
Green Banking Policy has been adopted in the 19th Board
Formulation and Board! Regional Head approval of Green Banking V Meeting of BIFFL, held in 14th September 2014. The
1.1.1 Policy Policy has been submitted with the 2014 Q3 Report.
Quarter 1 Quarter 2 Quarter 3 Quarter 4 Total Remarks
1.1.2 Allocation of Fund in the Budget for Green Banking (in million Taka) 0 0 0.25 100.75 101 BIFFL has
Green Finance 0 0 0 100 100 devised its
Climate Risk Fund 0 0 0.25 0.25 0.5budget for 2nd
Marketing, Training and Capacity Building 0 0 0 0.5 0.5half of 2015.
Quarter 1 Quarter 2 Quarter 3 Quarter 4 Total Remarks
1.1.3 Utilization of Funds (in million Taka) 6.007 0 0 0 6.007
Green Finance 6 0 0 0 6-
Climate Risk Fund 0 0 0 0 0
Marketing, Training and Capacity Building 0.007 0.0075 0 0 0.0145
Composition (Name,
Yes No Designation 8, Deptt.) Remarks
Convener: Mohammad
Sagir Hossain Khan,
General Manager
(Investment); Members:
1) Mohammad Shahidul
Islam, Manager (Credit); Unit is formed under the
2) Sheikh Anowar Sadat, Green Banking Policy,
Assistant Manager approved by 19th Board
V(Credit); 3) Shafiqul Islam Meeting of BIFFL, held in 14th
Prodhan, Senior Officer September 2014. The
(Credit-Technical); 4) required Office Order was
Rabeya Rahman, Officer circulated in 21 st September
(Accounts & Finance), 5) 2014.
Md. Mohabul Alam, Officer
(IT), Member-Secretary:
Md. Saddam Hossain,
Officer (Renewable
1.1.4 Formation of Green Banking Unit Energy)
(Inco oration of Environmental Risk in Core Risks Mana
INO of Projects applicable for Environmental Due Dilligence (EDD)..
No. of Projects Rated (Environmental Risk Rating) 1 0 0 0 1 -
1.2.2Low 0 0 0 0 0 -Moderate 0 0 0 0 0 -
High 1 0 0 0 1 -
Total Number 1 0 0 0 1
Low 0 0 0 0 0
Moderate 1 0 0 0 1
High 0 0 0 0 0
Total Amount Disbursed (in0 BIFFL has
million Taka) 6 0 0 6disbursed 1
1.2.3 Rated Projects financed Low 0 0 0 0 0 loan facility inModerate 6 0 0 0 6
Q1.High 0 0 0 0 0
Loan classification as of Quarter End
UC (standard) SMA SS OF BL
No. of projects
Amount(in million taka) N/A
1 o o 2
(
1.3:'. Initiatina In-house Environment Manaaement i\ti" t ~.<,~~;,'" ;... .'
Quarter 1 Quarter 2 Quarter 3 Quarter 4 Total Remarks
No. of Branches and Booths (Data in each quarter will reflect theBIFFL has no
1.3.1 cumulative figure) 0 0 0 0 0branches
No. of Branches powered by Solar Energy (Data in each quarter willexcept for its
1.3.2 reflect the cumulative figure) 0 0 0 0 0Corporate
No. of Booths powered by Solar Energy (Data in each quarter willHead Office.
1.3.3 reflect the cumulative figure) 0 0 0 0 0
Yes No Remarks
Green Office Guide has been adopted in the 19th Board Meeting
V of BIFFL, held in 14th September 2014. The Final Policy has
1.3.4 Introduction of Green Office Guide or General Instructions been submitted with the 2014 03 Report.
1. Save energy by introducing green desiqn, using green equipment, ensuring green lighting and
practising green transport. 2. Save water by introducing water saving practices among
employees. 3. Save paper by practising green printing and introducing tech-based green
1.3.5 Pin Points of Green Office Guide or General Instructions communication. 4. Reduce wastage by reducing misuse of utilities and ensuring proper disposal.
5. Practising fuel and energy efficient equipment procurement. 6. Raise awareness among
employees and customers by circulating more relevant information among them. 7, Practising 3R
Reduce, Re-use and Recycle - within the organization.
1.3.6 Inventorv Details Quarter 1 Quarter 2 Quarter 3 Quarter 4 Total Remarks
Consumption of Water (in Taka).
41,724.00 55,753.00 0.00 0.00 97,477.00 -Consumption of Paper (in Taka) 1,840.00 6,981.00 0.00 0.00 8,821.00 -
IElectricity 42,078.00 138,976.00 0.00 0.00 181,054.00 -
(
Energy Consumption (in Taka) Gas 89,227.00 121,746.00 0.00 0.00 210,973.00
11.3.7 IOthers (Please Specify)
Fuel 57,546.00 43,933.00 0.00 0.00 101,479.00
(
(
·4 Introducm Green Finance
Amount in million Taka
Quarter 1 Quarter 2 Quarter 3 Quarter 4 Total Remarks
Number Amount Number Amoun Number Amount Number Amount Number
o 0 0000 0 0 0
oFor Installation of ETP (Amount Disbursed) o
1.6 Introducin Green Marketin
1.6.1
ETP
o 0 00 00 0 0
Amount
Introduction of Green Banking
Products (Please Specify)
Green Finance at reduced rate of interest 0 0 0 0 0 0 0 o o
o
IBio-gas Plant I 01 01 0c::::::9l~=01 01L...=~01=:::::;01~===0~1 ==:::;01 BIFFL has;:::==================~==*==~==.......... disbursed 1ISolar Panel!Renewable Energy Plant I 01 01 ol::::§] oc::§] 01 01 01 01term loan to a
~=========================I I I r--;J ~ I I I I Zigzag BrickI~B=io=-~=e=rt=ili=z=er=p=l=a=nt================ 0 0 OL.......£i OL.......£J 0 0 0 0 Kiln Project.
:::!HY::b:::::rid=H=off=m=an=K=iln=(H=H=K:::)===============1 01 01=~0c:::::§] 01 01 01 01 01 01
IOthers (Please specify) I 11 61 oc:::::§] oc::§] 01 01 11 61
Projects financed having ETP(Full amount
disbursed)
o
r1.S Utilization of Climate Risk Fund '";~
;: ,'1;
Quarter 1 Quarter 2 Quarter 3 Quarter 4 Total Remarks
11.51IFund for part of CSR activities (Event) related to
Climate Change (in million Taka) 0 0 0.25 0.25 0.5 -
11.5.2IFund for part of CSR activities (Project) related to
Climate Change (in million Taka) 0 0 0 0 0 -
BIFFL is working with its peers and stakeholders to position itself in the market to hunt Green Projects. Primarily direct
communication with potential customers are key focus. If felt necessary then BIFFL will go for large-scale marketing.
1.7 .EmoloveeTrainino. Consumer Awareness and Green Event
Quarter1
1.7.1
Quarter2 Quarter3
o
Quarter4
o
Total
2
No.of TrainingPrograms!Seminars!Workshops!
AwarenessProgramsexclusivelyconductedfor Green
Banking
1.7.2
o o
ooo
ooo
2No.of Participantscovered
o
1.7.3 GreenEvents(PleaseSpecify)
(
Employees
Customers
2
o o o o o
Remarks
(
Disclosurein
Annual Report -
Website -BIFFL is preparingfor more
Media - Green BankingActivities.Preparation of Independent Green Banking & Sustainability
Report -
~.1 Sector S ecific Environment Polic
Formulation of Sector Specific Environment Policy (UnderYes No Remarks
Phase 2) (If yes, please give the pin points in a separate
2.1.1 sheet) "The process has started. Hoped to be devised soon.
Name of the Sectors for which Specific Environment PolicyN/A
2.1.2 Formulated
Formulation of Green Strategic Planning (If yes, please
describe in a separate sheet) "
(Yes No Remarks
Formulation of Fls Specific Environment Risk Management BIFFL has devised its own enviornment risk management guideline
2.3.1 Plan and Guideline "named "Environmental Social Monitoring Framework" (ESMF).
~~a-n--
General Manager (Investments) & Green
Banking Unit Head
Md. Saddam Hossain
Officer (Renewable Energy), BIFFL
(
IIAnnexure-I
IProgess of Green Finance
Bangladesh Infrastructure Finance Fund Limited
I 30-Jun-15 I
Taka in million)
Total Loan Direct Green Indirect Green Toal Green Direct Green Finance
Disbursement Finance Finance Finance as % of Total Loan
(Funded) (Disbursement) (Disbursement) (Disbursement) Disbursement
0.00 0.00 0.00 0.00 #DIV/O!
Details of Green Finance
Renewable Energy
Amount (in million Amount (in million
Taka) Taka)
Setting up of Bio- Solar Home
gas Plant System
in existing Dairy
& poultry Farm 0.00 0.00
Integrated Cow Solar MicrolMini
Rearing Grid
and Setting up of
Bio-aas Plant 0.00 0.00
Organic Manure Solar Irrigation
Bio-gas from Slurrv 0.00 Pumping System 0.00
Mid Range Bio- Solar PV
I gas Plant 0.00 Assembly Plant 0.00
Biomass based Solar PV Plant
large scale Bio-gas capable to produce
Plant I MW or more
0.00Solar Energy
Power 0.00
Poultry & Dairy Solar Cooker
based large scale assembly Plant
Bio-gas Plant 0.00 Solar Cooker 0.00
Hydropower Solar Water
Hydro-Power (pico, Micro & Heater Assembly
Mini) 0.00 Plant 0.00
Wind- PowerWind Energy Solar Air Heater &
driven Power Cooling System
Plant 0.00 Assembly Plant 0.00
Solar Energy
Driven Cold
Storage
0.00
Surface Water
Purification Plant
using Solar Pump 0.00
I Ener :y Efficiency IAmount (in million Amount (in
Taka) million Taka )
Substitution of Energy efficient
Conventional Improved Cook
LimeKiln by Stove(lCS)IICS
Energy Efficient RenewablefHybrid
Kiln 0,00 Cook Stove 0,00
Substitution of LED Bulbrrube
Conventional Manufacturing Plant
lighting system,
electronic
material, Boiler
with energy
efficient
alternatives on the,
basis of Energy
Audit 0,00 0,00
Auto sensor power LED Bulbrrube
switch assembly Assembly Plant
Plant 0,00 0,00
I Solid Waste Management IAmount (in million Amount (in
Taka) million Taka)
Methane Recovery Auto sensor power
from Municipal switch assembly
waste & to Plant
produce Power
Municipal waste Hazardous waste
to Compost treatment facility
I Liquid Waste Management IAmount (in million Amount (in
Taka) million Taka )
Biological Waste Water
Effluent Treatment Plant
Treatment Plant 0,00 0,00
Biological Sewage Water
Effluent Treatment Plant
Treatment Plant 0,00 0,00
Conversion of
Chemical ETP to
Combination type
(Chemical+Biolog
ical) ofETP
0,00
I Alternative Enerzv IAmount (in million
Taka)
Production of
Burnable Oil from
waste Tire by the
Process of Pyrolysis
0,00
I Fire Burnt Brick IAmount (in million
Taka)
Setting up of
Hybrid Hoffman
Kiln(HHK)fTunnel
Kiln/equivalent
technology in Brick
manufacturing
Industry
0.00
I Non Fire Block Brick IAmount (in million ,
Taka)
Compressed Block-
Brick 0.00
Autoclaved Aerated
Concrete 0.00
I Recycling & Recyclable Product IAmount (in million Amount (in
Taka) million Taka )
Waste Paper Recyclable Poly
Recycling Plant Propylene Thread &
for production of Baggage
recycled paper Manufacturing Plant
0.00 0.00
Plastic Waste PET Bottle
Recycling Plant Recycling Plant
(PVC, PP, LOPE,
HDPE,PS)
0.00 0.00
Recyclable Solar Battery
Baggage Recycling Plant
Manufacturing
Plant 0.00 0.00
I Green Industry
Amount (in million
Taka)
I:stablishment ofGreen Industrv 0.00
I Safety and Security of Factory IAmount (in million
Taka)
Ensuring Work
Environment and
Security of Workers
of Textile and
Garments Industry •0.00
I Miscellaneous IAmount (in million
Taka)
[Vermicomnost 0.00
[Palm Oil Plant 0.00
I Others IAmount (in million
Taka)
IN/A 0.00
IN/A 0.00
IN/A 0.00
Recommended