View
3
Download
0
Category
Preview:
Citation preview
INDEX
Item Section Page
A
Abbreviations ............................................................... GP-1.04 2
Acceptance for Maintenance ....................................... GP-5.13 33
Accidents ...................................................................... GP-7.13 45
1 1
8
1
6
1
8
9
7
8
9
3 8
8
7
7
7
7 6 8 0 2 4 0 1
7
4
8
3
4
4
7
6
5
6
9
8
4
9
5
4
Acknowledgements ...................................................... GP-2.10 1Administration ............................................................. GP-1.03 Administration Furnished Materials ......................... GP-6.04 3Administrator ............................................................... GP-1.03 Admixtures for Portland Cement
Concrete Structures ................................................. 420.02.01, 902.06 307, 66Aerial Electric Lines (750 volts or more) ................... TC-6.08 11Aggregate Base Courses
Compaction ................................................................ 501.03.10 45Dust Control .............................................................. 501.03.12 45Equipment .................................................................. 501.03.01 45Grade or Finish Surface Control ................................ 501.03.09 45Maintenance ............................................................... 501.03.13 45Maintenance of Traffic .............................................. 105.01 19Protection and Curing ................................................ 501.03.11 45Spreading of Material ................................................ 501.03.08 45Subgrade Preparation ................................................. 501.03.03 45Transportation ............................................................ 501.03.07 45Weather ...................................................................... 501.03.02 45
AggregatesSlurry Seal ................................................................. 923.01 78Table 901 A ............................................................... 901 65Table 901 B ............................................................... 901 65Table 901 C ................................................................ 901 66Table 901 D ............................................................... 901 66
Aluminum Lighting Structures .................................. 808.01 63Aluminum Signs, Sheet or Extruded .......................... 813.01 64Amendments to Invitations for Bids ........................... GP-2.10 1Anchor Bolts and Assemblies
Bridges ....................................................................... 430.03.31 36 Noise Barriers............................................................. 455.03.02 43 Retaining Walls .......................................................... 450.03.02 42Annuals and Bulbs Installation and Establishment ... 711 60
Berming...................................................................... 710.03.10 59Edging ........................................................................ 710.03.11 59Establishment Phase ................................................... 711.03.17 60Fertilizing and Watering After Installation................. 710.03.14 59Installing .................................................................... 710.03.09, 711.03.10 593, 60Installation Phase Acceptance ................................... 711.03.16 60
IPM Program .............................................................. 710.03.02(d) 58Nutrient Management Plan ......................................... 710.03.01(e) 58
Payment Schedule ...................................................... 711.04.01(a) 60Planting Seasons ........................................................ 711.03.01(b) 60Preparing Planting Beds and Planting Areas ............. 710.03.05, 711.03.04 592, 60Submittals and Inspection .......................................... 711.03.02 60Utilities Marking, Layout and Inspection ................... 710.03.03 589
809
INDEX
Item Section Page
Application of Bridge/Structure Numbers ................. 495 453
Arrow Panel for Maintenance of Traffic ................... 104.07 159
Asphalt Binders, Performance Graded ..................... 904.01 683
2 3 0
7
4 9
4
6 4
2
7
3
5
3
9
1
1
2
2
4
4
9
5 2
0 5 3
1
5
5 3
1
1
0
8
1
4
4 3
1
6
4
Asphaltic Materials for Dampproofing and Waterproofing ......................................................... 913.01 72
Asphalt Sealer for Concrete Pipe ............................... 911.09 71Authority and Duties of Inspectors ............................ GP-5.07 3Authority of the Procurement Officer ....................... GP-5.01 2Award ........................................................................... GP-1.05 Award of Contract ...................................................... GP-3.01 1
B
Backer Rod for Concrete Pavement Joint Sealing ............................................................. 523.02 51
Backfill Flowable for Utility Cuts ........................................... 314 27Material for Trenches for Buried Cable ..................... 950.06 79Traffic Signals, Highway Lighting and Signs
Foundations ........................................................... 801.03.05 62Backfilling
Against Brick Masonry ............................................. 463.03.08 44Against Curb, Combination Curb and Gutter ............ 602.03.01(i) 52Against Gabion Edges ............................................... 313.03.05 27Against Structures ..................................................... 402.03.05 28Concrete Ditches ........................................................ 309.03.06 26Concrete Slope and Channel Protection ..................... 310.03.06 27Pipe Culverts ............................................................. 303.03.07 24Prefabricated Edge Drains.......................................... 307.03.04 25Riprap Ditches ........................................................... 311.03.04 27Slope and Channel Protection ................................... 312.03.05 27Structural Plate Pipe and Arches ................................ 304.03.05 24Underdrains, Subgrade Drains, and Spring Control ... 306.03.05 24
Barbed Wire for Chain Link Fence ........................... 914.05 72Barricades and Warning Signs ................................... GP-7.08 4Barricades Type I, II, and III for Maintenance
of Traffic .................................................................. 104.13 17Base Course Plants ...................................................... 915.04 73Bearings ........................................................................ 432, 440.03.21 370, 42
Elastomeric ............................................................... 432.03.04 37Finishing Bearing Seat Areas..................................... 420.03.07(c) 32
Materials .................................................................... 910 70Prestressed Concrete Beams and Slab Panels............. 440.03.21 42Steel, Bronze, or Copper ............................................ 432.03.03 37
Bearing Value of Piling ............................................... 410.03.09 29Bedding of Pipe Culverts ............................................ 303.03.02 24Benching for Embankments ....................................... 204.03.03 22Bids
Amendments to Invitations for .................................. GP-2.10 1Bond .......................................................................... GP-1.05 Bidder ........................................................................ GP-1.05 Confirmation of ......................................................... GP-2.14(b) 1Delivery of ................................................................ GP-2.08 1Evaluation and Award ............................................... GP-2.19 1Form .......................................................................... GP-1.05
810
INDEX
Item Section Page
Invitation for .............................................................. GP-1.05 5
Irrevocable ................................................................. GP-2.01 8
Late ............................................................................ GP-2.12 12
Mistakes in ................................................................. GP-2.14 13
Multiple or Alternate ................................................. GP-2.22 18
Opening and Recording of ......................................... GP-2.13 12
Preparation of ............................................................ GP-2.06, TC-2.02 9, 88
Protests ...................................................................... GP-2.23 18
Rejection of All ......................................................... GP-2.18 16
Samples and Descriptive Literature ........................... GP-2.06(c) 10
Schedule (Quantities in) ............................................. GP-2.03 8
Bioretention Soil Mix.................................................... 920.01.05 751
Blasting
Explosives .................................................................. TC-6.07 110
Removal of Existing Masonry ................................... 207.03.01 232
Rock ........................................................................... 201.03.04(b) 218
Bleeder Ditches ............................................................ 208.03.03 233
Board ............................................................................ GP-1.05 4
Bolts, Nuts, and Washers
General Use ............................................................... 909.06 705
High Strength ............................................................. 430.03.16, 909.07 360, 705
Bond for Brick Masonry ............................................. 463.03.01 445
Bond Requirements ..................................................... GP-3.03 20
Borrow Excavation
Beyond Specified Limits ........................................... 201.03.08 220
Borrow Pit Material ................................................... 203.03.02 225
Clearing and Grubbing ............................................... 203.03.01 225
Contractor's Options .................................................. 203.01.01 224
Types ......................................................................... 916.01 740
Breakaway Base Support Systems ............................. 821 648
Brick
Building ..................................................................... 903.03 682
Manhole ..................................................................... 903.02 682
Masonry ..................................................................... 463 445
Sewer ......................................................................... 903.01 682
Bridge Deck
Accessories in Slabs .................................................. 420.02.02 307
Curing of Concrete .................................................... 420.03.08 327
Forms ......................................................................... 420.03.02 308
Grade Control ............................................................ 420.03.04(c)(1) 315
Grooved Slab ............................................................. 420.03.07(d)(1) 326
Latex Modified Concrete Overlay ............................. 426 347
Lightweight Concrete ................................................ 425 345
Linseed Oil Protective Coating .................................. 420.03.12 330
Maintain Existing During Life of Contract (Patching) 401 279
Protective Shields for Removal ................................. 405.03.01 285
Rate of Concreting ..................................................... 420.03.04(c)(3) 316
Removal ..................................................................... 405.03.01 285
Repair ......................................................................... 426.03.02 350
Replacement .............................................................. 405.03.02 286
Sidewalks and Safety Curbs ...................................... 420.03.07(e) 326
Slab Tolerances .......................................................... 420.03.07(d)(2) 326
Bridge Hauling 0ver Proposed Structures .................. TC-6.13 114
Bridge Mounted Sign Supports .................................. 433 372
Bridge Removal ............................................................ 405.03.03 286
811
http:GP-2.06
INDEX
Item Section Page
Bridge Storing Material and Equipment On/Against
Structures Restriction .............................................. TC-6.14 115
Bridge Underclearance ............................................... TC-6.12 113Bridge Underpass Luminaires .................................... 806.03.02 628Bronze or Copper Alloy Bearing and Expansion
Plates ........................................................................ 910.01 705Brown Polyester Coated Traffic Barrier ................... 605.03.04 531Brush Removal ............................................................. 713 612 Damage Repair........................................................... 713.03.10 613 Marking...................................................................... 713.03.04 613
Permits ....................................................................... 713.03.01(a) 612 Operations .................................................................. 713.03.07 613
Tree Preservation Program......................................... 713.03.01(b) 612Buildings, Existing, Removal and Disposal ............... 102.03 140
Burning ........................................................................ 101.03.07(a) 139Business ........................................................................ GP-1.05 4Buy American Steel Act .............................................. GP-7.28 52
C
Cable Connectors and Connector Kits ................................. 810.03.08 637
Direct Burial .............................................................. 810.03.01 636
Duct ........................................................................... 810.03.03 636
In Conduit ................................................................. 810.03.02 636
In Lighting Structures ................................................ 810.03.04 637
Caissons......................................................................... See Drilled Shafts
Calcium Chloride ........................................................ 501.03.12, 921.02.01 459, 781
Calendar Day ............................................................... GP-1.05 4
Cancellation of Invitation for Bids ............................. GP-2.16 15Caps, Wales, and Planks, Timber Protection ............ 462.03.05 443
Cast Washers ............................................................... 909.09 705Castings for Grates and Covers ................................. 305.03.02 246
Chain Link Fence ........................................................ 607, 914 536, 724
Change Order .............................................................. GP-1.05 4
Changes ........................................................................ GP-4.06 23
8
333
Character of Workmen, Methods and Equipment ... GP-8.06 5Chip Seal Surface Treatment
Aggregate Spread Rate .............................................. 503.02 46Asphalt Spray Rate .................................................... 503.02 46Equipment ................................................................. 503.03.01 46First Seal Coat ........................................................... 503.03.05 465
Foundation Preparation ............................................. 503.03.03 464
Prime Coat ................................................................. 503.03.04 465
Rolling ....................................................................... 503.03.06 465
Second Seal Coat ....................................................... 503.03.07 465
Traffic ........................................................................ 503.03.08 465
Weather ..................................................................... 503.03.02 464
Choice of Law .............................................................. GP-7.23 50Claims ........................................................................... GP-5.14 34Cleaning and Painting New Structural Steel
Abrasives.................................................................... 435.02.02 375
Areas to be Coated ..................................................... 435.01.01 373
Base Metal Readings.................................................. 435.03.10 377Bolts and Field Welds ................................................ 435.03.20 379
812
INDEX
Item Section Page
Caulking ..................................................................... 435.03.22 379
Containment System Plan Guidelines,
Field Cleaning ........................................................ 435.03.27 379
Containment System Requirements ............................ 435.03.28 379
Control of Overspray and Spills ................................. 435.03.21 379
Defective Work .......................................................... 435.03.23 379
Environmental Protection ........................................... 435.03.30 379
Environmental Protection Plan of Action ................... 435.03.31 379
Environmental Requirements...................................... 435.01.02 375
Field Applications of Prime, Intermediate,
and Finish Coats ..................................................... 435.03.19 378
Field Cleaning and Painting........................................ 435.03.06 376
Field Cleaning Waste Disposal................................... 435.03.33 380
Final Identification ..................................................... 435.03.25 379
Floodlighting .............................................................. 435.03.04 376
General Requirements ................................................ 435.01.02 375
Hazardous Waste Generator ....................................... 435.01.02 375
Hazardous Waste Transportation and Disposal .......... 435.03.36 380
Inspection Equipment ................................................. 435.03.02 376
Maintenance of Traffic .............................................. 435.01.02 375
Methods of Cleaning .................................................. 435.03.09 376
Nonhazardous Waste Disposal ................................... 435.03.37 380
OSHA Requirements .................................................. 435.01.02 375
Painting Sequence....................................................... 435.03.07 376
Paint Systems.............................................................. 435.02.01, 912.05 375, 720
Paint Representative ................................................... 435.03.14 377
Quality Assurance Inspector ....................................... 435.03.03 376
Repair of Coatings...................................................... 435.03.24 379
Repair of Surface Imperfections ................................. 435.03.11 377
Required Submittals.................................................... 435.03.01 375
Roadway Joints........................................................... 435.01.01(c) 374
Shop Application of Prime Coat ................................. 435.03.18 378
Shop Priming and Field Finish Painting ..................... 435.03.15 377
Shop Priming of New Steel ........................................ 435.03.05 376
Storage and Mixing .................................................... 435.03.13 377
Surface Condition Prior to Painting ............................ 435.03.12 377
Surface Preparation .................................................... 435.03.08 376
Time Restrictions........................................................ 435.03.16 377
Toxic Metals ............................................................... 435.01.02 375
Waste Containment, Field Cleaning ........................... 435.03.26 379
Waste Handling Plan of Action .................................. 435.03.34 380
Waste Sampling and Analysis .................................... 435.03.35 380
Weather Restrictions................................................... 435.03.17 378
Weathering Steel......................................................... 435.01.01(b) 374
Worker Protection ...................................................... 435.03.29 379
Cleaning and Painting Existing Structural Steel
Abrasives .................................................................... 436.02.02 383
Ambient Air Monitoring............................................. 436.03.34(b) 404
Applications of Prime, Intermediate,
and Finish Coats ..................................................... 436.03.21 395
Areas to be Cleaned and Painted ................................ 436.01.01 381
Assessing Emissions................................................... 436.03.32 380
Brush Off Blast Cleaning ........................................... 436.03.10(g) 392
Caulking ..................................................................... 436.03.23 397
Certification Requirements......................................... 436.01.03 383
Certified Industrial Hygienist ..................................... 436.03.02(c) 386
813
INDEX
Item Section Page
Competent .................................................................. 436.03.02(b) 386
Containment System Plan Guidelines ........................ 436.03.28 398
Containment System Requirements ........................... 436.03.29 399
Control of Overspray and Spills................................. 436.03.22 396Defective Work .......................................................... 436.03.24 397
Environmental Protection........................................... 436.03.32 403Environmental Protection Plan of Action................... 436.03.33 403
Assessing Emissions............................................... 436.03.34 404
Environmental Requirements ..................................... 436.01.02 382
Field Cleaning Waste Disposal .................................. 436.03.35 406
Field Painting ............................................................. 436.03.18 394 Final Identification ..................................................... 436.03.26 397 Floodlighting.............................................................. 436.03.06 389
Hand Tool Cleaning ................................................... 436.03.10(e) 391
Hazardous Waste Generator....................................... 436.01.02 382Hazardous Waste Transportation and Disposal.......... 436.03.40 408
High Pressure Water Cleaning ................................... 436.03.10(c) 391
Inspection Equipment................................................. 436.03.04 388Low Pressure Water Cleaning.................................... 436.03.10(b) 390
Maintenance of Traffic .............................................. 436.01.02 382
Methods of Cleaning .................................................. 436.03.10 390Monitor Placement and Reporting ............................. 436.03.34(b)(3) 405
Near White Metal Abrasive Blast Cleaning ............... 436.03.10(h) 392
Nonhazardous Waste Disposal................................... 436.03.41 408 OSHA Requirements.................................................. 436.01.02 382 Painting Sequence ...................................................... 436.03.08 389 Paint Systems ............................................................. 436.02, 912.05 383, 720
Personal Qualifications .............................................. 436.03.02 385
Power Tool Cleaning.................................................. 436.03.10(d) 391
Power Tool Cleaning to Bare Metal........................... 436.03.10(f) 391
Quality Control Inspectors ......................................... 436.03.02(a) 385
Quality Control Plan .................................................. 436.03.03 387Quality Assurance Inspector ...................................... 436.03.05 389Repair of Surface Imperfections................................. 436.03.13 393
Removal of Defects in Existing Coatings................... 436.03.14 393Removal of Vegetation Planking and Signage ........... 436.03.12 392
Required Submittals ................................................... 436.03.01 384 Surface Preparation .................................................... 436.03.09 390 Solvent Cleaning ........................................................ 436.03.10(a) 390
Storage and Mixing.................................................... 436.03.16 394
Surface Condition Prior to Painting ........................... 436.03.15 393
Paint Representative................................................... 436.03.17 394
Temporary Waste Storage Site................................... 436.03.38 407 Test Plates .................................................................. 436.03.11 392 Time Restrictions ....................................................... 436.03.19 394 Toxic Metals .............................................................. 436.01.02 382
Waste Containment, Field Cleaning........................... 436.03.27 398
Waste Handling Plan of Action.................................. 436.03.36 406
Waste Materials ......................................................... TC-6.11 113Waste Sampling and Analysis.................................... 436.03.37 407Waste Water Disposal ................................................ 436.03.39 407
Weather Restrictions .................................................. 436.03.20 394Worker Protection and Exposure Monitoring ............ 436.03.30 402
Worker Protection Compliance Program ................... 436.03.31 402
Clearances, Over and Under Structures ................... TC-6.12 113
814
INDEX
Item Section Page
Clearing and Grubbing
Damage to Trees and Protected Resources……………. 101.03.08 139
Damage Compensation ............................................... 712.03.12 611
Definitions…………………………………………… 101.01.01 137
Disposal ..................................................................... 101.03.07 139
Erosion and Sediment Control ................................... 101.03.01 138
Fences ........................................................................ 101.03.03 138
Grubbing……………………………………………... 101.03.05 138
Mailboxes ..................................................................
Stream and Channel Changes ....................................
Vegetation Not To Be Removed ................................
Closed Cell Neoprene Sponge Elastomer ...................
Coal Deposits ................................................................
Cofferdams and Foundation Seals .............................
Cold Drawn Steel Wire ...............................................
Cold Weather Protection
Portland Cement Concrete Pavement .........................Portland Cement Concrete Structures ........................
Combination Curb and Gutter, Removal of ..............
Communications and Interpretations Prior to Bid
Opening ....................................................................Compliance with Federal Law ....................................
Compliance with Laws ................................................ GP-7.01, TC-6.Compost ........................................................................
Concrete
Admixtures ................................................................
Box Culverts, for .......................................................
Consolidation of Plain and
Reinforced Pavements ...........................................
Curb ...........................................................................
Curing Materials ........................................................
Depositing Under Water ............................................
Ditches .......................................................................
Encasement for Pipe ..................................................
Epoxy Protective Coatings .........................................
Fence Post Base, for ..................................................
Foundations for Traffic Signals, etc. ..........................
Latex Modified Overlay for Bridge Decks ................
Lightweight Superstructure ........................................
Masonry Block, Hollow .............................................
Masonry Block, Solid ................................................
Miscellaneous Structures (inlets,
manholes, etc.) .......................................................
Mix Designs ...............................................................
Monolithic Median ....................................................
Patching Bridge Deck ................................................
Pavement Repairs ......................................................
Prestressed Beams and Slab Panels ...........................
Prevention and Removal of Stains .............................
Saline Water, in .........................................................
Seals ...........................................................................
Sidewalk ....................................................................
Slope and Channel Protection ....................................
Steel Pipe Piles, for ....................................................
101.03.04 138
101.03.06 139
101.03.02 138
911.10 713
201.03.10 220
402.03.04, 420.03.05 282, 322
908.09 703
520.03.12 503
420.03.13 331
206 230
GP-2.09 11
GP-7.20(b) 49
03 39, 107
920.02.05 754
902.06 666
420.03.04(d) 317
520.03.08 502
602 521
902.07 667
420.03.05 322
309.03.03 269
303.03.06 240
464 448
607.03.02 538
801.03.03 621
426 347
425 345
903.04 682
903.05 682
305 246
902.10 668
602 521
401 279
522 509
440 409
420.03.16 332
420.03.05(c) 323
420.03.05(b) 323
603 524
310 270
410.03.12 292
815
http:GP-7.01
INDEX
Item Section Page
Subfoundation ........................................................... 420.03.04(a) 314Concrete Foundations for Signals, Lights,
Signs ......................................................................... 801 621Concrete Overlays ........................................................ See Latex Modified Concrete
Concrete Structures .................................................... 420 306Concrete Traffic Barriers ........................................... 604 527Conduit and Fittings ................................................... 805, 921.07 626, 782
Structures, in .............................................................. 420.04 333Confidential Data ........................................................ GP-2.13(b) 13Confirmation of Bid .................................................... GP-2.14(b) 13Conflict of Interest Law .............................................. GP-7.34 55Conformity with Contract Requirements ................. GP-5.02 27
Connections for Pipe Culverts .................................... 303.03.05 240Connector Kits ............................................................. 810.03.08 637Connectors for Timber Structures ............................. 462.03.09 444Construction ................................................................ GP-1.05 4
Warranty of ............................................................... GP-4.10 26
Construction Documents to Successful
Bidder ....................................................................... TC-3.02 93Construction Entrance, Stabilized ............................. 308.03.31 263Construction Joints
Concrete Pavements .................................................. 520.03.14 504Concrete Structures ................................................... 420.03.11 330Soil-Cement Base ...................................................... 502.03.11 462
Construction Safety and Health Standards ............... GP-7.05 40
Construction Stakeout
Control Markers ........................................................ 107.03.03 196Control Stakes ........................................................... 107.03.04 196Details Furnished by the Engineer ............................. 107.03.01 195
Equipment and Personnel .......................................... 107.03.02 196
Layout ....................................................................... 107.03.05 196Layout of Utilities ..................................................... 107.03.06 196Right-of-Way and Easement Line ............................. 107.03.07 197Subgrade, Subbase, and Base Controls ...................... 107.03.08 197
Contents of Bid Forms ................................................ GP-2.02 8
Content of Written Protest ......................................... GP-2.23(b) 19Contingent Fee Prohibition ........................................ GP-7.24 50
Continuously Reinforced Concrete Pavement ........... See Portland Cement
Concrete Pavements
Contract
Award and Execution ................................................ GP-Section 3 19
Conformity with Requirements ................................. GP-5.02 27Documents ................................................................ GP-1.05 5
Drawings ................................................................... GP-1.05 5
Failure to Execute ...................................................... GP-3.05 21Intent of ..................................................................... GP-4.01 21Item (Pay Item) ......................................................... GP-1.05 5Modification .............................................................. GP-1.05 5
Notice to Proceed ...................................................... GP-1.05 5Subcontracting ........................................................... GP-1.05, 8.01 7, 56
Time, Determination and Extension of ...................... TC-5.05 105
Contractor Cooperation ............................................................... GP-5.04, GP-5.06 28, 29
Responsibility for Utility Property and Services ....... GP-7.17 47
Responsibility for Work ............................................ GP-7.16 46
816
http:GP-1.05http:GP-5.04
INDEX
Item Section Page
Control and Distribution Equipment ......................... 950.13 799
Control of the Work .................................................... GP-Section 5 27
Control Strip
Hot Mix Asphalt Pavement ........................................ 504.03.13 476HMA Gap-Graded ...................................................... 506.03.09 487Permanent Pavement Markings ................................. 549.03.03 519
Control, Subgrade ....................................................... 208.03.02 233Controller Cabinets for Traffic Signals ..................... 816 642
Conveyors for Concrete Structures ............................ 420.03.04(h) 322Cooperation with Utilities ........................................... GP-5.05 29Cores for Hot Mix Asphalt Pavement ........................ 504.03.10 472Corporate Registration and Tax Payment
Certification ............................................................. GP-7.27 52Cost and Price Certification ........................................ GP-7.26 51
Cotton Mats for Curing Concrete .............................. 420.03.09(d) 328Crash Cushion, Temporary ......................................... 104.10 165Crossovers and Interchanges ...................................... 104.02.03(c) 151Cross Section Method of Measurement
of Excavation ............................................................ 201.04.03 223Cultural Resources ...................................................... TC-5.04 104Culverts, Concrete Box ............................................... 420 306Culverts, Pipe ............................................................... 303 239
Abandoned ................................................................. 303.03.10 241Backfilling ................................................................. 303.03.07 241
Bedding ...................................................................... 303.03.02 240Cleaning Existing ....................................................... 303.03.11 241Connections ............................................................... 303.03.05 240Encasement ................................................................ 303.03.06 240
Ends When Placed Askew ......................................... 303.03 239Excavation ................................................................. 303.03.01 239
Inspection and Acceptance ......................................... 303.03.12 241Installation ................................................................. 303.03.03 240
Joints .......................................................................... 303.03.04 240Relaying Existing ....................................................... 303.03.09 241Removal of Existing .................................................. 303.03.08 241
Curb Combination Curb and Gutter, Concrete ................... 602.03 521
Depressed .................................................................. 602.03.01(d) 522Hot Mix Asphalt ........................................................ 602.03.02 523Gutters, etc. Abutting Hot Mix Asphalt
Pavement ............................................................... 504.03.15 477
Openings, Concrete .................................................... 602.03.01(e) 522Removal of Concrete ................................................. 206.03 231
CuringConcrete Structures, Duration .................................... 420.03.08 327Concrete Structures, Methods .................................... 420.03.09 328Plain and Reinforced Concrete Pavements ................ 520.03.12 503Portland Cement Concrete
Pavement Repairs .................................................. 522.03.11 513Cutoff of Piling ............................................................. 410.03.10 292Cutting and Bending Reinforcement .......................... 421.03.03 335Cutting and Boring of Timber Structures ................. 462.03.02 442
817
INDEX
Item Section Page
D
Dampproofing and Membrane Waterproofing Application of Dampproofing ................................... 422.03.05 339Application of Membrane Waterproofing ................. 422.03.06 340
Storage of Materials .................................................. 422.03.01 338
Surface Preparation ................................................... 422.03.02 339
Day ................................................................................ GP-1.05 5Damage
Liquidated ................................................................. GP-8.09 62
Responsibility for Claims .......................................... GP-7.13 45Responsibility for Utility ........................................... GP-7.17 47Termination ............................................................... GP-8.08, 8.10 60, 62
Debarment/Suspension ............................................... TC-2.05 92
Deck Pouring Sequence ............................................... 420.03.04(c)3 316 Defective
Concrete Structure Work ........................................... 420.03.18 332Material and Workmanship for Metal Structures ...... 430.03.07 357
Painting Work ........................................................... 435.03.23, 436.03.24 379, 397
Defective Work, Removal of ....................................... GP-5.09 31
Definition (Tie Bid) ...................................................... GP-2.20 17Definitions .................................................................... GP-1.05, TC-1.02 4, 82
Delivery of Bids ........................................................... GP-2.08 11Depositing Concrete Under Water ............................. 420.03.05 322Detectable Warning Surfaces ...................................... 611, 925 542, 789
Detector Loops for Lighting and Signal Systems ...... 810.03.06 637
Detours ......................................................................... GP-7.07 42Detour Roads, Payment for Construction
and Removal of ........................................................ 104.02.04(d) 155Developers, Steel Stud Shear ...................................... 431 370Diameter of Holes for Timber Structures ................. 462.03.06 443Differing Site Conditions ............................................ GP-4.05 22Direct Burial Cable ..................................................... 810.03.01 636Discrepancies in the Contract Documents ................. GP-5.03 28
Disposition of Bid Security ......................................... GP-2.11(b) 12Disputes ........................................................................ GP-5.15 35Ditches
Bleeder ...................................................................... 208.03.03 233Concrete .................................................................... 309 269Riprap ........................................................................ 311 272Trimming .................................................................. 209 234
Drainage of Roadway During Construction .............. 201.03.07 219
Drainage Structures .................................................... 305.03.05 247Drains, Permanent Subgrade ..................................... 306.03.08 250Drilled Holes in Existing Masonry ............................. 406 287Driving Piles ................................................................. 410.03.06 289Drilled Shafts (Caissons).............................................. 412 298 Geotechnical Engineer ............................................... 412.03.03 299 Shaft Installer ............................................................. 412.03.03 298 Shaft Requirements .................................................... 412.03.04 299 Subfoundation Investigation ...................................... 412.03.01 298Drums for Maintenance of Traffic ............................. 104.12 169
818
http:GP-8.08http:GP-1.05
INDEX
Item Section Page
E
Earth Shoulders ........................................................... 601 521
Elastomeric Bearing Pads ........................................... 432.03.04, 910.02 371, 706
Electrical
Cable and Wire .......................................................... 950.06 794
Cable, Connectors, and Connector Kits ..................... 810, 950.14 636, 802
Cable, Trenching and Backfilling .............................. 809 635
Conduit and Fittings .................................................. 805 626
Conduit Detector Tape ............................................... 950.11 796
General Work and Testing ......................................... 820 646
Grounding .................................................................. 804 624
Handholes, Manholes, Pull and Junction Boxes ........ 811 638
Service Equipment ..................................................... 807 630
Eliminated Items .......................................................... TC-7.08 134
Embankment and Subgrade
Adjacent to Structures ................................................ 204.02.03 227
Benching .................................................................... 204.03.03 228
Broken Pavement Material Used In ........................... 201.03.03 218
Compaction ................................................................ 204.03.04 228
Foundation ................................................................. 204.03.01 227
Frozen Material .......................................................... 204.02.02 227
Maintenance ............................................................... 204.03.08 229
On Existing Pavement ............................................... 204.03.01(b) 227
On Unstable Ground .................................................. 204.03.02(a) 228
Placing and Spreading ............................................... 204.03.02 227
Protection of Structures and Utilities ......................... 204.03.06 229
Stability of Embankments .......................................... 204.03.05 229
Subgrade Construction ............................................... 204.03.07 229
Test Rolling ............................................................... 204.03.01(c) 227
Emergency Filler for Concrete Pavement Repairs ... 522.03.12 513
Emergency Filler for Hot Mix Asphalt Patches ........ 505.03.05 484
Emulsified Asphalt ...................................................... 904.03 684
Encased Conduit .......................................................... 805.03.09 627
Encasement for Pipe .................................................... 303.03.06 240
End Treatments for Traffic Barriers
Permanent ................................................................... 606 533
Temporary .................................................................. 104.09 163
End Walls, End Sections ............................................. 305 246
Engineer ....................................................................... GP-1.03 2
Engineers Office ........................................................... 103 141
Enter and Exit at Interchanges or
Public Use Crossovers ............................................. 104.02.03(c) 151
Epoxy Adhesives
Bearing Pads .............................................................. 432.03.04, 921.04 371, 782
Bridge Decks ............................................................. 420.03.11, 921.04 330, 782
Concrete Pavement Repairs ....................................... 522.02.04, 921.04 510, 782
Grout .......................................................................... 902.11(d)(e) 677, 678
Epoxy Coated Reinforcing Steel .................................. 465 450
Existing Reinforcing................................................... 421.03.07 337
Repair and Touchup ................................................... 421.03.05, 465.03 336, 451
Shipping, Handling, and Storage ................................ 421.03.04 335
Epoxy Protective Coatings for Concrete .................... 464, 917.01 448, 741
Epoxy Protective Coatings for Metal,
Fusion Bonded ......................................................... 465, 917.02 450, 742
819
INDEX
Item Section Page
Equipment
Aggregate Base Course ............................................. 501.03.01 457
Force Account Work ................................................. GP-9.02 70Hot Mix Asphalt Pavement ....................................... 504.03.01 468 Latex Modified Concrete Overlay for Bridge Decks . 426.03.01 347
Moving and Storage .................................................. TC-6.01, 104.02.03(c) 106, 151
Plain and Reinforced Concrete Pavements ................ 520.03.01 498 Portland Cement Concrete Pavement Repairs ........... 522.03.01 510
Rental Equipment, Rental Rates ................................ TC-7.03 (d) 125
Soil-Cement Base Course .......................................... 502.03.01 460
Erection Plan, Metal Structures ................................. 430.03.27 366 Erosion and Sediment Control ................................... 308 253
Excavation ................................................................. 308.03.15, 308.03.16 261
Fasteners for Soil Stabilization Matting ..................... 920.05.02 760
Grading Unit .............................................................. 101.01.01(e) 137
Manager .................................................................... 308.03.01, 308.03.03 256, 257
Meetings .................................................................... 308.03.06 259 Plan ........................................................................... 308.03.02 257 Preconstruction Conference ....................................... 308.03.05 259 Schedule .................................................................... 308.03.04 258 Soil Stabilization Matting, Installation ...................... 709 583
Soil Stabilization Matting Products............................ 920.05.01 759 Standards and Specifications ..................................... 308.01.02 253
Escrow Accounts for Retained Funds ........................ TC-7.05(4) 128
Estimates ...................................................................... TC-7.05(a) 127
Excavation
Beyond Specified Limits ........................................... 201.03.08 220 Borrow ...................................................................... 203 224Borrow Pit Material ................................................... 203.03.02 225 Broken Pavement Material ........................................ 201.03.03 218 Class 1 ....................................................................... 201.01.01 217 Class 1-A ................................................................... 201.01.01 217 Class 2 ....................................................................... 201.01.01 217 Class 3 ........................................................................ 402 280Class 3 Excavation for Incidental Construction ........ 301 238
Class 5, Channel or Stream Change .......................... 202 223Classification ............................................................. 201.01.01 217 Coal Deposits ............................................................ 201.03.10 220 Cross Section Method of Measurement ..................... 201.04.03 223
Drainage of Roadway ................................................ 201.03.07 219 Erosion and Sediment Control ................................... 308.03.15, 308.03.16 261
Finished ..................................................................... 201.03.08(a) 220
Footings ..................................................................... 402.03.02, 402.03.03 281
Frozen Material ......................................................... 201.03.05 219 Gabions ..................................................................... 313 275Grading Units ............................................................ 101.03.01, 201.03.01 138, 218
Pile Foundations ........................................................ 402.03.03 281 Pipe Culverts, Width of Trench for ........................... 303.03.01 239
Roadway .................................................................... 201 217Rock, Blasting and Presplitting ................................. 201.03.04 218 Serrated Slopes .......................................................... 201.03.06 219 Structural Plate Pipe and Pipe Arch Culverts ............ 304.03.02 244
Subfoundation Investigation ...................................... 419 305Template Method of Measurement ............................ 201.04.02 222
Test Pit ...................................................................... 205 230
820
Chip Seal Surface Treatment ..................................... 503.03.01 463
http:TC-6.01
INDEX
Item Section Page
Underdrains and Subgrade Drains ............................. 306.03.01 249
Unsuitable Material ................................................... 201.03.09 220
Execution of Contract .................................................. GP-3.04 20
Existing
Bridge Deck, Maintaining During Life of Contract ... 401 279
Bridge Removal ......................................................... 405.03.03 286
Buildings, Removal and Disposal .............................. 102 140
Ditches, Trimming ..................................................... 209 234
Masonry, Removal of ................................................ 207.03.01 232
Pavement, Embankment Over ................................... 204.03.01(b) 227
Pavement, Removal of ............................................... 206 231
Regulatory, Warning, and Guide Signs ..................... 104.02.03(b) 150
Roadway, Maintenance of ......................................... 104.02.03(a) 150
Expansion Joints Concrete Pavements ................................................... 520.03.14(b) 505
Conduit ...................................................................... 805 626
Structures ................................................................... 460 438
Explosives ..................................................................... 201.03.04(b) 218
Exposed Conduit .......................................................... 805.03.06 627
External Vibration of Concrete .................................. 420.03.06(b) 324
F
Fabric Saturated with Asphalt ................................... 913.03 723
Failure to Adequately Maintain Project .................... TC-4.02 98
Failure to Maintain Entire Project ............................. GP-5.12 33
Falsework for Metal Structures .................................. 430.03.28 366
Falsework Systems, Working Drawings for .............. TC-4.01 95
Federal Participation ................................................... GP-7.04 40
Fence
Chain Link ................................................................. 607 536
Temporary Orange Construction ............................... 104.20 180
Within Right-of-Way ................................................. 101.03.03 138
Fertilizers....................................................................... 920.03 756
Fiberglass ...................................................................... 907.01.01, 921.11 702, 786
Fill, Tamped ................................................................. 210 234
Filter Blanket, Aggregate ............................................ 312.03.03 273
Final Acceptance and Final Payment ......................... TC-7.06 130
Final Clean Up ............................................................. GP-4.09 25
Financial Disclosure ..................................................... GP-7.32 54
Finishing
Aggregate Base Courses ............................................ 501.03.09 458
Concrete Structures, Surfaces for ............................... 420.03.07 324
Plain and Reinforced Concrete Pavements ................ 520.03.09 502
Portland Cement Concrete Pavement Repairs ........... 522.03.10 513
Soil-Cement Base Course .......................................... 502.03.08 461
Fire Hydrants ............................................................... GP-7.06, GP-7.17 41, 47
Flagger for Maintenance of Traffic ............................ 104.15 171
Flagging of Motor Vehicle Traffic .............................. GP-7.09 43
Flooding for Curing Concrete Structures .................. 420.03.09(a) 328
Floodlighting
Cleaning and Painting, for Payment ........................... 435.03.02, 436.03.03 376, 389
401.04.01, 420.04.06 280, 334
435.04, 436.04 380, 409
Superstructure Placement .......................................... 420.03.04(c) 315
821
http:GP-7.06
INDEX
Item Section Page
Flowable Backfill .......................................................... 314 276Fly Ash
Flowable Backfill ...................................................... 314 276
Portland Cement Concrete ......................................... 902.10 668Pozzolans .................................................................. 902.06.04 667
Footings Elevations .................................................................. 402.03.02 281
Foundations ............................................................... 402.03.03 281
Force Account Work ................................................... TC-7.03 122Forms
Concrete Structures ................................................... 420.03.02 308Design Criteria ........................................................... 420.03.02(a) 308Forms Which Remain in Place .................................. 420.03.02(g) 310Plain and Reinforced Concrete Pavements ................ 520.03.04 499Portland Cement Concrete Pavement Repairs ........... 522.03.06 512
Release Compounds .................................................. 420.03.02(j), 902.08 312, 668
Foundations Concrete Structures ................................................... 420.03.04(a) 314Embankment for ........................................................ 204.03.01 227Hot Mix Asphalt Pavement ....................................... 504.03.03 470Plain and Reinforced Concrete Pavements ................ 520.03.03 499Seals .......................................................................... 420.03.04(a) 314
Traffic Signals, Highway Lighting and Signs ........... 801 621
Frozen Material in Embankments ............................. 201.03.05, 204.02.02 219, 227
Furnished Topsoil ........................................................ 920.01.04 750Furnished Subsoil......................................................... 920.01.02 749Fusion Bonded Epoxy Powder
Coating for Steel ...................................................... 465, 917.02 450, 742 Fusion Bonded Polyester Coating for
Metal Traffic Barriers ............................................. 465, 917.03 450, 742
G
Gabions ........................................................................ 313 275Galvanized Steel Beam Sign Posts ............................. 802 622Gates ............................................................................. 914.04 725General Electrical Work and Testing ........................ 820 646
General, Maintenance of Traffic ................................ 104 147General Provisions Controlling .................................. GP-4.02 22Geosynthetic Stabilized Subgrade Using
Graded Aggregate Base .......................................... 211 235Geotextiles
Classes ....................................................................... 921.09 784Gabions ..................................................................... 313.03.02 275Placement for Riprap Slope and
Channel Protection ................................................ 312.03.02 273Placement in Riprap Ditches ..................................... 311.03.02 272Underdrains and Subgrade Drains ............................. 306.03.02 249
Glass Resin Composite Shield .................................... 410.03.13 293Governing Order of Contract Documents ................. TC-3.01 93
Graded Stabilized Aggregate Base Protection
and Curing for Base Courses .................................. 501.03.11 458Grading Unit ................................................................ 101.01.01(e), 137
201.03.01 227Gray Iron Castings ...................................................... 909.04 705
822
INDEX
Item Section Page
Grinding HMA Pavement ........................................... 509 493
Grooving of Bridge Deck Slabs ................................... 420.03.07(d)(1) 326
Grounding .................................................................... 804 624
Grubbing ...................................................................... 101.03.05 138
Gypsum.......................................................................... 920.02.04 754
H
Hammers, Pile .............................................................. 410.03.06 289
Handholes and Manholes, Electrical .......................... 811.03.01 638
Hardware, Metals for .................................................. 909.10 705
Hardware for Traffic Barriers ................................... 918.03 747
Hazardous Material ..................................................... TC-6.09 111
Hazardous Waste from Cleaning and Painting ......... 435.03.36, 436.03.40 380, 408
High Embankments, Grubbing .................................. 101.03.05(c) 138
High Strength Bolts, Nuts and Washers .................... 430.03.16, 909.07 360, 705
Holidays ........................................................................ TC-1.03 84
Hot Mix Asphalt
Abutting Shoulders .................................................... 504.03.16 477
Bid Price Adjustment ................................................. 504.04.01, 504.04.02 478, 479
Compaction................................................................. 504.03.06 471
Curbs, Gutters, etc. .................................................... 504.03.15, 602.03.02 477, 523
Control Strip .............................................................. 504.03.13 476
Edge Dropoff ............................................................. 504.03.08 471
Equipment .................................................................. 504.03.01 468
Filling Cracks ............................................................ 510 495
Foundation Preparation .............................................. 504.03.03 470
Gap-Graded ............................................................... 506 486
Grinding ..................................................................... 509 493
Joints .......................................................................... 504.03.07 471
Maintenance of Traffic, for ........................................ 106 194
Milling ....................................................................... 508 492
Mixes ......................................................................... 904.04 684
Patches ....................................................................... 505 483
Pavement Profile ........................................................ 504.03.17 477
Pavement Surface Checks .......................................... 504.03.14 476
Placement .................................................................. 504.03.05 470
Plants ......................................................................... 915.02 728
Sampling and Testing for Density ............................. 504.03.10 472
Sidewalk .................................................................... 603.03.02 526
Tack Coat ................................................................... 504.03.04 470
Tie-In ......................................................................... 504.03.09 472
To Fill Depressions, Potholes, and Irregularities ....... 508.04.02, 509.04.01 493, 495
Weather ...................................................................... 504.03.02 470
Hydrated Lime ............................................................. 921.03 782
Hydraulic Cement, Blended ........................................ 902.04 666
I
Identification of Structure ........................................... 495 453
Identification of Paint System on Structure .............. 435.03.25, 436.03.26 379, 397
Industrial Hygienist ..................................................... 436.03.02(c) 386
Infiltration Trenches ................................................... 315 277
Inlets ............................................................................. 305 246
Inlet Protection ............................................................. 308.03.30 263
823
INDEX
Item Section Page
Inspection of Metal Structures ................................... 430.03.20 364
GP-5.08 30
5.07 2, 30
806 628
Inspection of Work ......................................................Inspectors ..................................................................... GP-1.03,Installation
Luminaires and Lamps ..............................................
Pipe Culverts .............................................................
In State Preference ......................................................
Insurance ......................................................................
Insurance, Liability .....................................................
Interchange and Crossovers .......................................
Internal Vibration of Concrete ...................................
Interpretation of Quantities in Bid ............................
Investigation, Subfoundation .....................................
L
Land, Air and Water Pollution .................................. Landscaping
Annuals and Bulbs Installation and Establishment .... Brush Removal...........................................................
Meadow Establishment .............................................
Shrub Seeding ............................................................
Soil Stablilization Matting .........................................
Temporary Seed and Temporary Mulch.....................
Topsoil and Subsoil....................................................
Tree Branch Pruning ..................................................
Tree Felling................................................................
Tree Fertilizing...........................................................
Tree Root Pruning......................................................
Tree, Shrub, Perennial Installation, Establishment..... Turfgrass Establishment.............................................
Turfgrass Sod Establishment......................................
Wildflower Seeding ...................................................
Landscaping Materials ................................................
Approved Cultivars ....................................................
Names and Naming....................................................
Fertilizers ...................................................................
Marking and Staking Materials ..................................
Mulches......................................................................
Plant Materials ...........................................................
Prohibited Weeds .......................................................
Soil Amendments .......................................................
Soil Stabilization Matting...........................................
Soils ...........................................................................
Seed and Turfgrass Sod Standards .............................
Seed Testing and Sampling ........................................
SHA Seed Mixes........................................................
Standards for Seed Species ........................................
Turfgrass Sod .............................................................
Water, Pesticides, and Adjuvants ...............................
Language ......................................................................Late Payments ............................................................. Latex Modified Concrete Overlay for Bridge Decks
Equipment .................................................................
Limitation of Operations ...........................................
824
303.03.03 240
GP-2.20 17
TC-5.01 100
GP-7.14 45
104.02.03(c) 151
420.03.06(a) 324
GP-2.03 8
419 305
GP-7.12 44
711 603
713 612
707 566
706 560
709 583
704 547
701 544
712 610
714 614
716 619
715 617
710 587
705 550
708 578
707 566
920 748
920.06.04 765
920.06.01 762
920.03 756
920.08 779
920.04 758
920.07 775
920.06.02 763
920.02 754
920.05 759
920.01 748
920.06 762
920.06.05 765
920.06.07 775
920.06.06 766
920.06.03 765
920.09 779
TC-1.01 81
TC-7.07 133
426.03.01 347
426.03.08 353
http:GP-1.03
INDEX
Item Section Page
Placing and Finishing Concrete ................................. 426.03.05 352
Proportioning and Mixing LMC Materials ................ 426.03.04, 902.13 352, 678
Rate of Overlay .......................................................... 426.03.01 347
Surface Preparation .................................................... 426.03.03 352
Latex Modified Slurry Seal ......................................... 507 489
Legal Relations and Responsibility to Public ............ GP-Section 7 39
Liability, Personal of Public Officials ........................ GP-7.18 48
Lighting Structures ...................................................... 808, 950.07 634, 795
Lighting Structures, Disposal/Relocate ...................... 823 651
Lightweight Superstructure Concrete ....................... 425 345
Limestone ..................................................................... 920.02.01 754
Limit of Disturbance .................................................. 101.01.01 137
Limitations of Operation ............................................. GP-8.05 58
Linseed Oil Protective Coating for Concrete ............. 420.03.12, 902.12 330, 678
Liquid Membrane-Forming Compounds for
Concrete Curing ....................................................... 420.03.09(f), 328
520.03.12(a) 503
Liquidated Damages .................................................... GP-8.09 62
Load and Speed Limitations ....................................... TC-6.02 106
Load Restrictions ......................................................... GP-5.10, TC-6.13, 31, 114
TC-6.14 115
Load Test, Pile .............................................................. 411 295
Loads on Concrete Structures .................................... 420.03.15 332
Lock-Pin and Collar Fasteners ................................... 430.03.16 360
Loop Detector ............................................................... 810.03.06 637
Loop Detector Cable Sealing ...................................... 815.03.02 641
Low Embankments, Grubbing ................................... 101.03.05(b) 138
Lowest Bidder, Determination of ............................... GP-2.19 16
Luminaires and Lamps ............................................... 806, 950.12 628, 796
Lump Sum Contracts .................................................. TC-7.05 127
M
Magnesium Chloride ................................................... 501.03.12, 921.02.02 459, 781
Mailboxes ...................................................................... 101.03.04 138
Mailboxes, Maintained or Reset ................................. GP-7.06 41
Maintaining Existing Bridge Deck ............................. 401 279
Maintenance
Aggregate Base Course .............................................. 501.03.13 459
Soil-Cement Base Course .......................................... 502.03.13 462
Maintenance of Existing Roadway ............................. 104.02.03(a) 150
Maintenance of Stream Flow ...................................... 308.03.36 264
Maintenance of Traffic ................................................ GP-7.10, 104 43, 147
Aggregate .................................................................. 105 193
Arrow Panel ............................................................... 104.07 159
Barricades, Type I, II, and III .................................... 104.13 170
Cones ......................................................................... 104.14 170
Contractor's Vehicles, Enter, Exit Legally ................. 104.02.03(c) 151
Drums ........................................................................ 104.12 169
Existing Regulatory, Warning, and Guide Signs ....... 104.02.03(b) 150
Flagger ....................................................................... 104.15 171
General ...................................................................... 104 147
Hot Mix Asphalt for ................................................... 106 194
Portable Variable Message Sign ................................ 104.19 175
Temporary Concrete Traffic Barrier .......................... 104.04 156
825
http:GP-5.10http:TC-6.13http:GP-7.10
INDEX
Item Section Page
Temporary Crash Cushion Sand Filled Plastic Barrels ........................................................ 104.10 165
Temporary Movable Type Concrete Traffic Barrier . 104.17 173
Temporary Pavement Markings ................................ 104.11 166
Temporary Raised Pavement Markers ....................... 104.03 156Temporary Traffic Barrier End Treatments ............... 104.09 163
Temporary Traffic Signs ........................................... 104.08 161Traffic Barrier W Beam ............................................ 104.05 157Traffic Control Plan .................................................. 104.01 148Traffic Maintenance .................................................. 104.02 150Traffic Manager ......................................................... 104.18 174
Maintenance of Work During Construction ............. GP-5.11 32
Manager, Erosion and Sediment Control................... 308.03.03 257Manholes ...................................................................... 305 246Markers, Tubular, for Maintenance of Traffic ......... 104.06 158
Marking and Shipping, Metal Structures ................. 430.03.08 357Marking , Handling, Shipping, and Storage,
Prestressed Concrete Beams and Slabs ................. 440.03.19 422Markings, Pavement
Permanent ................................................................. 549 516 Temporary ................................................................. 104.11 166Masonry
Brick .......................................................................... 463 445
Cement ...................................................................... 902.05 666
Drilled Holes ............................................................. 406 287Miscellaneous Structures ........................................... 305 246Protection of Retained ............................................... 207.03.03 232Removal of Existing .................................................. 207 232
Materials Found on the Project .................................. TC-3.03 94Material, Moving, and Storage ................................... 104.02.03(c) 151Materials Recycled/Rehandled ................................... TC-6.10 112Measurement and Payment ........................................ TC Section 7 116
Meadow Establishment ................................................ 707 566
Application Rates ....................................................... 707.03.08 569 Final Acceptance........................................................ 707.03.15 572Meadow Seed ............................................................. 707.03.08, 570
920.06.06(d), (e) 769, 771
Non-Selective Herbicide Application......................... 707.03.04 568
Nutrient Management Plan......................................... 707.03.01(e) 567Pesticide Application.................................................. 710.03.01(c) 567Regional Areas ........................................................... 705.03.01(a) 567Seed Delivery, Weighing, Mixing.............................. 707.03.07 569Seeding Schedule ....................................................... 707.03.02(a) 567 Seeding Seasons......................................................... 707.03.01(b) 567
Membrane for Waterproofing and Dampproofing .. 422, 913.04 338, 723
Metal Railing ............................................................... 461 441Metal Structures
Abutting Joints .......................................................... 430.03.22 365Anchor Bolts ............................................................. 430.03.31 367Bent Plates ................................................................. 430.03.26 365Camber Diagram ....................................................... 430.03.14 359Changes and Substitutions ......................................... 430.03.10 358
Damaged or Defective Material ................................ 430.03.29 367Defective Material and Workmanship ....................... 430.03.07 357Erection Plan ............................................................. 430.03.27 366Fabrication ................................................................ 430.03.11 358
826
INDEX
Item Section Page
Facilities for Shop Inspection .................................... 430.03.03 356
Falsework .................................................................. 430.03.28 366
High Strength Bolts and Lock-Pin
and Collar Fasteners ............................................... 430.03.16 360
Inspection of Fabricated Metal Structures ................. 430.03.20 364
Holes .......................................................................... 430.03.12 358
Marking and Shipping ............................................... 430.03.08 357
Match Marking .......................................................... 430.03.15 359
Mill Orders ................................................................ 430.03.05 356
Planing ....................................................................... 430.03.21 364
Reuse of Bolts and Nuts.............................................. 430.03.17(f) 362
Shop Assembly .......................................................... 430.03.13 359
Snug Tight .................................................................. 430.03.17(d) 361
Storage of Material .................................................... 430.03.09 358
Substitutes for Rolled Members ................................. 430.01 355
Testing ....................................................................... 430.03.06 357
Turn of Nut Method.................................................... 430.03.17(e) 362
Web Plates ................................................................. 430.03.25 365
Welding ..................................................................... 430.03.19 363
Work Scheduling ....................................................... 430.03.02 356
Working Drawings ..................................................... TC-4.01, 430.03.01, 95, 356
499 454
Milling ........................................................................... 508 492
Minor Irregularities or Informalities ......................... GP-2.15 14
Minority Business Enterprise and Affirmative
Action ........................................................................ GP-7.29 52
Miscellaneous Structures ............................................ 305 246
Miscellaneous Protective Coating ............................... 917.01 741
Mistakes in Bids ........................................................... GP-2.14 13
Mobilization ................................................................. 108 199
Modification of Existing Signs .................................... 104.16 172
Modify Existing Sign Messages ................................... 824 651
Moisture and Dust Control Agents ............................. 501.03.12 459
Mortar for Grout ......................................................... 902.11 677
Mortar for Masonry .................................................... 903.06 682
Mortar, Pneumatically Applied .................................. 423 341
Moving of Equipment .................................................. TC-6.01 106
Mowing
Meadow Establishment and Wildflower Seeding ....... 707.03.05, 707.03.29 568, 576
Turfgrass Establishment ............................................. 705.03.14 557
Tractor and Hand Mowing, Payment.......................... 705.04.08, 707.04.05 559
Mulches ......................................................................... 920.04 758
Composted Wood Chip Mulch ................................... 920.04.04 759
Shredded Hardwood Bark Mulch ............................... 920.04.03 758
Straw Mulch ............................................................... 920.04.01 758
Wood Cellulose Fiber Mulch...................................... 920.04.02 758
Mulching
Additional Mulch........................................................ 710.04.05 603
Annuals and Bulbs...................................................... 710.03.13, 711.07.07 595
Application Equipment............................................... 704.03.02(b) 548
Meadow Establishment and Wildflower Seeding ....... 707.03.11 571
Temporary Mulch....................................................... 704.03.03 549
Temporary Seed.......................................................... 704.03.02(e) 549
Planting Beds, Annuals and Bulbs.............................. 711.03.07, 595
711.03.10(b) 606
827
http:TC-4.01
INDEX
Item Section Page
Planting Pits, Trees, Shrubs and Perennials ............... 710.03.13 595
Turfgrass Establishment, Shrub Seeding.................... 705.03.09 595
Multi-Year Contracts Contingent Upon Appropriations ........................................................ GP-7.25 51
N
Negotiated Payment Provision ................................... GP-4.07 25Neoprene Strip Seals ................................................... 911.05 709Noise Barriers ............................................................... 455 429
Anchor Bolt Assemblies ............................................ 455.03.02 434
Defects and Tolerances .............................................. 455.03.04 436Drilled Shafts (Caissons)............................................ 412 298
Joints .......................................................................... 455.02.03 432 Panel Finish................................................................ 455.02.03 432 Post Finish.................................................................. 455.02.04 433 Preapproved Alternate................................................ 455.01.02 429 Sample Panels ............................................................ 455.02.03 432 Special Bidding Instructions ...................................... 455.01.01 429Non-Discrimination in Employment .......................... GP-7.20 48
Non-hiring of Employees ............................................ GP-7.22 50Notice to Proceed ......................................................... GP-8.02, TC-5.02 56, 101
No Waiver of Legal Rights ......................................... GP-7.19 48Nuclear Density, Measurement for
Hot Mix Asphalt ...................................................... 504.03.10(a) 474
O
Organizational Structure ............................................ GP-1.02 1
Outlets for Underdrain ............................................... 306.03.04 249Overhead Sign Structures ........................................... 803, 950.04 623, 794 Overlay, Latex Modified Concrete for Bridge Decks 426 347
Overlay, Slab Bridges .................................................. 440.03.22 324
Overseeding and Reseeding Turfgrass ....................... 705.03.13 556
Overseeding Thin Turf............................................... 705.03.13(a) 556 Reseeding Failed Turf ................................................ 705.03.13(b) 557Owner/Operator .......................................................... TC-2.04 92
P
Paint, Structural .......................................................... 435, 912 375, 715Paint Representative ................................................... 435.03.14, 436.03.17 377, 394
Painting Existing Steel ................................................ 436 380Painting New Steel ....................................................... 435 373Paraffin Wax Bond Breaker for Concrete ................ 902.09 668
Partnering .................................................................... TC-2.06 92Patented Devices, Materials and Processes ............... GP-7.03 40
Paved Ditch Removal .................................................. 206 231Pavement
Broken Material ......................................................... 201.03.03 218Concrete Repairs ....................................................... 522 509
Continuously Reinforced Concrete ........................... 521 507Forms for Concrete .................................................... 520.03.04 499Hot Mix Asphalt ........................................................ 504 466
Markers, Temporary Raised ...................................... 104.03 156
828
http:GP-8.02
IND
Recommended