II--215/I215/I--515 Interchange515 Interchange

February 2003515

INTERSTATE

215INTERSTATE

Lake Mead Drive/ILake Mead Drive/I--515 Pre515 Pre--ConstructionConstruction

I-515

Lake

Mea

d Dr

ive

N

SW

E

QWE

Stage 1 ConstructionStage 1 Construction

Legend

Construction - Ultimate

Construction - Temporary Pavement

Built (Ultimate)

Temporary Pavement in Use

Step

hani

e R

oad

Gib

son

Roa

d

I-515

Lake Mead Drive

Res

erve

B

lvd.

FiestaArcadia

Park

N

S

W E

NE

QWE

Construct bicycle and pedestrian detourConstruct GS1-GS4 Ramp DetourConstruct PTIS, GS-W, and Pittman Railroad ChannelConstruct temporary pavement for Lake Mead DriveReconstruct Gibson RoadBegin construction of I-515 “NE” ramp

Stage 1 ConstructionStage 1 Construction

QWE

Bicycle/Pedestrian Detour Bicycle/Pedestrian Detour Construct Soil Nail Walls at the I-515/UPRR Bridge

Lake Mead Drive

Res

erve

Blv

d.

I-515

Las Palmas Entrada

Add Bicycle Lanes to Reserve Boulevard

Construct Bicycle PathG

ibso

n R

oad

Fiesta

ArcadiaPark

Bicycle/Pedestrian Legend

Construct bicycle path

On street bicycle lanes

Soil Nail Walls at I515/UPRR

Bridge

Bicycle Path

Bicycle Lanes

N

S

W E

QWE

Pedestrian Bike PathQWE

Widening Reserve Blvd.

QWESoil Nail Wall

QWE GS1-GS4 Detour

GSW Box CulvertQWE

PTIS Box CulvertQWE

Reconstruct Gibson RoadQWE

Stage 2 DetourQWE

Stage 2 ConstructionStage 2 Construction

Start construction of “SW”, “SE”, “WN”, and “WS” ramps off-lineContinue construction of “NE” ramp Construct Tie-Back WallStart construction of “EN” rampConstruct “NW” ramp complete Construct I-215/Lake Mead Drive

QWE

Columns for SW, EN, & NW RampQWE

Wall 108QWE

G-1465 StructuresQWE

EN Ramp Steel ErectionQWE

PCCP on I-215 MainlineQWE

Construct tie-back wall along Lake Mead Drive at the I-515 bridge

Stage 2Stage 2II--515 Interchange 515 Interchange ConstructionConstruction

Lake Mead Drive

Res

erve

Blv

d.

I-515

Las Palmas Entrada

Fiesta

Legend

Construction - Ultimate

Construction - Temporary Pavement

Built (Ultimate)

Temporary Pavement in Use

ArcadiaPark

Tie-back wall

N

S

W E

NE

QWE

Tie-Back WallQWE

Widen I-515 bridge

Construct tie-back wall along Lake Mead Drive at the I-515 bridge

Stage 2Stage 2II--515 Interchange 515 Interchange ConstructionConstruction

Lake Mead Drive

Res

erve

Blv

d.

I-515

Las Palmas Entrada

FiestaArcadiaPark

Legend

Construction - Ultimate

Construction - Temporary Pavement

Built (Ultimate)

Temporary Pavement in Use

N

S

W E

NE

QWE

I-1464 BridgeQWE

NW Ramp CompleteQWE

Finish construction of the “EN” rampStart construction of the “ES” rampFinish construction of I-215/Lake Mead DriveConstruct Gibson ramps 2 and 3

Stage 3 ConstructionStage 3 Construction

QWE

NW Ramp / G-1958 BridgeQWE

ES Frame 2QWE

Finish construction of the “SE” and “ES” rampsComplete “WS”, “SW” and “WN” ramps

Stage 4 ConstructionStage 4 Construction

QWE

End of PresentationEnd of PresentationThank You!Thank You!