HOUSTON PUBLIC WORKS | TRANSPORTATION & DRAINAGE OPERATIONS

DENVER HARBOR (Phase 1)ROADSIDE DITCH REHABILITATION PROJECT

ROADSIDE DITCH REHABILITATION

WHERE

2

Project Limits:

Alderson St. (North)

N. Wayside (East)

Harbor St. (West)

Eagle Pass (South)

ROADSIDE DITCH REHABILITATION

PROJECT GOAL

3

Improve drainage by

December 2019

INCREASE

DITCH

CAPACITY

RE-ESTABLISH

DITCHESREPLACE

CULVERTS

ROADSIDE DITCH REHABILITATION

PROJECT GOAL

4

BEFORE AFTER

ROADSIDE DITCH REHABILITATION

PROJECT GOAL

5

~Natural Ground

New

Culvert

New Ditch Flowline

New

Culvert

New

Culvert

New

CulvertNew

Culvert

ROADSIDE DITCH REHABILITATION

BLOCKED CULVERTS (Existing Conditions)

6

ROADSIDE DITCH REHABILITATION

7

SILTED DITCHES (Existing Conditions)

ROADSIDE DITCH REHABILITATION

8

STANDING WATER (Existing Conditions)

ROADSIDE DITCH REHABILITATION

9

OBSTRUCTIONS IN THE RIGHT-OF-WAY

ROADSIDE DITCH REHABILITATION

10

FLOODING

Approximate areas where

flooding was reported

(based on FEMA data)

ROADSIDE DITCH REHABILITATION

CITY OF HOUSTON

Finalize Construction Plans

Notify Property Ownersof obstructions in the Right-of-Way

Start Construction

~July 2019

NEXT STEPS

11

What You Need to Do

12

remove fence and

other obstructions in

the right-of-way

document existing

conditions & remove

special landscape

Who to Call

13

311orpwecip@houstontx.gov

HOUSTON PUBLIC WORKS | TRANSPORTATION & DRAINAGE OPERATIONS