Heartbeats. More than 1.5 billion heartbeats per second

Preview:

Citation preview

heartbeats

More than1.5 billion heartbeats per second

Are the heartbeats beingused in the right way ?

NOT REALLY

Rediscovering HUMAN ENERGY

WHATDOWEDO?

DesignThinking

We finally ended up defining personas

Aarnav

5 years oldStudying in Pre School

ST.Paul’s

Madhavan

20 years oldStudying in Dayanand

Sagar

Manjunath

40 year oldWorking in mindtree,software

developer

Paul

Retired Professor

What is the problem

MONOTONOUS LIFE

IT IS UNSAFEUNHEALTHY

GIVE BACK SOMETHING

Wacky IdeasImprove

the mood

of the park Energy Meter

inside park

Energy

Saving

Dashboard

Community

Competition

s

Skipping

competition

Let there

be some

fun!Juke Box

Change

the kids

area

RandomF

unction

Capture

the energy

spent

Is there an existing solution

Let’s search(re)

Post hard workDo we have a solution yet?

What does it take to implement

Idea sounds good

But, where is the money?

Let’s work outthe math now

Research site

Koramangala post office park

ExistingStatistics

36 Street Lamps with one 75WHP Sodium Lamp each

30 Street Lamps on the lanesleading to the park

Let’s Addsome Noise

Total power consumption per unit 123 Watts

Annual power consumption for park lighting14.8 M Watts

How much does it cost

Yearly cost for lighting up the parkRs.10,36,00,000/- (@Rs.7/unit)

Yearly cost for lighting up the parkRs. 5,90,99,040/- (@Rs.4/unit)

SPARKimplementation

47 Street Lamps with one 112W LED lamp each

Annual power consumption for park lighting - 12.32 MWatts

@50 people walking 10 laps each day

Annual energy generation per tile would be 1.5 MWatts

SPARKimplementation

A total of 16 tiles would generate enough power to:

Power 47 LED Street Lamps in the ParkPower the dance floor for the Children’s Play AreaPower the digital message displaysPower 24-30 street lamps on lanes leading to the park

SPARKimplementation

Some math againRs.32,00,000/- for 5 years (lifespan of each tile is a minimum of 5 years in heavy traffic load scenario)

Rs.12,80,000/- as AMC for 5 years @10% /yr

Rs.44,80,000/- in total

SPARKimplementation

Annual Cost

Rs 8,96,000SPARKimplementation

Savings per year

@Rs.4/unit

Rs.5,82,03,040SPARKimplementation @Rs.7/unit

Rs.10,27,04,000

Who is going to fund us?The CSR community

SPARKimplementation

How much is available?@0.25% of CSR amount for the top8 big guns Rs.56,59,950

SPARKimplementation

What’s Next

CSR from CorporateGovernment

Create awarenessDream ON!

Get the sponsorship

Sort out the policies and approvals

Spread the word

Applausehttp://www.pavegen.com/http://www.sustainabledanceclub.com/http://senseable.mit.edu/copenhagenwheel/www.thefuntheory.comMainakChakraborty @Green Power SystemsRajesh @ Make A Differencea footballers, an old man, an old lady, people in the park @ Koramangala Post Office Park

It doesn’t end here...