Harrisburg Overpass Construction Update September 1, 2015

Safety First

10,700 Man hours worked to date

• No lost time accidents to date

• No recordable accidents to date

West Bound Phase I Traffic Control

Traffic Plan Phase 1A

Safety First

East Bound Phase I Traffic Control

Safety First

School began August 24th

LOOK OUT FOR THE KIDS!

Speed limit 20 MPH

Traffic Control

• Traffic moved to middle of Harrisburg (1 lane each way)

• Access from Harrisburg:

• Side streets maintain access

• Some weekend and night intersection closures for utility work

• Advanced coordination with property owners for new driveway construction

Phase 1 – May 2015 to November 2015

Construction Activities

• New waterlines, storm sewers, sanitary sewers

• New private driveways, curbs

• New sidewalks

• New landscape

• New roadways

Union Pacific NE

SE SW

NW

Union Pacific

NE

SE SW

NW

Job Limit

Job Limit

Project Phase 1

Water Line: 900 LF Storm Line: 1100 LF San. Line: 0 LF

Water Line: 900 LF Storm Line: 750 LF San. Line: 130

Water Line: 950 LF Storm Line: 1200 LF San. Line: 0 LF

Water Line: 950 LF Storm Line: 700 LF San. Line: 370 LF

West Side Phase 1 Work SW Quadrant + NW Quadrant

Unexpected/Unknown Underground encounters so far: 31

Gas Lines

Unexpected Water Line

Barziza St. & Harrisburg Blvd. Caylor St. & Harrisburg Blvd.

North West Quadrant

Dorsey Dental

Lot and

House Field Office

Vacant Lot Abandoned

Strip Mall

Linwood St. Caylor St.

Storm Sewer Water Line

Warehouse Demolition Vacant Lot

Ware- House

Bent 1

Union Pacific

Bent 2 Bent 3 Bent 4 Bent 5

Bent 6

Existing Lines

Total Installed % Completed

1100 LF 900 LF

0 LF 0 LF

0% 0%

South West Quadrant

Linwood St. Caylor St.

Key Station #93

Houston Armature C&R Auto Sales Gameroom Warehouse

Union Pacific

Linwood St.

Storm Sewer Water Line Existing Lines

Total

1200 LF 950 LF

Bent 1 Bent 2 Bent 3 Bent 4 Bent 5

Bent 6

Installed % Completed

850 LF 950 LF

71% 100% (Service Taps Remaining)

East Side Phase 1 Work NE Quadrant + SE Quadrant

Unexpected/Unknown Underground encounters so far: 59

In front of Value Village

In front of Tornado Bus

Working under existing power lines

North East Quadrant

Hendrick Grain Co. Storage

Yard

Value Village 65

th S

T.

66

th S

T.

9

Cesar Chavez Blvd.

Popeye’s, Gas Station, Washateria

Tornado Bus Co.

Vacant Lot

8 10 7 6 5

Sanitary Line

Union Pacific

65

th S

T.

66

th S

T.

Hu

ghe

s

ST.

Cesar Chavez Blvd.

Storm Sewer Water Line

Existing Lines

Total Installed % Completed

750 LF 900 LF 130 LF

550 LF 900 LF 110 LF

73 % 100 % (Service Taps Remaining) 85 %

South East Quadrant

65

th S

T.

66

th S

T. Cesar

Chavez Blvd.

Jorge’s Car and Truck

#2

Vacan

t Lo

t Texas

Belting

Pegasso Bus

Tours

Marbella Banquet

Hall

Chonchino Auto Sales

Guanajuato Barber

Shop #2

Taqueria Tierra

Caliente

Family Dollar Store

10 9 8 7 6

5

Union Pacific

Cesar Chavez Blvd. 6

5th

ST.

66

th S

T.

Sanitary Line

Storm Sewer Water Line

Existing Lines

Total Installed % Completed

750 LF 900 LF 240 LF

0 LF 30 LF 0 LF

0 % 1 % 0%

Paving Phase 1 West Side

Fast Track Paving for Intersections Phase 1 Access Roads Sidewalks Asphalt

Paving Phase 1 East Side

Fast Track Paving for Intersections Phase 1 Access Roads Sidewalks Asphalt

MSE Wall Mock-Up

Thank you See you in November