GPRS FOR IBERDROLA SMART GRID STAR
EUTC Utility -Telecom Workshop,
10th April 2013
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 2/16
2
Index
1. Iberdrola Smart Grid deployment
2. 2G/3G connectivity critical requirements3. Technical evaluation by Iberdrola
4. Conclusions
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 3/16
3
Iberdrola Smart
Grid deployment
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 4/16
4
Iberdrola SG deployment
Global Smart Grid approach
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 5/16
5
Iberdrola SG deployment
SG Services
Remote Metering
NIVELBÁSICO
Sec. Subst.Level
MONITORED
Sec. Subst.Level
AUTOMATED
•
MV measurements• LV measurements• Directional Faultdetection• Alarms
+MONITORED level
Remote control
+
Sec. Subst.Level
BASIC
Automation
+
Legal Mandate Opportunity Operational needs
Remote Metering
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 6/16
6
Iberdrola SG deployment
SG Architecture – Only one telecommunication network
Head End
Private, Fixed /
Mobile Network
PLC:
PRIME
PLC: MV
(BPL)
S
S
PUBLIC
NETWORK
Public
Network
Public NetworkPublic
Network
Fixed/Mobile Public
Network
PLC:
PRIME
PLC:
PRIME
SS
SS
SS
BACKBONE
MPLS/SDH/
FO
PRIME
BPL
ACCESS
Public?
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 7/167
Iberdrola SG deployment
2G/3G for SG deployment
2G/3G
Secondary Substation
Reclosers
Primary Substations
• High coverage
• Deployment speed
• Third party Operator dependence
• Exposed by traffic generated by
public mobility applications
• Reduced bandwidth
DisadvantagesAdvantages
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 8/168
Iberdrola backbone
interconnection 2
Iberdrola backbone
interconnection 1
Iberdrola SG deployment
2G/3G Architecture
Secondary Substation
Secondary
operator
Primary
operator
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 9/169
2G / 3G
connectivity criticalrequirements
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 10/1610
2G / 3G Critical requirements
Requirements Details
Mobile technology
roadmap
2G planed maintenance/ 3G plans
Base Station / Node B
battery autonomy
3 hours at least
Minimum bandwidth
guaranteed
4 kbps symmetrical al least for SCADA
The electrical service is an essential service
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 11/1611
2G / 3G Critical requirements
Requirements Details
Differentiation for eachtype of service - QoS
Two classes of services at least:• SCADA (high priority)
• AMM (low priority)
Management • Supervision integration
• Service inventory
• Traffic reports
• Logistic adaptation
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 12/1612
Technical
Evaluation byIberdrola
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 13/1613
Technical evaluationRequirements Iberdrola
evaluation
Notes
Mobile technology
roadmap
3G coverage will probably reach existing
2G coverage in the next two years
Base Station / Node B
battery autonomy
Require new investment
Minimum bandwidth
guaranteed
Not possible to guarantee
Only a maximum probability in which
bandwidth is less than 4 kbps could beoffered
Differentiation for each
type of service - QoS
Not possible. It should be resolved in
the customer side
Management Covered by new mobile M2M platforms
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 14/1614
Conclusions
8/13/2019 Gprs for i Be Rd Rola Smart Grid Star
http://slidepdf.com/reader/full/gprs-for-i-be-rd-rola-smart-grid-star 15/1615
2G/3G could be used for SG but there is a long way to go
• Regarding mobile technology, 3G will be used where available
•New mobile platforms adapted to M2M provide required managementcapabilities
• Required investment in Base Station / Node B batteries could be high
• There are the following pending issues:
• Prioritization mechanisms in 2G/3G are not adapted to SCADA
requirements
• There are not QoS capabilities
Conclussions