GuidanceThroughout this template there are links to relevant sections in the on-line CPWF M&E Guide, CPWF Handbook
andCPWF Standard Clauses and Proceduresthat provide guidance, templates and examples.
Submit the report to your Basin Leader (or MT lead in the case of the coordination project) by e-mail.
1. Progress made during BDC inception:
1.1 Achievements
Please describe your major research and process achievements and how they contribute to the BDC
The GBDC has almost completed staff recruitment with few exceptions, and subsequent hiring of consultants
will proceed as per need of each project. Formal agreements with most of the partners have been completed.
All BDC projects have started activities in the field in collaboration with their partners.
The G1 project produced preliminary land cover maps of boro, aus and aman1
seasons in October 2011. Al
test sites geo-referenced and characterized and started to exchange data with Institute of Water Management
(IWM) and Local Government Engineering Department (LGED).
The G2 project established research trials in July, 2011, in three polders with high (polder 3), medium (polder
30) and low (polder 43/2F) salinity. The trials target a) appropriate variety selection of aman rice considering
water depth and production of rabi crops, b) aman- rabi cropping systems, and c) aman-boro cropping
systems. Due to heavy rains and high water depth, the anticipated numbers of plantings could not be made at
polder 30, of the 3 planned; only one was implemented. In polder 3 (high salinity), a good harvest of aman rice
is expected and to be followed by shrimp culture. In polder 30 and 43/2F, aman rice is successfully establishedwhich will be followed by rabi crops or boro rice as per design of the trials. The aman rice crop is currently in
the field and in good condition.
The G3 project has begun monitoring water governance and management in 5 polders of BWDB (polder 43/2F
30, 31, 24G, 3) and 4 polders of LGED (Jain kati, Latabunia, Bagerchara) .The LGED polders were added to the
original set of research polders in order to extend the research to include not only farmers initiatives in
fostering community management, but also how organizational structure and attitudes of implementing
agencies enable or constrain communities from fostering these structures. Till inception workshop few focus
group discussions have been conducted with the existing water user groups in polder 30 to understand
present water management systems being followed in the folders including the opportunities and limitations
of community management organizations in thee locality.
Using secondary data and primary information being generated by regular monitoring of salinity, water level,
water flow etc. and working with some FGDs and a preliminary survey, project G4 has successfully identified a
number of external drivers that influence decision-making in water resource management and governance in
1Boro is a rice season extends from mid Nov to mid march when dry-seasoned irrigated rice (high yield potentials) is grown. Aus is another rice season
extends from mid March to mid July when pre-monsoon rice (moderate yield potentials) crop is grown. Aman is traditional rice season extends from midJuly to mid Nov when monsoon rice (moderate yield potentials) is grown.
https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/8/3/2019 Ganges BDC Inception Report
4/72
the Ganges basin. Of the external drivers, population growth has been identified as primary. Sea level rise due
to climate change, change in water management practices, water sharing practices between riparian
countries, and water infrastructure development have been identified as other key drivers. G4 will conduct in-
depth investigation to assess the effects of these drivers on water resource and management issues in thecoastal Ganges basin for sustainable increases in productivity of crops and improvement of livelihoods of the
coastal people.
1.2 Bottlenecks
Please describe any process and research bottlenecks (and how they were / are being addressed)
Both Project G1 and Project G2 identified the delay in availability of funds provided from CPWF, that has
delayed their activities and milestones and request a 6 months no cost extension of the project. Lack of funds
has impeded IRRI NARES partners to implement planned activities for the aman 2011 crop. Hiring a PDF to be
based in Dhaka was initially difficult; however a suitable candidate has now been selected. Delay in finalizing
LoA between IRRI and WorldFish Center has slowed process of recruitment of WorldFish staff and activities of
BFRI and CIBA to some extent. Heavy rains and flooding this year, 2011, resulted in delays in transplanting of
some trials by G2. One out of three target transplanting dates on polder 30 was only possible due to deep
flooding.
Since the village roads and embankments are still wet and muddy, the Project G3 team finds the selected
polders and sub-project areas are still inaccessible and indicate that the conditions may delay fieldwork for a
short while. Socio-consult Ltd., a partner of G3, finds it difficult to receive funding from IWMI Colombo,
because of introducing value added tax (VAT) on remittance by bank at very high rate. IWMI is requested to
explore how to overcome this situation through its Finance Department.
The available of water resources data, land use and demographic information from the Indian part of the
Ganges basin and knowledge of their future water resources plan have been identified as the key challenge by
Project G4. IWMI, a partner of G4, is expected to provide available data on water flow, rainfall, water-use,
land-use, population, water plans and policies in the upstream region of the Ganges basin and its future
perspectives.
8/3/2019 Ganges BDC Inception Report
5/72
1.3 Insights and learning
Please share your main insights and lessons learned during the inception period
The inception period may be treated as a 6-month pre-project stage, which would then be followed by athree-year project period. The Ganges basin is a complex environment as the research team needs to work in
low, medium and high saline water and soils. Besides salinity, flooding conditions within polders and
across the polders varies, and variable scenarios between seasons and years, besides the difference in
topography. There are complex social and economic circumstances of households and between genders that
pose a significant challenge in developing simple solutions to cropping system/production technologies
rather there is a need for a flexible approach. For successful community management of coastal polders, it is
necessary to bring about organizational changes in implementing agencies as recognized by Project G3.
The external drivers as preliminarily identified by Project G4 include increased population, water pollution
inadequate planning and management of trans-boundary waters; climate change and inefficient water
management projects-all these may cause reduced availability of usable freshwater. Therefore, it is necessaryto assess the availability and productivity of water for agriculture and aquaculture purposes in Bangladesh. It
is learned that only one crop i.e. transplanted aman was grown in the pre-polder conditions and in the post-
polder conditions rabi crops like vegetable, oilseeds and boro (limited area) are grown along with aman crops
However, there is a general trend of reducing the usable area inside the polders due to subsidence, silted up
rivers & canals, inefficient and inadequate water management.
1.4 Partnerships
Please describe partnerships entered into and their relevance to BDC goals
Project G1 has signed agreements with LGED and IWM, which will give access to expertise and spatialinformation required for the objectives of G1. SRDI has agreed on terms and will sign the agreement soon
Each of these partners has expertise in key thematic areas for the G1 project to deliver important spatia
information to the project and feedback on the extrapolation domains and landuse maps that G1 will
produce.
Project G2 has signed agreements (LOA) with BRRI, BRAC, WFC and the Indian Council of Agricultural Research
- Central Soil Salinity Research Institute (ICAR-CSSRI). As a partner ofProject G2, BRRI will be responsible for
carrying out all the rice varietal evaluation work in Bangladesh. This is essential for the identification of
improved varieties for different water conditions across the coastal zone, including varieties with short
duration which allow cropping system intensification. BRRI is expected to play a critical partnership role in the
design and evaluation of intensive triple rice and rice-rice-rabi cropping systems on-farm and on-station (BRRexperimental stations). WFC will provide expertise and be actively involved in aquaculture and homestead
production system activities. WFC have technologies for brackish and fresh water systems aquaculture,
including rice + aquaculture, rice in rotation with brackish water aquaculture, year- round brackish water
aquaculture, and homestead ponds. CSSRI will be responsible for all similar rice varietal evaluation and
cropping system work in West Bengal, India. BRAC will bring experience and expertise to Project G2 on the
subjects of production of high value rabi crops and cropping system intensification (triple rice, rice-rice-rabi) in
Barisal, where they are based locally and therefore able to play an important role in the on-farm work in
8/3/2019 Ganges BDC Inception Report
6/72
polder 43/2/F. BFRI & CIBA will provide research outputs under a subcontract with WFC. BFRI will be actively
involved in aquaculture research in consultation with WFC, starting in the winter season 2011/2012. CIBA will
lead the aquaculture research in the brackish water part of the Ganges delta in India. It is expected that CIBA
will also play a role in outreach to policy makers and development actors within India to facilitate uptake ofresearch and achievement of BDC goals.
Socio-consult Ltd. is the main partner in Project G3 and is scheduled to undertake most of the fieldwork under
the close supervision of an IWMI scientist. They have experience working in BWDB polders and also
implemented the IPSWAM project. IWM will provide GIS maps and help with participatory mapping exercises.
Project G3 is expected to sign an agreement with the Bangladesh Agricultural University regarding the role of
students and will finalize an MOU by December 2011.
Project G4 is led by the Institute of Water Modelling (IWM) in partnership with IWMI, IWFM-BUET and BWDB.
The International Water Management Institute (IWMI) is a major player in water management research in the
Indus-Ganges Basin, with the goal of contributing to the vision of A Food Secure World for All. The Institute ofWater and Flood Management (IWFM) of Bangladesh University of Engineering and Technology (BUET) is a
premier institute for the advancement of knowledge and development of human resources in water and flood
management. Bangladesh Water Development Board (BWDB), a government institution under the Ministry of
Water Resources, is a major stakeholder for water management and governance in Bangladesh. BWDB will
offer knowledge on agriculture, water governance, water and crop management, policies and strategies under
the MoU (already signed) with IWM.
Project G5 has signed an agreement with BRAC the largest NGO of the country to scale out of research
products and to advocacy in policy change of the Government. The World Fish Center, the implementing
agency of G5 has strong collaboration with many major partners involved in agriculture and aquaculture in
Bangladesh, including DoF, DAE, BWDB, BARC, BARC, BARI, LGED, SRDI etc. WorldFish has close relations withthe BFRI, which is the leading national research institution on fisheries development. It has been doing
research on brackish water aquaculture for the last 20 years. The institute has developed improved culture
technologies of shrimp, bi-culture of shrimp and fish, fish culture in the coastal seasonal ponds. Under CPWF
10 project, the institute developed rice cum shrimp/ fish culture technique and rice in rotation with shrimp/
fish culture in the farmers field.
1.5 Needs from the CPWF
Is there anything that the CPWF can help you with in terms of support to the BDC Program-of-Work? Please
specify where you think the help should come(e.g., from CPMT, CPWF KM team, CPWF Research team, TWGs,
elsewhere)
KM: TWGs, particularly the Resilience group, to include/ invite Ganges team members to participate in the
TWG activities and meetings. The aquaculture group of G2 is keen to join the Resilience TWG.
1.6 Other feedback
Please give any other feedback you would like to share, positive or otherwise
8/3/2019 Ganges BDC Inception Report
7/72
The excitement of the farmers at research site on polder 3 (land was used only for shrimp culture due to low rain &
salinity,) was noticeable, when they saw an excellent growth of rice seedlings in nursery in 2 ghers as demonstrated by
Project G2.
The delay in the formation of the GBDC Advisory Committee has been a concern, as expressed by Project G3. Projec
G5 has now initiated formation of a common advisory committee for all CGIAR projects in the country with provision of
sub-committees as appropriate for each project. The ToR of the committee has been drafted and being shared among
project leaders of Ganges BDC. The members of earlier CSISA committee are to be included in addition of members from
water sector and policy planning. The formation process is expected to be completed by December 2011. A consultative
group/advisory committee that meets twice a year to interact, exchange and share experience/ knowledge generated
may be helpful. During inception workshop all concerned supported regular bi-monthly skype/online meeting in which
all PLs (based in or outside Bangladesh) share experience, discuss and provide guidelines / inputs. GBDC research is an
outcome based program and its success requires proper integration among all projects from Projects G1 to G5 as well as
proper up-scaling strategies.
2. Evaluation of BDC technical projects
Please evaluate the BDC technical reports on the basis of the evaluation questions given below. Carry out a self-evaluation for your
own coordination and change project. Cut and paste in the following symbols to register your level of agreement to the statements
in the table below. Refer to Section 2 of the respective projects Inception Report while doing so.
= exceeds expectations
= meets expectations
= barely satisfactory good enough not to hold up next tranche payment but there are issues that needdealing with by time of next progress report
= unsatisfactory -- serious issues exist that require discussion with MT before release of next tranchepayment
2.1 Compliance with contracting requirements
Checklist of whether projects have provided the
documents required by the CPWF to finalize
contracting
P1 MT P2 MT P3 MT P4 MT P5 MT
a. The project has made intelligent and appropriate
changes to its project proposal reflecting what it has
learned during the inception phase in negotiations
with partners and elsewhere
b. The projects outcome logic model is plausible,
realistic, understandable and consistent with the
8/3/2019 Ganges BDC Inception Report
8/72
project proposal
c. The project has developed a milestone plan in
which it has identified 8 to 12 acceptable milestones
for delivery in the next year
d. The project has provided baseline plan, outcome
targets and identified measurable outcome indicators
for two to four of its main outcome pathways
e. The project has updated its Gantt Chart to reflect
changes to its project proposal and the Gantt chart is
consistent with the milestone plan
f. The changes (if any) that the project has made to
its budget are acceptable to project partners
g. The project has provided the signed MOUs
necessary for the project to deliver on its work plan
h. The project has provided a 3rd
party intellectual
asset audit
NA NA NA NA NA
8/3/2019 Ganges BDC Inception Report
9/72
3. High pointsThis is your opportunity to highlight anything particularly worthwhile, noteworthy or significant that a project has done.
It is space to explain how projects may have exceeded expectations.
3.1 Project 1
High points, significant achievements, expectations exceeded
BL: Project G1 has formulated agreements with important partners that will bring expertise to key
thematic areas and deliver important spatial information and feedback on the extrapolation domains
and land use maps that it will produce.
MT: G1 is well designed and clear. Despite having little time on the project the PL has been able to
attend key meetings and provide the required leadership. Long may it continue!
3.2 Project 2
High points, significant achievements, expectations exceeded
Project G2 has established strong partnerships to deliver its research products. Variety testing and
evaluation are well underway. Farmers are excited over the prospects of using new varieties in an area
where only shrimp has been produced in recent years due to low rainfall and subsequent increased
salinity. Important insights and lessons have been learned regarding the complexity of the environment
in the research area.
MT : G2 to be complimented on their fast start despite funding issues and for organizing field trips andinviting others along. G2 provide a positive demand pull on the GBDC as a whole and have been very
supportive to G5 in particular and the BL in particular.
3.3 Project 3
High points, significant achievements, expectations exceeded
BL: Project G3has been able to extend its research from studying farmers initiatives in fostering
community management to include how organizational structures and attitudes of implementing
agencies enable or constrain communities from fostering community-based organizations. This provides
an opportunity to learn what research initiatives work best and to evaluate research inputs. The
opportunity to participate with all the Ganges projects in joint fieldwork has been a very positive aspect
of the program.
MT: G3 appears to be settling down to do some quality research. The challenge for the project will be
to move beyond research into ensuring the use of the insight it will generate and the policies it will
recommend or support.
8/3/2019 Ganges BDC Inception Report
10/72
We welcome the change in research direction in response to learning and reflection from a field trip in
May. Key will be to continue to negotiate changes and the understanding of what G3 is doing with the
other Gs, especially G5.
3.4 Project 4
High points, significant achievements, expectations exceeded
BL: Strong partnerships have already been established by Project G4. The drivers that affect water resources in the study
area have been identified and substantial work has been carried out to date. Research has provided opportunity to
increase knowledge about the research area and the cropping systems there. This project is providing ample
opportunities to interact with other experts at home and abroad and to share knowledge, experience and technologies.
The bi-monthly meeting is also appreciated as an effective tool.
MT: G4 has some profound insights into polder management issues - of great relevance to water governance and farm
system improvement. If G1, G2 and G3 don't know about some of these issues, they should hear about them. G4 ha
made very good progress.
3.5 Project 5
High points, significant achievements, expectations exceeded. This is a self-evaluation to help the MT-lead
Project G5 is building robust partnerships that include initiatives for capacity building. Knowledge and progress sharing
meetings have been instituted to enhance communication among the Ganges projects and serve as a forum for
feedback. This will enable sharing of cross-cutting information and timely adaptation. Initiation of new channels ofcommunication for the G projects that included a wiki site, and use of the e-letter of CPWF will enable the rapid sharing
of relevant information and strengthen ties among the Ganges projects. Streamlining can be achieved through the
establishment of a single advisory committee that replaces individual advisory committees for various related projects.
MT: We echo the self-assessment above. The bi-monthly meetings are welcome initiative. The advisory committee
issue needs to be resolved to the satisfaction of G2. Not sure whether Gs are asking for individual advisory committees
so much as for one of the appropriate size and scale to be interested in what the GBDC is doing.
8/3/2019 Ganges BDC Inception Report
11/72
4. Issues and remedies
Provide details of issues flagged in the table above and describe any other known issues.
4.1 Project 1
Please explain the issues that need dealing and suggest solutions
BL:Project G1 needs to come in immediate agreement with SRDI to facilitate detailed field survey to
produce essential salinity mapping. PL of G1 is to release fund against SRDI by Jan 2012 so that SRDI can
complete the soil survey for salinity mapping by April 2012.
MT: G1 is suggesting incorporating a 6-month inception period in the project schedule, meaning the
project will officially start its activities after 6 months. Due to the delayed release of funds, G1 was
unable to implement some of its deliverables for the first six months.
Action Points
No. Action Point Assigned person Deadline
1 Respond to BLs point above Project leader Completed soil
survey by April 2012
2 MT to consider request for 6-month extension MT February
2 Submit a revised milestone plan and Gantt chart
assuming that a 6-month no-cost extension is
granted
Project Leader After Feb before
next report
3 Prepare financial report and invoice for the 2nd
payment
IRRI Finance ASAP
4 Submit other documents that were not included in
the inception report: CVs of other team members,
signed LOA
Project Leader By next report
5 Submit third-party IP audit Project Leader By next report
4.2 Project 2
Please explain the issues that need dealing and suggest solutions
BL: Cropping systems research need collaboration with BARI (Bangladesh Agricultural Research
8/3/2019 Ganges BDC Inception Report
12/72
Institute). BRRI (Bangladesh Rice Research Institute) is partner of G2 but BARI is not. So G2 could
establish collaboration with local BARI station (Benerpota, Satkhira) by Feb 2012 through MoU,
workshop, knowledge sharing etc. BARI can supply seeds of the latest suitable varieties of pulse,
oilseeds, maize etc. to be planted after wet-seasoned rice in Polder 30 and 43/2F. Seed productionprogram can be supported by BARI and BRRI
MT: Role of BSMRAU not clear from the report
Action Points
No. Action Point Assigned person Deadline
1 Respond to BLs request to establish collaboration
with BARI
Project Leader By Feb 2012
2 Clarify role of BSMRAU Project Leader By next report
3 Update project workbook (contact sheet) to include
some project team members
Project Leader By next report
4 Prepare financial report and invoice for the 2nd
payment
IRRI Finance ASAP
5 Submit other documents that were not included in
the inception report: CVs of other team members,
signed LOA
Project Leader By next report
6 Submit third-party IP audit Project Leader By next report
4.3 Project 3
Please explain the issues that need dealing and suggest solutions
BL: Project G3 has too many partners; an appropriate mechanism for dealings with them should be
explored by G3. The field data collection (FGD and KII) on water governance and management is to be
expedited. Selection of research partner is to be completed by Jan 2012. FGD and KII report is to be
produced by partner by Feb 2012.
MT: One of the options to explore to reduce the transaction cost of transferring funds to a Bangladeshi
institution is to make either WFC or IRRI as G3 partner and ask them to administer funds or serve as
conduit of funds (if this is legally accepted within the CG system). Compare first the overhead cost
8/3/2019 Ganges BDC Inception Report
13/72
versus the VAT on overseas remittance.
Action Points
No. Action Point Assigned person Deadline
1 Respond to BL points above Project Leader By next report
2 Respond to MT suggestion above Project Leader By next report
3 Update project workbook: OTIP is incomplete;
Camelia is not in the time allocation, therefore its
not clear in the budget summary where her budget
would come from
Project Leader By next report
4 Submit other documents that were not included in
the inception report: CVs of other team members,
signed LOA, 3rd Party IP audit
Project Leader By next report
4.4 Project 4
Please explain the issues that need dealing and suggest solutions
BL: Long term water flow data in upper Ganges basin (Indian part) is needed for modeling of water
resources in the Ganges basin. IMWI is to take action to collect long term water flow data preferably from
research stations, and other development organizations by May 2012 if not possible from Government
sources.
MT: Regarding the OLM, suggest the farmers or the respondents in the focus group discussions and
consultations should also be included as actors. Focus group discussion is a two-way learning process we
get information from them, and they learn from our analysis of their responses. The change is they will
become more aware of the effects of external drivers to their sources of livelihoods.
Action Points
No. Action Point Assigned person Deadline
1 Respond to BL points above Project Leader By next report
2 Respond to MT suggestion above Project Leader By next report
8/3/2019 Ganges BDC Inception Report
14/72
3 Update project workbook: write the status of
progress in the milestone plan
Project Leader By next report
4 Prepare financial report and invoice for the 2
nd
payment if not done so already
IWM Finance ASAP
5 Submit other documents that were not included in
the inception report: CVs of other team members,
signed LOA, 3rd Party IP audit
Project Leader By next report
6 Tighten up the OTIP Plan with implementation in
mind
Project Leader By next report
4.5 Project 5Please explain the issues that need dealing and suggest solutions. This is a self-evaluation to help the MT-lead
BL: The projects (G1-G5) calendar/Gantt chart has been extended in majority cases for three months
considering the delayed start of the projects and as per output of inception workshop. Accordingly the
milestone plan has been updated and CPWF is requested to please consider the extension and approve it as
well by Dec 2011. Furthermore, the Inception workshop participants have requested that a six month no-
cost extension to the Ganges program be considered by CPWF management. Ganges project 5 therefore
requests that CPWF management consider their request, and circulate the extension by Mar 2012.
MT: G5 is about coordination and enabling change which is a different sort of project requiring different
skill sets its staff than the normal CG project. This has been well understood. Nevertheless appointing the
right people for the jobs has proved difficult and has delayed G5 growing into the leadership role required
of it. Sorting this out must be the main priority for next reporting period.
Should share the TOR of the other consultants with other teams so that theres a common understanding
on what we are asking them to do for us. This is also to ensure that the Indian part of the BDC is not
compromised.
Action Points
No. Action Point Assigned person Deadline
1 Resolve any outstanding personnel issues in G5 WorldFish mmgt By next report
2 Find a way of meeting PLs request to be included in
regular planning meetings
Basin Leader By January
8/3/2019 Ganges BDC Inception Report
15/72
3 Resolve issue over GBDC Advisory Committee to
G2s satisfaction
Basin Leader By February
4 Approve change to milestone plan MT ASAP
5 Approve a cross-the-board six-month no-cost
extension for GBDC
MT March 2012
6 Respond to MT suggestion above Project Leader By next report
7 Update project workbook: write the status of
progress in the milestone plan
Project Leader By next report
8 Submit other documents that were not included in
the inception report: CVs of other team members,
signed LOA; 3rd Party IP audit
Project Leader By next report
9 Tighten up the OTIP Plan with implementation in
mind
M&E officer By next report
8/3/2019 Ganges BDC Inception Report
16/72
5. Overall project performance
Based on Sections 2, 3 and 4 please make give each project an overall rating. Cut and paste in the following symbols to
register your level of agreement to the statement in the table below. In the P5 space, do a self-evaluation.
= exceeds expectations
= meets expectations
= barely satisfactory good enough not to hold up next tranche payment but there are issues that needdealing with by time of next progress report
= unsatisfactory -- serious issues exist that require discussion with CPMT before release of next tranchepayment
P1 P2 P3 P4 P5
The project is making good progress and performing well
Final remarks can be an explanation of an overall rating or anything else
Overall, the Ganges program has moved forward significantly in the Inception Period, with good progress in most
projects, despite the lack of formal agreements and funds in some cases. The different project teams are also generally
working effectively, and increasingly as a good team within an integrated Ganges program. Project G2 set all designed
experiments in the field without receiving funds from CPWF. Project G3 completed the agreement with partners except
with BAU although only one FGD has been conducted out of a targeted 70. Project G4 completed the agreement with
relevant partners, has conducted FGDs and consultations to identify the drivers. T
8/3/2019 Ganges BDC Inception Report
17/72
Date: October 25, 2011 Basin leader: Dr. Nowsher Ali Sarder
Date: December 15, 2011 MT lead: Dr. Boru Douthwaite
8/3/2019 Ganges BDC Inception Report
18/72
6. Annexes
8/3/2019 Ganges BDC Inception Report
19/72
Annex 1: Project 1 Inception Report
CPWF Project Inception Report
Project Title: Resource profiles, extrapolation domains, and land-use
patterns
Project Number: G1
Project Leader: Andy Nelson
For submission to the
Date: October 20, 2011
8/3/2019 Ganges BDC Inception Report
20/72
1. Progress made during project inception
1.1 Achievements
- Agreements signed with two national partners, third agreement pending.
- Preliminary land-cover maps of Bangladesh developed for the 2010-11 boro, aus, and aman seasons.
- Test sites geo-referenced and characterized.
1.2 Bottlenecks
- No funds were provided from CPWF during this period, which has delayed all activities and milestones under objectives
1 and 2 by 6 months.
- Difficulty in hiring a PDF to be based in Dhaka. After receiving 40 applications and two rounds of review, we have finally
identified a suitable candidate and are about to make an offer.
- We have not been able to agree on terms with BWDB. We will discuss this with IWM, since they have a long-standing
collaboration with BWDB, and investigate options for contracting to BWDB through IWM.
1.3 Insights and learning
- Lack of funding has stymied progress to date.
- I would suggest that future projects treat the inception period as a 6-month preproject stage, which would then be
followed by a three-year project when work can be expected to take place.
- This inception meeting will be the third related to this project and yet little has been achieved to date to merit three
international meetings, which seems like an unnecessarily high transaction cost.
1.4 Partnerships
- We have signed agreements with LGED and IWM, which will give us access to expertise and spatial information
required for the objectives of G1. SRDI has agreed on terms and we will sign the agreement with them in the coming
days. Each of these partners has expertise in key thematic areas for the G1 project and they will also deliver important
spatial information to the project and feedback on the extrapolation domains and land-use maps that G1 will produce.
1.5 Other feedback
- The delay in funding, approximately 6 months, necessitates a no-cost extension of the project to allow us to complete
delayed activities. The lack of funds has meant that almost no progress has been made on the first two objectives thatwere due to be reported on.
- I would like to request a no-cost extension of 6 months to accommodate this delay and to adjust the milestones
accordingly, in line with expected delays in the other G projects.
2. Compliance with contracting requirements
Documents required to finalize contracting requirements Where to find Updated and / or
8/3/2019 Ganges BDC Inception Report
21/72
and for next tranche payment it annexed?
1. Updated proposal reflecting changes negotiated with partners
during the inception period (if any) and cover note explainingwhat has changed
Annex 1 to this
report
No change, not
annexed
2. Updated Project Workbook reflecting changes negotiated
during the inception period:
Annex 2 to this
report
Updated
Completed contact sheet Annex 2 to thisreport
Contact details for
LGED updated
Updatedoutcome logic model Annex 2 to this
report
No change
Milestone plandeveloped for the duration of the project
with particular emphasis on the next year)
Annex 2 to this
report
No change, but
includes a request to
move all milestones
back 6 months to
accommodate the
delay in funding.
Baseline plan, outcome targets and outcome indicators
for projects main two outcomes
Annex 2 to this
report
No change
Updated Gantt Chart Annex 2 to this
report
No change, but see
above for milestone
plan delay
Updated budget worksheets (CPWF will not increase your
budget; all changes beyond moving 5k must explained
and justified as comments in the respective budget
worksheets and in the financial report below)
Annex 2 to this
report
No change.
3. SignedMOUscorresponding to your proposal Annex 3 to this
report
LoAs with LGED and
IWM attached
4.Third-Party Intellectual asset audit Annex 4 to thisreport Not attached, third-party IP has not yet
been determined.
3. Needs from the CPWF
Quicker release of funds in the future. This delay is the major reason for the lack of activity to date.
https://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/indicator-and-milestone-planhttps://sites.google.com/site/cpwfhandbook/files-1/CPWF_Partnership_MoU_BDC_Mar10.DOC?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Partnership_MoU_BDC_Mar10.DOC?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Partnership_MoU_BDC_Mar10.DOC?attredirects=0https://sites.google.com/a/cpwf.info/handbook/files-1/CPWF_Annex5_ThirdPartyIPAuditForm.doc?attredirects=0&d=1https://sites.google.com/a/cpwf.info/handbook/files-1/CPWF_Annex5_ThirdPartyIPAuditForm.doc?attredirects=0&d=1https://sites.google.com/a/cpwf.info/handbook/files-1/CPWF_Annex5_ThirdPartyIPAuditForm.doc?attredirects=0&d=1https://sites.google.com/a/cpwf.info/handbook/files-1/CPWF_Annex5_ThirdPartyIPAuditForm.doc?attredirects=0&d=1https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Partnership_MoU_BDC_Mar10.DOC?attredirects=0https://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/outcome-pathways-and-outcome-logic-model8/3/2019 Ganges BDC Inception Report
22/72
4. Financial management
4.1 Summary financial report
Time2
2011 2011 2012 2012 2013 2013 Completion Reportand Final Audit for
project closure
Inception
Report
Progress
Report
1
Annual
Report
Progress
Report
2
Annual
Report
Progress
Report
(thousands of $US) US$ US$ US$ US$ US$ US$ US$
1
Value of tranche
payment received this
report period
-
2Value of tranchepayments received to
date
-
3Value of expenditures
for report period7
4Accumulative value of
expenditures to date7
5 Balance held against
cumulative tranche
payments
(7)
6
Value of committed
funds-
I certify that the summary financial report is correct
Chief financial officer:
Date:
2Adjust the dates to fit with our contract period
8/3/2019 Ganges BDC Inception Report
23/72
4.2 Project leaders commentary on the summary financial report
Please explain any significant commitments currently being held
Commitment is held against payment to which partners or providers? Amount USD Expected date of expenditure
No funds received. Nothing to report.
If you are over-spent / under-spent please explain why or any aspect of the financial progress of your project
that has or will affect progress:
No funds received. Nothing to report.
If you had moved budgets across line items please explain why:
No funds received. Nothing to report.
Any other comments about financial aspects of your project, and any advice you would like to receive:
No funds received. Nothing to report.
8/3/2019 Ganges BDC Inception Report
24/72
5. Annexes
Send annexes as separate attachments to the main report
Annex 1: Updated Project Proposal not updated, not attached
Annex 2: Updated Workbook and Worksheets attached
G1_AnnexA_Project_Workbook_DRPC2010-128_1011
Annex 3: MOUs signed with project partners attached
Signed LOA with IWM and LGED
Annex 4: Third-Party Intellectual Audit not attached, third-party IP has not yet beendetermined
8/3/2019 Ganges BDC Inception Report
25/72
Annex 2: Project 2 Inception Report
CPWF Project Inception Report
Project Title: Productive, profitable, and resilient agriculture and
aquaculture systems
Project Number: G2
Project Leader: Liz Humphreys
For submission to the
Date: October 20, 2011
8/3/2019 Ganges BDC Inception Report
26/72
1. Progress made during project inception
1.1 Achievements
Please describe your major research and process achievements (and how they contribute to the project andBDC)
Letters of Agreement (LoAs)
IRRI
Signed with
* Bangladesh Rice Research Institute (BRRI)
* Indian Council of Agricultural Research-Central Soil Salinity Research Institute (ICAR-CSSRI)
* BRAC
Finalized with World Fish Centre (WFC) (will be signed shortly)
WFC
Finalized with the two partners (signature pending completion of IRRI-WorldFish LOA)
* Bangladesh Fisheries Research Institute (BFRI)
* Central Institute for Brackishwater Aquaculture (CIBA)
Staff recruitment
* Change in leadership: E. Humphreys as PL effective 3 August 2011
* Dr. T.P. Tuong as consultant (contract in preparation)
* Dr. Manoranjan Mondal commenced with IRRI (Bangladesh) on 10 October 2011
* Yet to recruit one NRS for IRRI Bangladesh
* Yet to recruit two consultants for WFC Bangladesh (pending finalization of contract with IRRI)
Work planning
* Focus polders selected in freshwater region in Barisal Division (43/2/F), medium-salinity region in Khulna Division (30),
high-salinity region in Khulna Division (3).
* May 2011: 8-day field trip organized and conducted to focus polders to observe situation on the ground, hold
discussions with stakeholders (including farmers, NGOs, CSISA hub teams, local BWDB, BRRI, BFRI, and BRAC officers,
DAE, Water Management Groups/Associations), and select sites for on-farm and on-station cropping system and
crop/aquaculture system activities. In addition to G2 members (from IRRI, BRRI, BRAC, Bangabandhu Sheikh Mujibur
8/3/2019 Ganges BDC Inception Report
27/72
Rahman Agricultural University), there were participants from G1 (IRRI), G3 (IWMI, Socioconsult), and G4 (IWM, polder 3
only).
* Detailed work plans prepared for the evaluation of rice varieties, cropping systems/water management options,
crop/aquaculture systems, and aquaculture systems.
* Sampling strategy and tools developed for detailed assessment of all three polders, to be implemented during fourth
quarter of 2011.
* Several trips made to research and demonstration sites on all three polders to finalize site selection, implement
activities, and monitor progress.
* On-farm rice variety evaluation trials implemented at one location on each of the three study polders:
Polder 3 (rice variety evaluation; rice-aquaculture system)
Ten varieties were tested in the 2011 aman season under enhanced leaching (to lower soil salinity for rice) and farmers
traditional gherdrainage practices. There were two seeding dates (15 and 30 July) in the farmers gherpractice, with
target transplanting dates of 5-15 and 20-30 August, respectively. There was one seeding date (15 July) under enhanced
leaching practice with target transplanting date of 5-15 August. After rice, the farmers will grow saline-water shrimp,
and the G2 aquaculture team will introduce improved management, including polyculture
Polder 30 (rice variety evaluation; rice-rice-rice and rice-rice-rabi systems)
Eleven varieties were tested in the 2011 aman season. The initial plan was three sowing/transplanting dates, but only
one sowing (1 July)/transplanting (25 July) was achieved due to unusually high rainfall and deep flooding of 2540 cm
(more than seedling height). Transplanting was delayed slightly from the target date of 21 July because of deep water
after rain.
One site was also established for an aman-rabi cropping system trial (with BRRI dhan54). The main objective of this trial
is to demonstrate the benefits of early drainage, which will enable early establishment of the rabi crop. Our hypothesis
is that early establishment of the rabi crop will improve rabi crop production because it will mature earlier and escape
damaging rains in May-June. The second objective is to evaluate/demonstrate improved management options for the
common rabi crops on this polder (predominantly sesame, some mungbean), including line sowing and mulching.
One site was also established with BRRI dhan49 for an aman-boro demonstration of the fact (an output of PN10) that
boro rice can be planted in December (while water in the rivers is still fresh, and reducing the need for stored fresh
water within the polder to finish the crop off) and the risk of soil salinization increases later in the season once the rivers
become saline.
Polder 43/2/5 (rice variety evaluation; rice-rice-rice and rice-rice-rabi systems)
Eleven varieties were tested using three sowing dates (24 June, 15 July, and 6 August) (target transplanting dates of 15
July, 6 August, 27 August; actual transplanting 15 July, 23 August, and 9 September). Here also, transplanting was
delayed due to deep flooding caused by heavy rainfall, especially the second transplanting when seedling age was 39
days. The main reason was flooding due to heavy rainfall. The seedlings sown on 15 July were completely submerged but
recovered after flood recession; hence, transplanting was delayed from 6 to 23 August. We also had to delay the
seedbed for the third date and to reschedule sowing seeds for the third seeding date from 6 to 16 August.
8/3/2019 Ganges BDC Inception Report
28/72
As on polder 30, sites for aman-rabi and aman-boro cropping systems were successfully established according to plan.
For aman-rabi, two varieties (BRRI dhan33 and BRRI dhan53) of similar growth duration were used and the sowing and
transplanting dates were 6 and 29 August, respectively. For aman-boro, the variety was BRRI dhan54 and the sowing and
transplanting dates were 25 July and 18 August, respectively.
* On-farm sites established for T. aman-rabi trials (drainage management rabi species rabi crop management) on
polders 43/2/F and 30.
* On-farm sites established for T. aman-boro demonstrations (time of boro plantingto demonstrate the possibility of
early boro establishment to reduce the need for stored fresh water to finish the crop) on polders 43/2/F and 30.
* On-farm site established for rice/aquaculture systems in polder 3.
1.2 Bottlenecks
Please describe any process and research bottlenecks (and how they were / are being addressed)
* Lack of funds from CPWF to date has impeded the ability of IRRI NARES partners to fully implement planned activities
for the 2011 aman crop.
* Delay in finalizing LoA between IRRI and WorldFish has slowed process of recruitment of WFC staff and activities of
BFRI and CIBA to some extent.
* Heavy rain and a lot of flooding in the delta this year resulted in delays in transplanting of some trials (i.e.,
transplanting using older seedlings than the target age, 21 days, and we were able to implement only one of the three
target transplanting dates on polder 30 because of the deep flooding.
1.3 Insights and learning
Please share your main insights and lessons learned during the inception period
The complexity of the environments we are working in. Rather than simple low, medium, and high salinity
environments, we are dealing with salinity and flooding conditions within polders that vary considerably across the
polders, and between seasons and years. These are greatly affected by varying topography. On top of varied and
sometimes complex social and economic circumstances of households, the environment clearly represents a significant
challenge to the development of cropping system recommendations, and requires more dynamic and flexible solutions.
Huge amounts of flooding during the rainy season in 2011 on the polders due to
1. Lack of management (poor management) of sluices and flushing gatesletting water in when there was already too
much water there, not taking advantage of opportunities to drain excess water.
2. Lack of infrastructure separating low and high lands.
3. Damaged or missing infrastructure (embankments, sluice gates).
1.4 Partnerships
Please describe partnerships entered into and their relevance to project and BDC goals
8/3/2019 Ganges BDC Inception Report
29/72
WFC
Providing expertise and being actively involved in aquaculture and homestead production system activities; they are
essential to the development and evaluation of improved aquaculture management for brackish-water and freshwater
systems, including rice + aquaculture, rice in rotation with brackish-water aquaculture, brackish-water aquaculture
throughout the year, and homestead ponds. WFC is in charge of the administration/progress monitoring of all aquatic
and homestead production system activities.
BRRI
Responsible for carrying out all the rice varietal evaluation work in Bangladesh; essential for the identification of
improved varieties for the different water conditions across the coastal zone, including varieties with short duration that
will allow cropping system intensification.
Critical partner in the design and evaluation of intensive triple-rice and rice-rice-rabi cropping systems on-farm and on-
station (BRRI experimental stations).
BRAC
Experience and expertise in the production of high-value rabi crops, and in cropping system intensification (triple rice,
rice-rice-rabi) in Barisal, and staff are locally based and able to play an important role in the on-farm work on polder
43/2/F (which is somewhat remote from the BRRI experimental station).
CSSRI
Responsible for all the rice varietal evaluation and cropping systems work in West Bengal.
BFRI
Under subcontract with WFC, will be actively involved in aquaculture research activities, starting in the winter season2011-12.
CIBA
Under subcontract with WFC, will lead the aquaculture research in the brackish-water part of the Ganges delta in
India. It is expected that CIBA will also play a role in outreach to policymakers and development actors within India to
facilitate uptake of research, and achievement of BDC goals within India.
1.5 Other feedback
Please give any other feedback you would like to share, positive or otherwise* The willingness and ability of BRRI and BRAC to forge ahead with substantial parts of the 2011 aman activities despite a
lack of CPWF funding to date, by borrowing from other resources.
* The excitement of the farmers at our site on polder 3 (land has been used only for shrimp culture in recent years
because of low rain and thus salinity) when they saw the excellent growth of the plants in the seedling nursery for the
rice variety evaluation trials for planting in two ghers (one with farmer drainage management and one with improved
drainage management).
8/3/2019 Ganges BDC Inception Report
30/72
8/3/2019 Ganges BDC Inception Report
31/72
3. Needs from the CPWF
Is there anything that the CPWF can help you with at this point in the project? Please specify where you think
the help should come(e.g., from Basin Leader, Coordination Project, CPWF KM team, CPWF Research team,
TWGs)
The aquaculture team would appreciate a closer interaction with the TWG on resilience. Our research and
analysis of farming systems require more thought around resilience, and some dialogue with the TWG on
resilience might be helpful to develop practical indicators we could use.
8/3/2019 Ganges BDC Inception Report
32/72
8/3/2019 Ganges BDC Inception Report
33/72
4.2 Project leaders commentary on the summary financial report
Please explain any significant commitments currently being held
Commitment is held against payment to which partners or providers? Amount USD Expected date of expenditure
If you are over-spent / under-spent please explain why or any aspect of the financial progress of your project
that has or will affect progress:
The project has underspent against the budget because:
-Official project start was unrealistic (1 Apr 2011) but it needed to be dated as such then, because of the CPWF timeline;
it took time to develop LoAs and recruit staff
-The project did not receive funds from CPWF during this period, and thus could not transfer funds to partners
-Inability to implement everything planned for the first 6 months for the above stated reasons
If you had moved budgets across line items please explain why:
Any other comments about financial aspects of your project, and any advice you would like to receive:
8/3/2019 Ganges BDC Inception Report
34/72
5. Annexes
Send annexes as separate attachments to the main report
Annex 1: Updated Project Proposal
Annex 2: Updated Workbook and Worksheets
Annex 3: MOUs signed with project partners
Annex 4: Third Party Intellectual Audit
8/3/2019 Ganges BDC Inception Report
35/72
Annex 3: Project 3 Inception Report
CPWF Project Inception Report
Project Title:Water governance and community-based management
Project Number: G3
Project Leader: Dr. Aditi Mukherji, IWMI, New Delhi
For submission to the
Date: 11/15/2011
8/3/2019 Ganges BDC Inception Report
36/72
Guidance
Throughout this template, there are links to relevant sections in the on-line CPWF M&E Guide, CPWF
HandbookandCPWF Standard Clauses and Proceduresthat provide guidance, templates and examples.
Submit the report to your Basin Leader (or MT lead in the case of the coordination project) by e-mail.
In addition to this report, your project must send (i) a six-monthly statement of project receipts and
expenditures and (ii) an invoice for the payment of the next tranche directly to the CPWF Secretariat
(m.abeyesekere@cgiar.org). SeeStandard Clause 8.06for more information.
1. Progress made during project inception
1.1 Achievements
Please describe your major research and process achievements (and how they contribute to the project andBDC)
The G3 team undertook a joint fieldwork with other Gs from May 23rd to May 31st 2011. Based on this exploratory
fieldwork in 6 BWDB polders and 5 LGED sub-projects, G3 decided to broaden the scope of their study by including LGED
sub-polders. This also meant that we will now compare organizational approaches that BWDB and LGED takes towards
community participation and what one can learn from the other. This is a slight departure from our original research
plan which was to study farmers initiatives in fostering community management. We will now extend our research
portfolio to also understand how organizational structures and attitudes of implementing agencies enable or constrain
communities from fostering community based organizations. For this purpose, we will now do our fieldwork in 5 BWDB
polders and 4 LGED sub-projects. In terms of research, the following progress has been made so far:
1. Selection of BWDB and LGED sub-projects for fieldwork
2. Initial field visits in May-June 2011 and then again in July-August for understanding issues prior to formulation ofquestionnaires and focus group discussions.
3. Checklists and open ended questionnaires have been developed for interviewing community members,
WMA/WMCA members and LCS members.
4. These checklists have been pre-tested in Polder 20 and in Bagachra Badurgacha sub-project in October 2011.
Fieldwork will commence in November 2011.
5. We have received base maps of BWDB polders from IWM and the first step will be participatory mapping
exercise. We expect the 1st Phase of exploratory fieldwork will be finished by March 2012.
In terms of processes, the following progress has been made so far:
1. Signing of MOU with Socioconsult Ltd. and with IWM
2. Ongoing discussions with BWDB, LGED and BAU for signing of MOU and delineation of tasks and responsibilities.
3. IWMI has hired a consultant (Ms. Camelia Dewan) who will be based at World Fish Centre and work closely with
our partners. She will lead qualitative aspects of our work.
4. IWMI is also in the process of hiring another consultant who is trained in econometrics and will lead the
quantitative aspects of our work.
1.2 Bottlenecks
https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0mailto:m.abeyesekere@cgiar.orgmailto:m.abeyesekere@cgiar.orgmailto:m.abeyesekere@cgiar.orghttps://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0mailto:m.abeyesekere@cgiar.orghttps://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/site/cpwfhandbook/homehttps://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/https://sites.google.com/a/cpwf.info/m-e-guide/8/3/2019 Ganges BDC Inception Report
37/72
Please describe any process and research bottlenecks (and how they were / are being addressed)
- Selected polders and sub-projects are not fully accessible yet; village roads and embankments are still wet and muddy
due to rain this week. So this may delay fieldwork somewhat.
- Socio-consult is finding it difficult to receive funding from IWMI Colombo because of introduction value added tax
(VAT) on remittance by bank at very high rate; this was not foreseen when the budget was prepared. Deduction of VAT
could be avoided if the payment could be made from local bank account. IWMI needs to explore this option with its
own Finance Department.
- Since IWMI does not have an office in Bangladesh, hiring appropriate staff has been difficult. We have now hired one
consultant and will hire another in a months time. These two consultants will undertake research and provide day to
day support to our partners. The PL, who is based in New Delhi will undertake periodic (6 monthly) visit to Bangladesh
and provide overall intellectual leadership to the project.
1.3 Insights and learningPlease share your main insights and lessons learned during the inception period
For successful community management of coastal polders in Bangladesh, it is not enough to organize and train
communities, but it is also necessary to bring about an organizational change in implementing agencies themselves.
1.4 Partnerships
Please describe partnerships entered into and their relevance to project and BDC goals
- Socio-consult Ltd. They are our main partners and will undertake most of the fieldwork under close supervision of
IWMI scientist. They have experience of working in BWDB polders and implemented IPSWAM project.
-IWM will provide us with GIS maps and help us with participatory mapping exercises.
- We are currently discussing with Bangladesh Agricultural University regarding role of students and will finalize a MOU
with them by October 2011. This will provide the capacity building component.
1.5 Other feedback
Please give any other feedback you would like to share, positive or otherwise
- A very positive aspect of the project was the joint fieldwork by all Gs in May-June 2011.
- A consultative group that meets twice a year to take stock of progress will be helpful.
- There should be a monthly online meeting where all PLs (especially those based outside Bangladesh) can take stock
and discuss issues. The present model of monthly meetings does not keep PL based outside the country in loop.
8/3/2019 Ganges BDC Inception Report
38/72
2. Compliance with contracting requirements
Please fill out the checklist below and append the Annexes indicated to the report. Please refer toStandard
Clauses and Procedures3.02 and 3.03 for further information
Documents required to finalize contracting requirements and for
next tranche payment
Where to find it Updated
and / or
annexed?
1. Updated proposal reflecting changes negotiated with partners during
the inception period (if any) and cover note explaining what has
changed
Annex 1 to this
report
Yes
2. Updated Project Workbook reflecting changes negotiated during the
inception period:
Annex 2 to this
report
Completed contact sheet Ditto Yes
Updatedoutcome logic model Ditto Yes
Milestone plandeveloped for the duration of the project with
particular emphasis on the next year)
Ditto Yes
Baseline plan, outcome targets and outcome indicatorsfor
projects main two outcomes
Ditto No changes
Updated Gantt Chart Ditto No changes
Updated budget worksheets (CPWF will not increase your
budget; all changes beyond moving 5k must explained and
justified as comments in the respective budget worksheets and
in the financial report below)
Ditto No changes
3. SignedMOUscorresponding to your proposal Annex 3 to this
report
Yes
4.Third Party Intellectual asset audit Annex 4 to this
report
Not relevant
at this point
3. Needs from the CPWF
https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/indicator-and-milestone-planhttps://sites.google.com/site/cpwfhandbook/files-1/CPWF_Partnership_MoU_BDC_Mar10.DOC?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Partnership_MoU_BDC_Mar10.DOC?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Partnership_MoU_BDC_Mar10.DOC?attredirects=0https://sites.google.com/a/cpwf.info/handbook/files-1/CPWF_Annex5_ThirdPartyIPAuditForm.doc?attredirects=0&d=1https://sites.google.com/a/cpwf.info/handbook/files-1/CPWF_Annex5_ThirdPartyIPAuditForm.doc?attredirects=0&d=1https://sites.google.com/a/cpwf.info/handbook/files-1/CPWF_Annex5_ThirdPartyIPAuditForm.doc?attredirects=0&d=1https://sites.google.com/a/cpwf.info/handbook/files-1/CPWF_Annex5_ThirdPartyIPAuditForm.doc?attredirects=0&d=1https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Partnership_MoU_BDC_Mar10.DOC?attredirects=0https://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/m-e-tools-and-workbook/project-workbook/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=08/3/2019 Ganges BDC Inception Report
39/72
Is there anything that the CPWF can help you with at this point in the project? Please specify where you think
the help should come(e.g., from Basin Leader, Coordination Project, CPWF KM team, CPWF Research team,TWGs)
- From Basin leader/Coordination Project: Make sure that PLs who are based outside Bangladesh are able to
participate in monthly meetings.
8/3/2019 Ganges BDC Inception Report
40/72
4. Financial management
Please note that the summary report below requires sign off by the Lead Institutions chief financial officer.
Financial reporting requirements are described in detail inStandard Clause 8.06. This summary report isrequiredin addition to a six-monthly statement of project receipts and expenditures (see Guidance note
above).
4.1 Summary financial report
Please fill in the table below to report on project cash flow to date
Time3
2011 2011 2012 2012 2013 2013 Completion Report
and Final Audit for
project closure
In
ception
R
eport
P
rogress
R
eport
1
Annual
R
eport
Progress
R
eport
2
Annual
R
eport
Progress
R
eport
(thousands of $US) US$ US$ US$ US$ US$ US$ US$
1
Value of tranche
payment received this
report period
-
2
Value of tranche
payments received to
date
-
3
Value of expenditures
for report period 52
4Accumulative value of
expenditures to date52
5 Balance held against
cumulative tranche
payments
(52)
6
Value of committed
funds15
Please note that IWMI has agreed to pre-finance the 1st disbursement of USD 238,839
Instructions to fill the table by row:
3Adjust the dates to fit with our contract period
https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=0https://sites.google.com/site/cpwfhandbook/files-1/CPWF_Annex1_StandardClausesandProcedures_BDC_Apr2010.doc?attredirects=08/3/2019 Ganges BDC Inception Report
41/72
1. Insert the value of funds CPWF provided against your charge code/ project code during the period of
your report.
2. Insert the value of funds received to date by summing all amounts in line 1.
3. Insert the value of all funds that have been transferred out of your charge code/project code during
the report period. Your financial management system, or accountant, should be able to provide you
with this figure. (See separate note on commitments)
4. Insert the value of funds spent to date by adding this reporting period to the previous accumulative
total.
5. Insert the value of unspent funds that you are holding in your charge code/project code
6. Of the balance you are holding in your charge code/project code, state what how much has been
committed and provide an explanation below. This is also important, because we may hold back funds
from your next tranche payment if it looks as though you are holding substantial unallocated funds.
I certify that the summary financial report is correct
Chief financial officer:
Date:
8/3/2019 Ganges BDC Inception Report
42/72
4.2 Project leaders commentary on the summary financial report
Please explain any significant commitments currently being held
Commitment is held against payment to which partners or providers? Amount USD Expected date of expenditure
See attached report for details on commitments
If you are over-spent / under-spent please explain why or any aspect of the financial progress of your project
that has or will affect progress:
The project has under spent so far, but that is because fieldwork is yet to commence and once that happens inNovember 2011, project spending will pick up. In addition, the project is hiring a number of consultants who will work
on specific topics and contribute to the project deliverables. We have also advertised for a post doc position who will
spend 50% time on this project. Advertisement is already out and we hope to get good candidates and complete the
hiring process by January 2012. In addition, once our MOUs are signed with 3 remaining partners, we will make advance
payment to them. It is hoped that we will be able to spend 75% of our first years budget by December 2011, while the
rest will be carried over to the next year.
If you had moved budgets across line items please explain why:
No
Any other comments about financial aspects of your project, and any advice you would like to receive:
Not at this point.
8/3/2019 Ganges BDC Inception Report
43/72
5. Annexes
Send annexes as separate attachments to the main report
Annex 1: Updated Project Proposal plus a cover note
Annex 2: Updated Workbook and Worksheets
Annex 3: MOUs signed with project partners
Annex 4: Third Party Intellectual Audit
Annex 5: Full financial report (in excel)
8/3/2019 Ganges BDC Inception Report
44/72
Annex 4: Project 4 Inception Report
CPWF Project Inception Report
Project Title: Assessment of the impact of anticipated external drivers of
change on water resources of the coastal zone
Project Number: G4
Project Leader: Zahir-ul Haque Khan
For submission to the
Date: 11, 03, 2011
8/3/2019 Ganges BDC Inception Report
45/72
1. Progress made during project inception
1.1 Achievements
G4 has considerable achievements in the inception phase of the project:
(1) MoU with the Partners: IWM has signed contracts with the partner institutions: IWMI, IWFM-BUET and BWDB
Professionals of the partner institutions are actively involved in project activities such as methodology development,
field visits, data collection, preparation of reports and participation in workshops.
(2) Selection of the Study Area: G4 has selected the study area which includes the coastal zone of Ganges delta in
Bangladesh for analysis of flooding, storm surge and salinity. The detailed analysis on salinity, water availability, storage
capacity of drainage khals in the polders, storm surge and drainage congestion will be carried out for specific polders
(No. 3, 30 & 43/2F). The study area is shown in Figure 1.
Figure 1: Study area map of G4 (The selected polders are shown in yellow)
(3) Identification of External Drivers: In light of past projects and researches and through discussions and interactions
with the partners a questionnaire for identification of the external drivers has been prepared. The questionnaire has
been circulated among experts, stakeholders and peers. The preliminary results of the questionnaire survey show that
population growth is the major external driver that affects water resources in the region. Climate change induced sea
level rise, change in water management practices, water sharing practices between riparian countries and water
43/2F
30
3
8/3/2019 Ganges BDC Inception Report
46/72
infrastructure development have been identified as other key drivers. Identification of these key external drivers of
change is very important for achieving the project goals since the main objective of G4 is to assess the effect of these
drivers on water resources in the coastal Ganges basin.
(4) Community Consultation: A field visit was conducted in Polder 30 and Polder 3 from 17 to 19 September, 2011 bythe members of component G4. The objective of the visit was to conduct community consultation primarily with the
farmers and fishermen through Focus Group Discussion (FGD), Key Informant Interview (KII) and other participatory
tools to assess the important issues in water resources management and to identify the anticipated external drivers of
change. Group discussions and interviews indicate that drainage congestion, polder overtopping (during spring tide) and
breaching, availability of fresh water during the dry period, salinity intrusion, absence of an effective institutiona
arrangement for water management, conflict between gher owners and farmers, pricing and distribution of fertilizers
and depletion of natural fish are the major problems in the area. Other observations indicate that population growth
encroachment of drainage canals, leasing of the khals, reduction in freshwater flow due to upstream interventions,
sedimentation of river beds, destruction of natural fish habitats have caused these problems. These findings along with
those from the questionnaire survey will enable G4 to identify and prioritize external drivers of change.
Figure 2: Focus Group Discussions in polder 30 and 3
8/3/2019 Ganges BDC Inception Report
47/72
(5) Survey and Data Collection:A comprehensive plan has been prepared for surveying the existing polders, regulators
land level, land use, khal cross-sections, water level, water flow and salinity in the selected polders (No. 3, 30 & 43/2F)
The survey team has started primary data collection at six water flow stations, twelve water level stations and fifteen
salinity stations in addition to collection of data on cross-sections of khals and embankments, topography, land-use,regulators and unauthorized structures. Some sample plots of these data are shown in Figure 3. From the figures it is
evident that river salinity drops considerably during June/July which is suitable for agriculture.
Figure 3: Measured salinity in rivers near polder 3 and 30
This survey will enable G4 modeling team to setup a detailed model of the selected polders. Moreover, G4 has also
started data collection from secondary sources. These primary and secondary data will be used for establishment of
baseline condition, and development and calibration of the models.
1.2 Bottlenecks
The main challenge of the project is to make available water resources data, land use and demographic data from the
Indian part of the Ganges basin as well as to know the future water resources plan. It is immensely difficult to assess the
effects in the study area due to the changes of the external drivers in the upstream basin. However, the published data
for the Indian part will be used to assess effect of changes in the upstream basin. IWMI, a partner of G4, will provide
available data on water flow, rainfall, water-use, land-use, population, water plans and policies in the upstream region
of the Ganges basin in present and future condition. Moreover, a relevant consultant will be appointed for the purpose.
1.3 Insights and learning
Introduction
With increasing pressure from population growth, industrialization and in a changing climate, it is more important thanever to assess the availability and productivity of water for agriculture and aquaculture system in Bangladesh, especially
in the Ganges basin since this basin is the area of multiple problems and opportunities. The quantity of freshwate
available is likely to decrease due to a combination of external drivers, including population increase, water pollution
inadequate planning and management of transboundary waters, climate change and inefficient operation of water
management projects. Consequently, there is an increasing potential for water scarcity, crisis and associated conflicts in
the future.
It is also imperative that precious and vulnerable locations increase their resilience to changing conditions.
8/3/2019 Ganges BDC Inception Report
48/72
Methodology
Selection of External Drivers: The problems related to water crisis and conflicts are numerous, complicated and
challenging. Efforts to effectively resolve these problems require a clear vision of the future water availability and
demand as well as new ways of thinking, developing and implementing water planning and management practices. The
hydrologic system in the coastal regions of Bangladesh is extremely vulnerable to the impact of external drivers. The
performance of the system varies seasonally, annually and especially during the occurrence of extreme events. The
project is developing a comprehensive list of external drivers based on past researches, literature review, and
interaction with the peers and major stakeholders. The external drivers will be identified and prioritized through a
questionnaire survey among the experts, stakeholders and peer groups. The questionnaire will be developed based on
literature review and preliminary field information. Survey results will be triangulated with information obtained from
the selected study areas through community consultation and key informant interviews.
Modeling: The present research program attempts to offer a comprehensive account of the above issues and also to
achieve the stipulated outcomes to contribute to GBDC. The effects of anticipated changes due to external drivers on
flooding, submergence, sedimentation, salinity intrusion and water availability in the different polders of the coastazone are going to be assessed using available water flow, salinity models based on MIKE series. The effect of storm
surges of varying intensities and frequencies on polder overtopping and inundation will be assessed using the Bay of
Bengal model based on MIKE 21. These models will be utilized to simulate the baseline and projected conditions in 2020
2030 and 2050. The study will be conducted at the regional level for the coastal regions of Bangladesh as well as in three
selected polders (Polder No.3, 30 & 43/2f. Soil Water Assessment Tool (SWAT) and Water Evaluation And Planning
(WEAP) models will be used for assessing the impacts of land-use changes on flow.
Approach and Techniques: It is now well recognized that the existing adaptation strategies are inadequate to cope up
with the enhanced magnitude and increased frequency of the impacts of the anticipated changes. Based on the
resilience and the anticipated impacts different adaptation strategies will be devised such as improvement of drainage
canals, operation of sluices, strengthening of embankments, dredging, and restoration of dry season freshwater flow for
flushing salinity as well as restoration of the ecosystem. Specific adaptation strategies for choice and selection of thecrops/aquaculture during different seasons and their salinity and submergence tolerance will be developed in
consultation with G2. Collaboration will be developed with G3 and G5 projects for information on community/
institutional management of the resources and the operation of the water infrastructure and its governance at the
polder level.
For establishing future projections of climate change statistical downscaling will be applied. Statistical downscaling, on
the other hand, provides an easy to apply and much rapid method for developing high resolution climate change
surfaces for high resolution regional climate change impact assessment studies. Statistical downscaling is analogous to
the model output statistics (MOS) and perfect prog approaches used for shortrange numerical weather prediction
Figure 1 shows a schematic illustrating the general approach to downscaling. In situations where lowcost, rapid
assessments of localized climate change impacts are required, statistical downscaling (currently) represents the more
promising option. In this context, statistical downscaling will be conducted in this study to developed climate change
scenarios.
8/3/2019 Ganges BDC Inception Report
49/72
Figure 4: A schematic illustrating the general approach to downscaling.
Currently, more than a dozen centers around the world develop climate models to enhance our understanding of
climate and climate change and to support the IPCC activities (IPCC, 2001, 2007). There are marked differences between
different models, based on the selection of numerical methods employed, the spatial resolution of the simulation, and
the subgrid-scale parameters (IPCC, 2001 2007; Govindan et al., 2002), and due to that, any researcher would desire touse all climate models and assess uncertainties rather than selecting a subset of GCMs. It is essential to generate climate
change information for the study area using a number of GCMs and using a number of driving SRES scenarios. Among
the 24GCMs, sever of GCMs are widely used for impact studies which are listed in Table-1 will be used for this study.
Two extreme scenarios (A2 and B2) and one moderate scenario A1B will be used to develop climatic information for the
study area.
Table 1: List of GCMs and principal characteristic
Model Country Resolution Reference
CCCMA-CGCM3.1 (T47) Canada T47 (3.75x3.75), L31 Scinocca et al. (2008 )
CSIRO-Mk3.0 Australia T63, L18 Gordon et al. (2002 )
IPSL-CM4 France 2.5x3.75, L19 Marti et al. (2005 )
MPI-ECHAM5 Germany T63, L32 Jungclaus et al. (2005 )
NCAR-CCSM3.0 USA T85L26, Collins et al. (2005 )
8/3/2019 Ganges BDC Inception Report
50/72
UKMO-HADCM3 UK 3.75x2.5, L19 Gordon et al. (2002 )
Climate change scenarios will be generated for 25km spatial gird for the following 4 climatic variables-
1. Annual maximum temperature2. Annual mean temperature
3. Annual minimum temperature
4. Annual total precipitation
Using the full present day (20C3M) monthly time series, 30 year running means around 1985 (1961-1990) will be
calculated as a baseline, for each of the GCMs and the 4 variables of interest. Then 30 year running means were
calculated for each of the emission scenarios and for the four periods, so that the complete time series were reduced to
4 different 30 year averaged periods, as follows:
1. 1961-1990: The baseline climate, also referred as current climates
2. 2010-2039, referred as 2020s
3. 2040-2069, referred as 2050s
4. 2070-2099, referred as 2080s
This mean monthly present day and future climate changes will be used for further impact study .
G4 researchers will employ Soil Water Assessment Tool (SWAT) to assess the water balances at different reaches of the
catchment and generate scenarios on the impact of future land use changes. SWAT is a process-based continuous
hydrological model that predicts the impact of land management practices on water, sediment and agricultural chemica
yields in complex watersheds with varying soils, land use and management conditions. The hydrological cycle as
simulated by SWAT is based on the water balance equation:
where SWt is the final soil water content (mm); SWo is the initial soil water content (mm); T is time (days); Rday is the
amount of precipitation on day i (mm); Qsurf is the amount of surface runoff on day i (mm); Ea is the amount of
evapotranspiration on day i (mm); Wseep is the amount of percolation on day i (mm); and Qgw is the amount of return
flow on day i (mm).