Foundation Improvement Evaluation. A Major Qualifying Project for Stantec Consulting Services Inc . Michael Kendall Karyn Sutter. Kentucky River Lock and Dam No. 8. Worcester Polytechnic Institute Civil and Environmental Engineering. Major Qualifying Project Stantec Project Center - PowerPoint PPT Presentation

Citation preview

Foundation Improvement

EvaluationKentucky River Lock and Dam No.

8A Major Qualifying Project

for Stantec Consulting Services Inc.

Michael Kendall Karyn Sutter

Major Qualifying Project Stantec Project Center

◦ Project Advisors Professor Suzanne LePage Professor Frederick Hart

◦ Stantec Consulting Service Inc. Mentors Daniel Gilbert April Welshans Adam Hacker

Worcester Polytechnic Institute

Civil and Environmental Engineering

LD 8 Foundation Improvement

◦ Karst Features◦ Water Quantity and Quality Concerns◦ Foundation Stability

Problem Statement

Evaluate Existing Dam Conditions Develop Design Options Apply Evaluation Criteria to Design Options Create a Preliminary Design of Best

Foundation Improvement Option

Project Scope

Kentucky River Lock and Dam No. 8

Boring Layout Water Pressure Tests

Site Geology

Exploratory Borings by Geological Region

Materials ◦ Portland Cement◦ Admixtures

Design Techniques◦ Grout Curtain◦ Grout Cap

Background: Grouting

Background: Cut-off Walls

Secant Walls Diaphragm Walls

Design Selection◦ Evaluated Existing Conditions◦ Developed Three Design Options

Methodology

Design Description

Design 1 Grouting in all regions

Design 2 Grouting in all regions, secant wall in region 2

Design 3 Grouting in all regions, secant wall in region 2, 3 and 4

Design Options

Application of Evaluation Criteria◦ Cost◦ Environmental

Permitting◦ Risks

Reduction in Seepage Foundation Damage

◦ Constructability Dewatering Site Access

Design Creation

Methodology

Results: Curtain and Cut-off DepthGrouting Cut-off Walls

Region Recommended Grout Curtain Depth

  Elevation (NAVD88)

Approx. Length@ 15° Inclination

(ft.)Region 1 430 72.5

Region 2 425 78.0

Region 3 453 52.5

Region 4 443 77.5

Region Recommended Cutoff Depths

  Elevation (NAVD88)

Length (Ft.)

Region 2 465 35

Region 3 455 45

Region 4 475 35

Each Secant Shaft Designed with a 4 Ft. Diameter with a 1 Ft. Overlap on Each Side

Two Row Curtain with 16 Ft. Space Between Rows and Injection Holes every 6 Ft.

Cost

Results: Evaluation Criteria

Design Total Cost

Design 1: Grout Curtain Throughout

$2,506,804

Design 2: Grout Curtain Throughout, Secant Wall in Region 2

$2,948,554

Design 3: Grout Curtain Throughout, Secant Wall Regions 2, 3 and 4

$5,024,554

Design Option Costs

Environmental◦ Identical Permitting Requirements

Risks◦ Mostly Dependant on Grouting◦ Seepage Reduction Crucial

Constructability◦ All Designs Practical◦ Verifiability of Technique

Results: Evaluation Criteria

Selected Design 2: Grout Curtain Throughout with a Secant Wall in Region 2

Capstone Design Project

Design of Proposed Foundation Improvement

Highest Water Loss Observed through Region Two

Favorable Cost to Permeability Reduction Ratio

Practical Design

Conclusions

Questions?