John J. Simmins, Ph.D.

Electric Power Research Institute

Smart Grid Information Sharing Call

November 27, 2012

Field Force Operational Data Visualization

What’s So Smart About It?

2 © 2012 Electric Power Research Institute, Inc. All rights reserved.

The self healing grid

Normal Configuration

3 © 2012 Electric Power Research Institute, Inc. All rights reserved.

A Fault Occurs

4 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Flow of Fault Current Triggers

Faulted Circuit Indicators (FCIs)

5 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Substation circuit breaker

trips a first time

6 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Substation circuit breaker recloses….

7 © 2012 Electric Power Research Institute, Inc. All rights reserved.

…and trips again (lockout)

8 © 2012 Electric Power Research Institute, Inc. All rights reserved.

FLISR identifies faulted section by

comparing FCIs

9 © 2012 Electric Power Research Institute, Inc. All rights reserved.

FLISR opens switches to isolate

the faulted feeder section

10 © 2012 Electric Power Research Institute, Inc. All rights reserved.

FLISR Triggers Upstream Restoration

11 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Downstream restoration of blinking section

Compare load with available capacity

12 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Downstream restoration of blinking section

Compare load with available capacity

Pre-fault load

= 1 MW

Available Capacity =

2 MW

13 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Capability exists, so…

Available Capacity =

2 MW

Pre-fault load

= 1 MW

14 © 2012 Electric Power Research Institute, Inc. All rights reserved.

FLISR closes switch to restore service

Via alternate supply line

15 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Now FLISR checks for capacity to

Transfer last downstream section

Available Capacity = 1.5

MW

Pre-fault load

= 2 MW

16 © 2012 Electric Power Research Institute, Inc. All rights reserved.

In this case capacity does not exist so

downstream section is not restored

Pre-fault load

= 2 MW

Available Capacity = 1.5

MW

17 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Options for the red substation….

Pre-fault load

= 2 MW

Available Capacity = 2.5

MW

18 © 2012 Electric Power Research Institute, Inc. All rights reserved.

These actions free enough capacity to

pick up last remaining section

19 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Only one problem….

20 © 2012 Electric Power Research Institute, Inc. All rights reserved.

So, how has this changed?

21 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Contents

• Introduction to Field Force

Visualization supplemental

project

• Data visualization in a

broader sense

• Data and visualization as a

commodity

22 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Goals of the FFDV Supplemental Project

• Identify gaps in standards

• Demonstrate the use of low

cost platforms

• Demonstrate the use of low

cost communication media

• Prove value of in field

integration

• Prove value for large scale

outages

• Identify multiplatform issues.

23 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Field Force Data Visualization

An integrated field force data

visualization and integration

tool for managing work and

maintaining any asset in the field.

Leveraging CIM, Augmented Reality and Context

Aware GIS

24 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Definition – Common Information Model (CIM)

• In our context, it is a

semantic model of the

electric utility industry that

may be leveraged to create

standard messaging

between back office

systems --- or in our case,

tablet or other hardware in

the field.

25 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Definitions – Augmented Reality

• Augmented reality (AR) is a

live, direct or indirect, view of

a physical, real-world

environment whose

elements are augmented by

computer-generated sensory

input such as sound, video,

graphics or GPS data.

• Not to be confused with

virtual reality – which

replaces a real world with a

simulated one.

Don Carlos

(Mexican)

102 Broad St.

26 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Definition – Context Aware GIS

• Using the dynamic context of

mobile device users, caused

by the mobility and constant

change in the environment,

to deliver information.

• Aware of the spatial

environment surrounding the

user.

• Aware of the role (limiting

access) of the user.

27 © 2012 Electric Power Research Institute, Inc. All rights reserved.

From “Dumb” to “Smart”

28 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Traditional Point-to-Point Integration

Characteristics

• Complex environment

• High integration costs

• High maintenance costs

• Message tracking – non-

existent

• Guaranteed delivery –

non-existent

• Frequent “broken”

interfaces.

There is no “leverage” of the information being exchanged

29 © 2012 Electric Power Research Institute, Inc. All rights reserved.

“Smart” Integration

Characteristics

• Enterprise semantic model

• Enterprise service bus

– Little or no custom code

– Lower integration cost

– Lower maintenance

costs

– Message tracking

– Guaranteed delivery

– Reliable.

Messages are agnostic of their origins

30 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Example: Typical Elements of a Work Request

• Work ID

• Location

• A bill of materials (BOM)

• An estimated time of

completion is calculated and

a start or completion time is

calculated.

• Crew type (based on skill

sets or roles)

• Detailed work tasks.

31 © 2012 Electric Power Research Institute, Inc. All rights reserved.

So, how does this all work?

32 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Field Force Data Visualization

The Issue:

• Access to real-time data in the field has not progressed

• Getting data to the field is too expensive

• Getting the data from the field is too cumbersome

• The applications don’t interop

• Data is not accurate

The Impact:

• Work is not efficient

• Decisions in the field suffer.

• Potentially dangerous situation.

Multiple applications in the field isn’t a great leap forward

33 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Field Force Data Visualization

EPRI Solution:

• Build on a light weight, inexpensive platform.

• Leverage augmented reality capabilities.

• Messaging using CIM to multiple systems.

• Two way communications to back office systems.

Value:

• Lower cost of field force automation.

• Puts accurate data where it needs to be.

• Correct inaccurate GIS data.

• Spurs CIM development.

34 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Field Force Data Visualization - Features

Asset Information

• Identify asset

• Maintenance history

• Create work request

• Call SOPs

One line circuit

diagram or geo-

schematic view

Crew location and

graphic circuit

representation

Links to other tools

Create work request

in the field

Status assigned work

in the field

Other Potential Features: QR, RFID, Bar Code, shape recognition

35 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Standards Leveraged by FFDV

Standard Title

IEC 61968-3 Network Operations

IEC 61968-4 Record and Asset Management

IEC 61968-6 Maintenance and Construction

IEC 61968-8 Customer Support

IEC 61968-9 Meter Reading and Control

IEC 61968-11 CIM Extensions for Distribution

IEC 61968-13 RDF Distribution model exchange

(CDPSM)

IEC 61968-14 MultiSpeak® Mappings and Profile

X12 511 Material Requisition

36 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Benefits

• Inexpensive to deploy

• Inexpensive to maintain

• Applications

– Asset maintenance manuals

– Damage assessment

– Asset information access

– Switching communications

– Work-order information flow

– Real-time system status

validation

– Visualizing faults in the field.

Field Work Becomes Easier and More Efficient

37 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Example: Damage Assessment

38 © 2012 Electric Power Research Institute, Inc. All rights reserved.

39 © 2012 Electric Power Research Institute, Inc. All rights reserved.

40 © 2012 Electric Power Research Institute, Inc. All rights reserved.

41 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Implications for Large Scale Outages

• Use “foreign” tablets in the

damaged service territory

• Provide tablets to

contractors

• Instantly recognize the

symbology of the host utility

• Share information as

necessary.

With technology and standards that apply across the

industry, you can:

42 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Augmented Reality View of Grid in Honolulu

GIS data contains

“z” dimension

Assets of interest

are marked

Conductors are

color coded

43 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Simulated Distribution Grid

Golf course secondary

44 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Details of Assets in the Field

GIS Aware List of

Options

• Schedule maintenance

• Retrieve manuals

• Edit asset location

• View locations details

45 © 2012 Electric Power Research Institute, Inc. All rights reserved.

List of Manuals Available for that Asset

GIS Aware List of Manuals

• Operations manual

• Maintenance manual

46 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Verification of Manual and Asset

Revision number

Last update

Visual verification

47 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Detailed Instructions

Detailed

instructions

Pictures or video

48 © 2012 Electric Power Research Institute, Inc. All rights reserved.

What About Security?

• Platform (iOS) Security

– Low level system calls not allowed

– App isolation – each app in its own “sandbox”

– Library randomization

– Encrypted drive

– Password protected

• Network Security

– SSL/TLS with X.509 certificates

• Application Security

– Encrypted data exchanges

– Strong log in

49 © 2012 Electric Power Research Institute, Inc. All rights reserved.

References:

• YouTube Video:

http://www.youtube.com/watch?v=amxE1BD21vc

• Program on Technology Innovation: Assessment of iPod

Touch® as a Sensor Platform for Application Across the

Electric Power Industry – 1024696

• Field Force Data Visualization: A Mobile Integrated Data

Access Platform – 1024304

• Field Force Data Visualization Software – 1023399

(available ~December 15, 2012).

50 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Implications

51 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Commoditization

• Commoditization occurs when consumers

can buy the same product or service from

different small or large businesses.

• Price is the only distinguishing factor in

commoditized products, because there is

no significant difference in quality or in

how consumers use these products.

• Companies usually cannot raise prices

because consumers can shop at

competitors offering the same or similar

products at lower prices.

• This process is enabled by standards or

de facto standards.

52 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Form 2S

3-Wire Self-Contained

Source: Handbook for

Electrical Metering, 9th Edition

Examples of Benefits of Commoditization

• C12.10 standard

– Mass production of meters

– Residential electrical meter ~ $20

• C12.18/C12.19 Optical port

• TX/RX Protocols

− Interoperable hardware: probes, hand held readers, etc.

53 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Typical Distribution Control Center a

Few Years Ago

• Distribution System was operated

manually with wall- mounted

switching diagrams

• Mostly paper driven processes

54 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Current Trend in Control Center

Design

• Increasing emphasis on “outside the fence” visualization

• Large mapboards disappearing from distribution control centers

• Use of stackable monitors for operator workstations – allows view of specific “area of responsibility”

55 © 2012 Electric Power Research Institute, Inc. All rights reserved.

What if we were to bring the same technology

inside the operations center?

• Geo-schematic view

• Geographic view

• Crew locations

• Fault locations

• Create a works order

• Assign to a crew

Lajja

Ajnnajd

Jdh

Aja

jf

Advantage: Display technology independent of back end systems

56 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Conclusions

• The combination of mobile technologies, standards

development and communications enables new ways to

access and view data.

• Integration – the ability to use data from multiple systems –

is available not only in the back office but in the field.

• Standardizing the symbology and visualization technology

has far reaching implications for mutual aid/large event

management.

• The same technologies – touch screens, standard symbols,

standard messages, etc. – can be leveraged inside the

operations center with likely gains in efficiency and quality

decisions.

57 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Questions

58 © 2012 Electric Power Research Institute, Inc. All rights reserved.

Together…Shaping the Future of Electricity