EXISTING BUILDINGS

Preview:

DESCRIPTION

EXISTING BUILDINGS. 5. Slide header copy. In This Chapter. Sustainable existing buildings Planning green projects for existing buildings Measures to improve existing buildings Retrocommissioning and ongoing commissioning. 1-1. 5-1. Slide header copy. S. - PowerPoint PPT Presentation

Citation preview

5 EXISTINGBUILDINGS

Slide header copyIn This Chapter

> Sustainable existing buildings> Planning green projects for

existing buildings> Measures to improve existing

buildings> Retrocommissioning and

ongoing commissioning

1-15-1

Slide header copyS

5-2

> According to Elefante, in a generation:20

Four out of five existing buildings will be renovated

But just two new buildings will be added to building stock

Slide header copyAssessing EB Project Goals

1-15-3

> Considerations: Client motive/priority The “going-in” state of the

building Cost threshold Challenges

Slide header copyAssessment Tools

5-4

> GBI’s CIEB Tool (pictured)

> ENERGY STAR Portfolio Manager

Slide header copySetting Performance Targets

> Realistic return on performance

> Realistic assessment of layout and design of building/leased spaces

> Set cost expectations> Comparable building

benchmarks

1-15-

Slide header copyMeasurement of Building Improvements

5-6

> Site energy use/Source energy use

> Carbon foot print > Water usage> Waste

Slide header copyCommon Mistakes for EB Upgrades

> Focus on sustainability goals, not certification goals

> Recognize danger of too many improvements made without overall planning

1-15-7

Slide header copyO&M Improvements

5-8

> Green cleaning> Green pest

management> Efficient lighting > Maintenance of HVAC

operations> Staff training

> Tenant education> Purchasing policies> Preventive

maintenance> Supporting commuting

alternatives> Optimizing water use

for landscaping

Slide header copyCapital Upgrades

1-15-9

> Considerations: Nature and length of building

operations disruptions Tenant support of upgrade Engineering limitations of building Expert consultation and

recommended options

Slide header copyCapital Upgrades for EB HVAC

5-10

> Fuel cell power generation> Chilled-water applied systems (chiller)> Off peak cooling and thermal storage

systems> Combined heat and power (CHP)

systems> Variable frequency drives (VFDs)

Slide header copyGetting the Word Out: Greenhouse Gas Savings

> EPA Greenhouse Gas Equivalencies Calculator

> www.epa.gov/solar/energy-resources/calculator.html

1-15-11

Slide header copyCommissioning for EB

5-12

Slide header copy

> Identifies and addresses system inefficiencies

> Improves building’s overall performance

> Helps drive operating expenses ↓, NOI ↑

> Identifies IEQ issues

1-15-13

> Ensures owner expectations for operations

> Provides additional benefits

> Building staff well-trained

Retrocommissioning Benefits

Slide header copyRetrocommissioning Payback (Median)

5-14

Slide header copyRetrocommissioning as First Step

1-15-15

Slide header copyCommissioning Challenges

5-16

> Rent structure disincentive for some owners

> Potential impact to tenant improvements already in place

> Disruption of building operations potentially impacts tenant’s business operations

Slide header copyCase Study: Existing Building O&M

> California EPA headquarters in Sacramento

> Has become example of how small changes in building practices can significantly increase its sustainability and reduce operating expenses

1-15-17

Slide header copyExercise: Sustainable Existing Building Concepts

5-18

Variable frequency drives (VFDs)Ongoing commissioningThermal storage systemCFLsAPPA custodial effectiveness auditHow maintenance may pay off in greater energy efficiencyGeothermal heat generationIntegrated upgrade approach

E.

B.

A.

G.

F.

H.

D.

C.

Recommended