EXHIBIT 8-3 FUTURE LAND USE

Preview:

Citation preview

o1s

t Ave

4th

Ave

Cypress Ave

3rd

Ave

Chicago Ave

2nd

Dr

Cottonville Ln

Cottonville Ave

5th Rd

Cree Ave

2nd

Ln

Cumberland Rd

Czech Ave

6th

Ave

3rd

Dr

Old Hwy 21

Chicago Rd

7th

Ave

6th

Dr

Cumberland Ave

Cypress Ct

Blac

k O

ak L

n

Dakota Ave

6th

Ln

Czech Dr

Cypress Rd

Henry Shore Dr

Burr Oak Ct

Black Oak Ct

Dakota Rd

Cottonville Dr

Chicago Ave

6th Ave

2nd

Dr

6th

Ave

1st A

veCottonville Ave

3rd

Ave

3rd

Dr

5th Rd

Cze

ch D

r

COUNTY ROAD CC

COUN

TY R

OAD

V

CO

UN

TY R

OA

D C

HC

OU

NTY

RO

AD

FF

STATE ROAD 21

INTE

RS

TATE

39

INTE

RS

TATE

39

STATE ROAD 21

4 Seasons Dr

1st D

r Faw

n Ln

Elk

Ct

2nd

Cir

Cypress Ave

8 9

341

25

7

6

11

20

13

10

2224

33

15

12

36

2527

23

17

29

21

34

26

14

3532

16

28

18

19

30

31

TOW

N O

F C

OLO

MA

TOW

N O

F R

ICH

FIE

LD

WA

US

HA

RA

CO

UN

TY

AD

AM

S C

OU

NTY

TOWN OF COLOMA

TOWN OF HANCOCK

TOWN OF SPRINGFIELD

TOWN OF COLOMA

TOW

N O

F C

OLO

MA

TOW

N O

F R

ICH

FOR

D

WAUSHARA COUNTY

MARQUETTE COUNTY

VILLAGEOF

COLOMA

VILLAGEOF

COLOMA

VILLAGEOF

COLOMA

Chaffee Creek

South Branch

Wedde Creek

Pleasant Lake

BingLake

EXHIBIT 8-3TOWN OF COLOMAFUTURE LAND USE

40 10.5

Miles

Prepared ByEAST CENTRAL WISCONSIN

This data was created for use by the East Central Wisconsin RegionalPlanning Commission Geographic Information System. Any other use/applicationof this information is the responsibility of the user and such use/applicationis at their own risk. East Central Wisconsin Regional Planning Commissiondisclaims all liability regarding fitness of the information for any use other thanfor East Central Wisconsin Regional Planning Commission business.

MP D:\WausharaCo\GroupB\Town of Coloma\MXD\futurelu1808_11X17.mxd

Other FeaturesEnvironmentally Sensitive Area

DNR Owned Land

Fema 100 Year Floodplain, 50 Ft Buffer ofWetlands > 5 Acres, 75 Ft Buffer of Hydro,100 Ft Buffer of Class I, II, and III Trout Streams.

1200 Ft Landfill Buffer

Ice Age Trial Cooridor

Alternate Ice Age Trail

Existing Ice Age Trail

Morraine Line

o

"Ý Cemetery

Airport

Future Development Minimum Lot Size 5 Acres

Future Mixed Use - Small Parcel Development

Future Agriculture

Future Land Use

Existing Land UseResidential

Mobile Home Park

Commercial

Industrial

Institutional

Parks

Transportation

Utilities

Water

Future Rail

Wellhead Protection Area 5 YearTime of Travel (Approximate Area)

Source: Future Land Use Data updated by the Town of Coloma and East Central Wisconsin Regional Planning Commission, 2009. Environmentally Sensitive Area data provided by FEMA 2001, WI DNR 2004, and Waushara County, 2008. Digital Base Data provided by Waushara County, 2008.

Wellhead Protection Area data obtained from the Wellhead Protection Plan, Village of Colma, 2000.

The future land uses indicated on the map are based upon the best and mostcurrent information available at that time, and is adopted as part of the Townof Coloma Comprehensive Plan with the premise that it is impossible to predictfuture growth and changes in development pressures with complete accuracy.Therefore, the Town of Coloma anticipates that requests for land use changeswi l l be made for areas outside of the future land use areas depicted on thismap, and reserves the right to review these requests on a case by case basis,applying the actions and commentaries contained within this plan when actingon these requests along with al l newly avai lable information at the t ime therequest is made. This map will be reviewed and amended periodically to reflectthese changes in full compliance with all applicable state and local requirements.

REGIONAL PLANNING COMMISSION-SEPTEMBER, 2009

Trish
Call Out
Planned Park, Pleasant Lake
Trish
Oval
Trish
Typewritten text
AMENDED FEBRUARY, 2014
Trish
Typewritten text

Recommended