Engineering (Track & Civil) Instruction ETI -09 -04 · 2014. 10. 13. · Engineering (Track...

Preview:

Citation preview

Engineering (Track & Civil) Instruction Underbridge Transoms - Installation ETI-09-04

Version A.0 Date of last revision: 09 Nov 09 Page 3 of 4

This document is uncontrolled when printed. See ARTC Intranet for latest version.

Figure 1

Engineering (Track & Civil) Instruction Underbridge Transoms - Installation ETI-09-04

Version A.0 Date of last revision: 09 Nov 09 Page 4 of 4

This document is uncontrolled when printed. See ARTC Intranet for latest version.

Figure 2

Engineering Standard–NSWBridges and Structures BDS 20Configuration Standard - Bridge Ends

Issue 1 © Australian Rail Track CorporationRevision 2 This document is uncontrolled when printedMarch 2005 Page 11 of 11

Appendix 3 - Ballast Retention Walls

PLANN.T.S.

NOTE:BALLAST CAN BE EXCAVATED AND SUPPORTEDWITH STAR PICKETS AND TWO LAYERS 20mmPLYWOODWHILE CONSTRUCTION OF FLEXBEAMGUARD RAIL TAKES PLACEFLEXBEAM MUST NOT ENCROACH ON STRUCTUREGAUGE.

Engineering Standard–NSWBridges and Structures BDS 20Configuration Standard - Bridge Ends

Issue 1 © Australian Rail Track CorporationRevision 2 This document is uncontrolled when printedMarch 2005 Page 9 of 11

Appendix 1 - Subgrade Construction behind Abutments

Rail Infrastructure Corporation Sheep Creek Arch and Eleven Other Corrugated Steel StructuresSite Inspection, Condition Assessment and Review of Remedial Works

J:\83509\0004REPORTIJC ISSUE.DOC

Page D1 ArupIssue 17 June 2004

TYPICAL DETAIL FOR REPAIR OF ACCESSIBLE PIPE CULVERTS - EXTRACT FROM AS/NZS 2041