ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 2 OF 27
Form R145-38 Rev 0
19) PART LIST
ITEM QTY PART NUMBER DESCRIPTION REMARK
1 A/R A/R 20) TOOL LIST
ITEM QTY PART NUMBER DESCRIPTION REMARK
1 1 A/R Tap test Or alternative
2 1 PM545 Portable Thermacam NTM 55-20-07-002
3 1 FD2560 Portable Monitor NTM 55-20-07-002
4 1 GMIDS32HK010-2 Heating Blankets NTM 55-20-07-002
5 1 GMIDS34CK010-2 Temperature Controller NTM 55-20-07-002
6 1 GMIDS34TK010-2 110/220 Volts Transformer NTM 55-20-07-002
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 3 OF 27
Form R145-38 Rev 0
22) REVISION RECORD
N° REVISION ITEM DESCRIPTION DATE
0
ALL
ORIGINAL RELEASE
MAR-11-2014 (JG)
1
SUMMARY
IN SUMMARY WAS ADD “ENGINEERING ORDER COMPLY WITH REQUIREMENTS
OF ALI TASK 552007”
JUL-04-2014 (JG)
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 4 OF 27
Form R145-38 Rev 0
FLEET A320
AIRCRAFT MSN ELEVATOR P/N S/N APPLY CONFIGURATION
ABV 1400 LH D5528000100400 5126 SI 002
RH D5528000100500 5126 SI 002
ABW 1523 LH D5528000100400 3099 SI 002
RH D5528000100500 3099 SI 002
ADP 406
LH D5528000130P CS 1305 NO N/A
RH D55280001001 SG 1410
SI 001
ADO 447
LH D552‐80001‐000 CG‐1454
SI 001
RH D552‐80001‐0001CG‐1454
SI 001
TABLE 1
FLEET A319
AIRCRAFT MSN ELEVATOR P/N S/N APPLY CONFIGURATION
AFX 2283
LH D5528000101200 IC 5409 SI 002
RH D5528000101300CC 2825
SI 002
AFY 2129
LH D5528000101000CC 2751
SI 002
RH D5528000101100CC 2749
SI 002
TBLE 2 (1 DE 2)
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 5 OF 27
Form R145-38 Rev 0
FLEET A319
AIRCRAFT MSN ELEVATOR P/N S/N APPLY CONFIGURATION
AFZ 2251
LH D5528000101200 IC 5397 SI 002
RH D5528000101300CC 2803
SI 002
AHC 2119
LH D5528000101000CC 2739
SI 002
RH D5528000101100CC 2740
SI 002
AHD 2460 LH D5528000101200 IC 5480 SI 002
RH D5528000101300 IC 5500 SI 002
AHE 2548
LH D5528000101200 IC 5550 SI 002
RH D5528000101300CC 2965
SI 002
AIB 2378
LH D5528000101200CC 2881
SI 002
RH D5528000101300CC 2877
SI 002
AIC 2380 LH D5528000101200 IC 5465 SI 002
RH D5528000101300 IC 5463 SI 002
AID 2436
LH D5528000101200CC 2906
SI 002
RH D5528000101300CC 2906
SI 002
�� �� ��
SI 002
187j/TT5 1 Tf1.1617 0 TD0 Tc<0003>Tj/TT6 1 Tf2.3413186
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 6 OF 27
Form R145-38 Rev 0
CONFIGURATION ALL WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS INCLUDED IN THE REFERENCED PROCEDURES. CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY SERVICEABLE). WHEN YOU DO MAINTENANCE WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS: - PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS NECESSARY ON WIRING AND COMPONENTS. - REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND OTHER CONTAMINATION. THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION. IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00. Configuration definition I. CONFIGURATION 001. Configuration 001 is valid for aircraft with elevators on which Mod. 23558 is not embodied.
II. CONFIGURATION 002. Configuration 002 is valid for aircraft with elevators on which Mod. 23558 is embodied and on which Mod.No. 35515 is not embodied.
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 7 OF 27
Form R145-38 Rev 0
PLANNING INFORMATION I. CONFIGURATION 001.
TABLE 3
II. CONFIGURATION 002.
TABLE 4
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 8 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
Task 551046-832-942-001 - Inspection without Elevator Removal.
I. CONFIGURATION 001.
A. Subtask 551046-910-602-001 - Standard Practices.
(a) For the specification of materials (Mat. No.) given in this Service Bulletin refer to Consumable Materials List (CML).
(b) For the identification of Zones (Refer to AMM 06-20-00, Page Block 001) and Manual Front Matter Zone list.
(c) For the identification of access panels (Refer to AMM 06-41-53, Page Block 001) and Manual Front Matter Panel list.
(d) For elevator rib identification (Refer to SRM 55-21-11).
B. Subtask 551046-941-602-001 - Job Set-up.
(a) Make sure that the aircraft is electrically grounded (Refer to AMM Task 12-34-
24-869-002).
M
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 9 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
(b) Do the Job Set-Up procedure as specified in the Task "Special Detailed
Inspection (Thermographic) of Elevators Top and Bottom Skin Panels, LH/RH without Elevator Removal" (Refer to AMM Task 55-20-00-200-006-A01).
C. Subtask 551046-280-606-001 - Identify LH PN affected.
(a) Check the Part Number (PN) of the LH Elevator: 1. If the first 12 digits of the PN are not in the following lists, no further action
is required.
- All aircraft serial numbers (MSNs) with elevators pre-Mod. No. 35515 that do not have SB A320-55-1042 (Mod No. 150390) embodied. These elevators have part numbers for which the first 12 digits are as follows:
. LH Elevator: D55280001000, D55280001002, D55280001004, D55280001008, D55280001010, D55280001012.
- All aircraft serial numbers (MSNs) with elevators pre-Mod. No. 35515 that have SB A320-55-1042 (Mod No. 150390) embodied. These elevators have part numbers for which the first 12 digits are as follows:
M
M
I
I
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 10 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
. LH Elevator: D55280003000, D55280003002, D55280003004, D55280003006, D55280003008, D55280003010, D55280003012, D55280003014, D55280003016, D55280003018, D55280003020, D55280003022, D55280003024, D55280003026, D55280003028, D55280003030, D55280003032, D55280003034.
2. If the first 12 digits of the PN are in the above lists, do the following applicable subtasks.
NOTE: In case the affected elevator has not been transferred into another aircraft, maintenance records from SB A320-55-1040 accomplishment can be used as and alternative to check installed elevator PN and SN.
NOTE: Physical check of elevator PN installed on a dedicated aircraft is not required when subject elevator has already been physically identified and maintenance records can demonstrate its current allocation to an aircraft MSN.
D. Subtask 551046-280-607-001 - Identify RH PN affected.
(a) Check the Part Number (PN) of the RH Elevator:
1. If the first 12 digits of the PN are not in the following lists, no further action is required.
- All aircraft serial numbers (MSNs) with elevators pre-Mod. No. 35515 that do not have SB A320-55-1042 (Mod No. 150390) embodied. These elevators have part numbers for which the first 12 digits are as follows: . RH Elevator: D55280001001, D55280001003, D55280001005, D55280001009, D55280001011, D55280001013.
M
M
I
I
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 11 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
- All aircraft serial numbers (MSNs) with elevators pre-Mod. No. 35515 that have SB A320-55-1042 (Mod No. 150390) embodied. These elevators have part numbers of which the first 12 digits are as follows: . RH Elevator: D55280003001, D55280003003, D55280003005, D55280003007, D55280003009, D55280003011, D55280003013, D55280003015, D55280003017, D55280003019, D55280003021, D55280003023, D55280003025, D55280003027, D55280003029, D55280003031, D55280003033, D55280003035. 2. If the first 12 digits of the PN are in the above lists, do the following
applicable subtasks.
E. Subtask 551046-280-602-001 - Do a Thermographic Inspection of the LH Elevator Top and Bottom Skin Panels.
(a) Do the Special Detailed Thermographic Inspection of Elevator Top and
Bottom Skin Panels as per the NTM 55-20-07 Method B and Tap Test Inspection on and around the liquid indications as per NTM 51-10-03, in accordance with the AMM Task 55-20-00-200-006-A01, refer to Fig. A-SBAAA and Fig. A-SFAAA: DAMAGE WAS FOUND YES NOT
If thermographic and tap test inspections confirm liquid ingress damages, in accordance with the AMM Task 55-20-00-200-006-A01, refer to SRM 55-21-11 and SRM 55-20-00 for: damage evaluation, total damage area calculation, definition of repair zones, allowable damage limits and applicable repair.
M
I
I
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 12 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
If thermographic and tap test inspections do not confirm liquid ingress damages, repeat the inspections at interval given in PLANNING INFORMATION table 3.
F. Subtask 551046-280-608-001 - Do a Thermographic Inspection of the RH
Elevator Top and Bottom Skin Panels.
(a) Do the Special Detailed Thermographic Inspection of Elevator Top and
Bottom Skin Panels as per the NTM 55-20-07 Method B and Tap Test Inspection on and around the liquid indications as per NTM 51-10-03, in accordance with the AMM Task 55-20-00-200-006-A01, refer to Fig. A-SBAAA and Fig. A-SFAAA: DAMAGE WAS FOUND YES NOT
If thermographic and tap test inspections confirm liquid ingress damages, in accordance with the AMM Task 55-20-00-200-006-A01, refer to SRM 55-21-11 and refer to SRM 55-20-00 for: damage evaluation, total damage area calculation, definition of repair zones, allowable damage limits and applicable repair.
If thermographic and tap test inspections do not confirm liquid ingress damages, repeat the inspections at interval given in PLANNING INFORMATION table 3.
I
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 13 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 14 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
B. Subtask 551046-941-602-001 - Job Set-up.
(a) Make sure that the aircraft is electrically grounded (Refer to AMM Task 12-34-24-869-002). (b) Do the Job Set-Up procedure as specified in the Task "Special Detailed Inspection (Thermographic) of Elevators Top and Bottom Skin Panels, LH/RH without Elevator Removal" (Refer to AMM Task 55-20-00-200-006-A01).
C. Subtask 551046-280-606-002 - Identify LH PN affected.
M
M
I
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 15 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
(a) Check the Part Number (PN) of the LH Elevator: 1. If the first 12 digits of the PN are not in the following list, no further
action is required. - All aircraft serial numbers (MSNs) with elevators pre-Mod. No. 35515 that do not have SB A320-55-1042 (Mod No. 150390) embodied. These elevators have part numbers for which the first 12 digits are as follows: . LH Elevator: D55280001000, D55280001002, D55280001004, D55280001008, D55280001010, D55280001012. - All aircraft serial numbers (MSNs) with elevators pre-Mod. No. 35515 that have SB A320-55-1042 (Mod No. 150390) embodied. These elevators have part numbers of which the first 12 digits are as follows: . LH Elevator: D55280003000, D55280003002, D55280003004, D55280003006, D55280003008, D55280003010, D55280003012, D55280003014, D55280003016, D55280003018, D55280003020, D55280003022, D55280003024, D55280003026, D55280003028, D55280003030, D55280003032, D55280003034. 2. If the first 12 digits of the PN are in the above list, do the following
applicable subtasks. NOTE: In case the affected elevator has not been transferred into another aircraft, maintenance records from SB A320-55-1040 accomplishment can be used as and alternative to check installed elevator PN and SN. NOTE: Physical check of elevator PN installed on a dedicated aircraft is not required when subject elevator has already been physically identified and maintenance records can demonstrate its current allocation to an aircraft MSN.
D. Subtask 551046-280-607-002 - Identify RH PN affected.
M
M
I
I
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 16 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
(a) Check the Part Number (PN) of the RH Elevator:
1. If the first 12 digits of the PN are not in the following list, no further action is required.
- All aircraft serial numbers (MSNs) with elevators pre-Mod. No. 35515 that do not have SB A320-55-1042 (Mod No. 150390) embodied. These elevators have part numbers for which the first 12 digits are as follows: . RH Elevator: D55280001001, D55280001003, D55280001005, D55280001009, D55280001011, D55280001013. - All aircraft serial numbers (MSNs) with elevators pre-Mod. No. 35515 that have SB A320-55-1042 (Mod No. 150390) embodied. These elevators have part numbers of which the first 12 digits are as follows: . RH Elevator: D55280003001, D55280003003, D55280003005, D55280003007, D55280003009, D55280003011, D55280003013, D55280003015, D55280003017, D55280003019, D55280003021, D55280003023, D55280003025, D55280003027, D55280003029, D55280003031, D55280003033, D55280003035. 2. If the first 12 digits of the PN are in the above list, do the following
applicable subtasks.
E. Subtask 551046-280-602-001 - Do a Thermographic Inspection of the LH Elevator Top and Bottom Skin Panels.
M
M
I
I
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 17 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
(a) Do the Special Detailed Thermographic Inspection of Elevator Top and
Bottom Inspection on and around the liquid indications as per NTM 51-10-03, in accordance with the AMM Task 55-20-00-200-006-A01, refer to Fig. A-SBAAA and Fig. A-SFAAA Skin Panels as per the NTM 55-20-07 Method B and Tap Test. DAMAGE WAS FOUND YES NOT If thermographic and tap test inspections confirm liquid ingress damages, in accordance with the AMM Task 55-20-00-200-006-A01, refer to SRM 55-21-11 and SRM 55-20-00 for: damage evaluation, total damage area calculation, definition of repair zones, allowable damage limits and applicable repair. If thermographic and tap test inspections do not confirm liquid ingress damages, repeat the inspections at interval given in PLANNING INFORMATION table 4.
F. Subtask 551046-280-608-001 - Do a Thermographic Inspection of the RH Elevator Top and Bottom Skin Panels.
I
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 18 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
(a) Do the Special Detailed Thermographic Inspection of Elevator Top and Bottom Skin Panels as per the NTM 55-20-07 Method B and Tap Test Inspection on and around the liquid indications as per NTM 51-10-03, in accordance with the AMM Task 55-20-00-200-006-A01, refer to Fig. A-SBAAA and Fig. A-SFAAA:
DAMAGE WAS FOUND YES NOT
If thermographic and tap test inspections confirm liquid ingress damages, in accordance with the AMM Task 55-20-00-200-006-A01, refer to SRM 55-21-11 and refer to SRM 55-20-00 for: damage evaluation, total damage area calculation, definition of repair zones, allowable damage limits and applicable repair. If thermographic and tap test inspections do not confirm liquid ingress damages, repeat the inspections at interval given in PLANNING INFORMATION table 4. Subtask 551046-942-602-001 - Close-up
I
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 19 OF 27
Form R145-38 Rev 0
TASK DESCRIPTION MEC
LICENSE & SIGNATURE
INSPECTOR &
SIGNATURE
ACCOMPLISHMENT INSTRUCTIONS
(a) Do the Close-Up as specified after the Task "Special Detailed Inspection of Elevators Top and Bottom Skin Panels without Elevator Removal" (Refer to AMM Task 55-20-00-200-006-A01).
(b) The result of the inspection must be forwarded to engineering department
with the attached Inspection Report Sheet.
M
I I
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 20 OF 27
Form R145-38 Rev 0
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 21 OF 27
Form R145-38 Rev 0
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 22 OF 27
Form R145-38 Rev 0
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 23 OF 27
Form R145-38 Rev 0
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 24 OF 27
Form R145-38 Rev 0
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 25 OF 27
Form R145-38 Rev 0
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 26 OF 27
Form R145-38 Rev 0
Deviation Record Sheet Paragraph Observation Action Authorized by Performed by
ENGINEERING ORDER N° IM A319/A320-55/1560
Engineering Management Pudahuel, Santiago, Chile
WORK ORDER : …………….
ITEM NUMBER : …………….
ISSUE DATE:
REV:
PAGE:
Jul-04-2014
1 27 OF 27
Form R145-38 Rev 0
DISCREPANCY FOUND PARAGRAPH CORRECTIVE ACTION DETAIL MEC LICENSE
& SIGNATURE
INSPECTOR & SIGNATURE
1
2
3
4
5
6
Recommended