Emulsion Treated Base (EET)

Full Depth Reclamation process that combines emulsion, existing pavement

– Potential addition of add rock, additives (cement/lime/fly ash), water

3

Footer Text Date

EET Process

4

Footer Text Date

EET – Why should I be paying attention?

San Antonio Energy Sector:

– Need more structure

– Can’t raise the profile in most cases

– Limited TCP options

In general terms, looking for options that are:

– Cheap

– Fast

– Durable

5

Footer Text Date

Cheap?

6

Item (2013 project) Unit Price Unit Notes

Emulsion Treatment Existing (8in)

$4.06 SY

Emulsion $3.18 GAL 4 gal/sy

Subtotal (8in) $16.78 SY

Item (August 2015 low bid) Unit Price Unit Notes

Cement Treat Existing (8in) $1.78 SY

Cement $147.48 TON 3% typical application

Subtotal (8in) $3.57 SY

Item (August 2015 low bid) Unit Price Unit Notes

Remove 8in $2.44 SY

New Base $47.38 CY

Cement Treat New (8in) $1.64 SY

Cement $147.48 TON 3% typical application

Subtotal (8in) $15.95 SY

Item (August 2015 low bid) Unit Price Unit Notes

Remove 8in $2.44 SY

Type B (PG64-22) $62.38 TON

Subtotal (8in) $29.89 SY

Reclamation Replacement

Footer Text Date

Cost/Speed Replacement costs did not include:

– Staging area issues

– Reduced lengths of construction that extend construction time

FDR becomes more appealing when addressing phasing

– EET allows for roadway to be open by end of the day

7

Footer Text Date

Durability - stiffness

8

Project District Seismic

Modulus (ksi, 1 day cure)

FWD Modulus (ksi, 2 day cure) Additives

SH16 San Antonio 262 N/A 5% emulsion

FM479 San Antonio

232 N/A 4% emulsion 1% cement

408 N/A 5% emulsion 2% cement

487* N/A 6% emulsion 2% cement

US287 Amarillo 291 207 6% emulsion 3% flyash

FM740 Dallas 360 N/A 4% emulsion 1% cement

* - 7 days after treatment

Footer Text Date

Durability - Benefit

Shrinkage cracks not an issue, as compared to cement treatment with no micro-cracking

9

Footer Text Date

San Antonio Most Recent Project

Frio County in the heart of Energy Sector

Let in July 2013

10

Footer Text Date

SH85

Narrow roadway with high % of trucks

Can’t raise elevation a significant amount (flood plains), needed to keep open to traffic to prevent excessive cost for detours

11

Footer Text Date

SH85

12

Footer Text Date

SH85

13

Good

Not So Good

Footer Text Date

SH85

14

Good

Not So Good

Footer Text Date

SH85 Need to address fluctuation in base thickness

Iterative testing to optimize material modifications

– Increased emulsion content

– Added Cement

15

Footer Text Date

SH85

Finished final surface at end of Summer 2014