View
222
Download
1
Category
Preview:
Citation preview
APPLICATION FOR QUOTATION FOR CDM ACTIVITIES
APPLICATION FOR VALIDATION OR VERIFICATION AND CERTIFICATIONOF A CDM PROJECT ACTIVITY/PROGRAMME OF ACTIVITIES
This form should be completed in full and returned to:
AENOR INTERNACIONAL. S.A.U.Génova, 6 Tel: (+34) 915294961E-28004 Madrid e-mail: medioambiente@aenor.esSpain e-mail: aolmos@aenor.es
Please complete AL L applicable sections of the form in CLEAR PRINT or in type.
This form is available in electronic form. Please do not modify the form other than filling in cells provided for this purpose. Any form that is modified will not be recognized as a valid application. Should you have difficulties in filling the form, please contact AENOR.
Please be aware that, in case the offer provided by AENOR is accepted, according to CDM Accreditation Standard AENOR shall have a legally enforceable contract with a project participant or coordinating/managing entity for the provision of validation and verifications/certification services.
INFORMATION ON THE CDM PROJECT PARTICIPANT OR COORDINATING /MANAGING ENTITY
Organization name, (and acronym) in English
Operational language of the organization
Contact person for the CDM project activity, name
Position
Physical address
Tel
Postal address:(If different from above)
Mobile e-mail
R-DTC-109.04 Page 1 of 3
REFERENCE OF TYPE OF APPLICATION
New methodology
CDM validation
PoA and first CPA validation
additional CPA validation
initial verification and certification
periodic verification and certification. N#.....................
other...................................................................
PROJECT ACTIVITY INFORMATION
Is it a small-scale CDM project? YES NO
Is it a Programme of Activities? YES NO
Title of the project/PoA
Methodology Approved Methodology. Number, title and version:
New Methodology. Title:
Sectoral Scope: Host country:
Designated national authority (DNA)
Project Description
Only in case of POAs, define the scope of each one of the CPAs (region, country, province, building, etc.)
Foreseen date to start validation/ verification process
Start date of the project activity
UTM coordinates of the project activity
List of all project participants/CME
Consultancy Organization
Financing Organization
INFORMATION FOR VALIDATIONR-DTC-109.04 Page 2 of 3
Contract period
required (if any):
Liability conditions
(if any):
Have you notified to the CDM EB the purpose of implementation of the project activity?
YES. Date: ……………………….
NO
Documents required to submit a quotation for validation:PROJECT IDEA NOTE (PIN)1,2 OR PDD
Other documents required to confirm and start the validation process:a) Project Design Document (PDD) or Simplified project design document for small-scale CDM
project activities (SSC-PDD)b) CDM-PoA-DD and CDM-CPA-DD in case of a Programme of activities (or the correspondent for
Small scale)c) Baseline study and Monitoring pland) CDM New Methodology (if applicable)e) Written approval of voluntary participation from the DNA (Designated National Authority) of each
Party involved (if available).f) Confirmation by the host party that the Project activity assists it in achieving sustainable
development (if available).g) Completed Modalities of Communication Formh) Other relevant documentation (calculation spreadsheets, financial model)
INFORMATION FOR VERIFICATION / CERTIFICATION
UNFCCC Registration number
for the project activity:
Monitoring period
From: …........…………to: ……...........……………
Contract period
required (if any):
Liability conditions
(if any):
Maximum period to complete the verification process (if any):
Documents required to submit a quotation for verification:REGISTERED PDD 1
Other documents required to confirm and start the verification process:a) Emissions reduction calculation spreadsheet.b) Quality management procedures (if applicable)c) Operation licenses of local authorities (if applicable)
1Minimum information required to submit a conditioned quotation.2If a PIN is sent as relevant project information, a PDD shall be provided to confirm the quotation submitted by AENOR.
Other relevant information:
Name and company of applicant
Date of application
R-DTC-109.04 Page 3 of 3
Recommended