View
215
Download
0
Category
Preview:
Citation preview
DIRECT OWNER DEALING JOBSTRACK RECORD REFERENCES ( YEAR 1989 – 2001 )
COUNTRY NORWAYCLIENT BERGESEN DY ASAVESSEL NAME JOB DESCRIPTIONHELIKON Tank Gauging System
Tank Temperature Monitoring System Tank Pressure Monitoring System MARCONI P.A. System Superintendent-In-Charge : Nore Nilsen
VESSEL NAME JOB DESCRIPTIONHAVJARL Tank Gauging System
Tank Temperature Monitoring System Tank Pressure Monitoring System Tank Pressure Transmitter And Indicators Repair / Calibrate Oil Mist Detector, Mark 5 Superintendent-In-Charge : Egil Eriksen
VESSEL NAME JOB DESCRIPTIONHESPURUS Whessoe Tank Gauging System
Tank Temperature Monitoring System Tank Pressure Monitoring System Tank Pressure Transmitter And Indicators Repair Satcom - Model Sat 3s90 Repair Reserve Receiver Drake RR-1 Superintendent-In-Charge : Arne E. Johnson
VESSEL NAME JOB DESCRIPTIONHERMOD Tank Gauging System
Tank Pressure Monitoring System Tank Temperature Monitoring System Modification of Manifold Shutdown With Alarm
From Riser Repair P.C.B. A/E L.O. Inlet Monitoring Replacement of Level Float Switch Cargo Tank Emergency H/L Electronic Temperature Control Main Engine Exhaust Gas Monitoring Calibrate Portable Oxygen Analyzer Gas Detection System Service & Calibrate M/E SHP Torsiometer EEL Calibrate Decade Resistance Box Superintendent In Charge : Nore Nilsen
COUNTRY NORWAYCLIENT BERGESEN DY ASAVESSEL NAME JOB DESCRIPTIONHAVRIM Viscosity Control System
Tank Gauging System Ballast Tank Gauging System Tank Pressure Monitoring System Fluorescent Lights Installation Radar Installation Repair of Deck Valve / Deck Boxes Overhaul Air Motor Repair of Auxiliary Engine Repair TAYLOR SERVOMEX Oxygen Analyzer Renewal of EEX-Junction Boxes Limit Switches Installation Repair Control Room Air Condition Compressor Starter
Panel Repair SALWICO Fire Alarm System Testing Electrical Circuit for Cargo Valve Tank Relay of Deck Actuators Cables & Hatch Cover Cables Renewal of Deck Control Boxes Gasket NUC Light Installation FWD AFT and Japan Red Light
Renewal Superintendent In Charge : Ole Seather
VESSEL NAME JOB DESCRIPTIONHAVMANN Tank Gauging System
Tank Temperature Monitoring ( NKKK ) Tank Pressure Monitoring ( NKKK ) Port & Stbd Hydraulic Gauges Box / Panel Installation of Pump Pressure Indicators Installation of Remote Tank Level System Fabrication & Machining of Fiberglass Panel Superstructure Lighting - Install / Fabricate c/w Junction
Boxes & Brackets Telephone System in Engine Control Room Installation of PLC System for Tank Pressure & Tank
Gauging System Service and Calibrate Oxygen Analyzer Cargo Pump Cable Installation Installation & Commissioning of Tank Top Instruments,
Cabinets, Tubing and Cabling, Fabricate Base Superintendent In Charge : Thore Thomessen
VESSEL NAME JOB DESCRIPTIONHAVSOL Repair of Alarm Modules
Repair of CMR Transducer / Temp. Indicator Repair Viscotherm Port & Stbd Hydraulic Gauges Box / Panel Superintendent In Charge : Eigil Eriksen
COUNTRY NORWAYCLIENT BERGESEN DY ASA
VESSEL NAME JOB DESCRIPTIONHAVFRU Viscosity Meter For Main Engine
Installation of AFT Ex-Proof Floodlight Superstructure Lighting Installation Air Lock Space - CCR and Motor Room Overhaul/Repair Hi-Press Rooms, Units Type MER Omicron High Level & Overfill Alarm System F.O. Tank Level Monitoring System Tank Gauging System Cable Laying For Ext. Alarm, F.O. Level Alarm
Monitoring System Install Revolving Light c/w Junction Box Computer Network Cable Installation Engine Room Alarm System F.O. Tank Sounding System Superintendent-In-Charge : Ole Saether
VESSEL NAME JOB DESCRIPTIONIGLOO MOSS Tank Gauging System
Tank Temperature Monitoring System Tank Pressure Monitoring System Cargo Tanks Alarm
VESSEL NAME JOB DESCRIPTIONIGLOO NORSE Tank Temperature Monitoring System
Tank Pressure Monitoring System Service/Calibrate Enraf Level Gauges Superintendent-In-Charge : Nicolai
VESSEL NAME JOB DESCRIPTIONIGLOO HAV Repair / Renew BEN Electric Motor
Rewind / Renew 3 Phase AEG Electric Motor Master-In-Charge : Master Svein Hoeydahl
VESSEL NAME JOB DESCRIPTIONHEKABE Check / Repair Whessoe Power Supply Unit
Test / Calibrate Pressure Transmitters And Digital Controller
Superintendent-In-Charge : Stig Solheim
VESSEL NAME JOB DESCRIPTIONBERGE CHALLENGER Repair Relay Module
Superintendent-In-Charge : Thor Nielsen
VESSEL NAME JOB DESCRIPTIONHAVVIND Air-conditioning System Repair
Superintendent-In-Charge : Anton Nordahl
COUNTRY NORWAYCLIENT BERGESEN DY ASAVESSEL NAME JOB DESCRIPTIONIGLOO ESPOO Cargo Tank Pressure Gauges
Superintendent-In-Charge : Arne Johnsen
VESSEL NAME JOB DESCRIPTIONHAVJARL Overhaul / Service The Gear Box
Superintendent-In-Charge : Ergil Eriksen
VESSEL NAME JOB DESCRIPTIONBERGE COMMANDER Digital Multimeter
Superintendent-In-Charge :Vigdis Stolan
VESSEL NAME JOB DESCRIPTIONHAVBRIS Check The Viscosity Control And El Motor For Cargo
Pump Superintendent-In-Charge : Tom Christiansen
VESSEL NAME JOB DESCRIPTIONIGLOO TOR Rewind Stator Coil And Ball Bearing
Superintendent-In-Charge : Nore Nilsen
VESSEL NAME JOB DESCRIPTIONHAVPRINS Check / Service / Test Alternator Circuit Breaker
Check M/E Remote Control System Portable Gas Analyzer Superintendent-In-Charge : Thore Thomassen
VESSEL NAME JOB DESCRIPTIONHAVGLIMT Ballast Tank Gauging System
Dismantle 8 Nos. Of Tank Pressure Monitoring System Superintendent-In-Charge : Tom Christiansen
VESSEL NAME JOB DESCRIPTIONHAVKONG Calibrate Decade Resistance Box, Column Mercury
Glass Tube And Pressure Gauges Superintendent-In-Charge : Eigil Eriksen
VESSEL NAME JOB DESCRIPTIONBERGE FISTER Repair AC3 Phase Induction Motor
VESSEL NAME JOB DESCRIPTIONBERGE SISU Repair Autronica PCBs
Master-In-Charge : Master Torstein Berntsen
VESSEL NAME JOB DESCRIPTIONHEKTOR Carry Out Welding Job
Superintendent-In-Charge : Norge Neilsen
COUNTRY NORWAYCLIENT BERGESEN DY ASAVESSEL NAME JOB DESCRIPTIONHAVBRIS Electrical Cable Installation
General Alarm System Fire Alarm System Deck & Lighting System Superintendent-In-Charge : Nore Neilsen
VESSEL NAME JOB DESCRIPTIONBERGE CHARLOTTE
Accommodation Air-Con Evaporators Renewal
FPSO Conversion Supply materials Fabricate Brackets And AHU Fitters Profiles Fabricate / Supply / Install AHU Air-Cond / Ventilation
Ducting, Galley Exhaust Duct, AHU Room Spiral Exhaust Ducting Renewal, Air-Cond S/A Plenum Box / Ducts And Sanitary Exhaust Duct
Supply PVC Sheathed Multicore Polyurethane Tubing Fabricate / Supply / Install Accommodation Air
Conditioning System Electrical Control Panel And Control Equipment.
Tank Level Gauging System Retrofit Accommodation Ladder Pneumatic Control Assist in Testing and Commissioning of Boiler ACC Supply of Starter Panel for Engine Room Motors Superintendent-In-Charge : Arvid Roger Nygard Site Manager : Hugo Skaar Electrical Supt : Thore E Stubberud
VESSEL NAME JOB DESCRIPTIONIGLOO POLAR Rewind Of Induction Motor 210KW 6 POLE
Cable Installation On The New Motor Superintendent-In-Charge : Thore Thomasen
VESSEL NAME JOB DESCRIPTIONBERGE STADT Calibration : Test Gauges Range, MLC Pressure
Calibrator And Temperature Calibrator
VESSEL NAME JOB DESCRIPTIONHAVFRU Installation of Custody Transfer SystemConversion from LPG to LNG Carrier
Installation of New Methane Burner
Installation of New Charlie/Delta Valves on Deck
New Data Communication DEPA/ESD Installation OMICRON High Level Alarm Installation
New Echo Sounder Installation New Radar Installation New Speed Log Installation New Gas Detection System Installation Sat Com B Installation Whessoe Tank Level Gauging System Cargo Control Room Console Retrofit Installation New Ex-proof lighting in Duct-keel New VHF Installation New PA System Installation Modification of Main switchboard Installation of New Sewage Treatment Plant Installation of New TV Antenna System Calibration of Ship’s Test Equipment Calibrations of Cargo Measuring Instrument High Pot test for Starter Panel Rewiring of Starter Panel for Sea water Pump Relocation of Equipment on Chart Table Relocation of Weather fax antenna on Monkey
Island Installation of New Tank Level measuring
Device for Crossover tanks Modification for Cargo Pump Soft Starter Panel Superintendent-In-Charge : Ole Saether
COUNTRY NORWAYCLIENT BERGESEN DY ASAVESSEL NAME JOB DESCRIPTIONBERGE SIGVAL Calibration : Test Gauges
VESSEL NAME JOB DESCRIPTIONHAVKONG Repair / rewind Baumuller Turning Gear Motor
VAFG200 – m8, 18.5kw 41 amps 440volt
VESSEL NAME JOB DESCRIPTIONBERGE COMMANDER Installation of cables for SAT Com. B Back Up
Power Supply Installation of cables for Portside VHF Power
Supply
Renewal of back up batteries for Damatic Power Supply Rectifier and CPU rack
High level and overfill alarm system installation
Tank gauging system Tank temperature monitoring system Tank pressure monitoring system Installation of cables for Inert Gas Infra-Red
Gas Monitoring System Renewal of back up batteries for Damatic
electronics cards Superintendent In Charge :Per Olav Roed
VESSEL NAME JOB DESCRIPTIONHAVSOL Installation of Compressor Room and Engine
Room test valves Installation of 16sets Valve Open and Close
Switch Tank Temperature Monitoring System Tank Pressure Monitoring System Repair of Rotating Lamp Power Supply Tank pressure monitoring system Tank gauging system Service and test LGA Gastechnik Gmbh
Alarm, Logic and Control Modules Installation of Compressor Room test valves Superintendent In Charge : Arne Johnsen
VESSEL NAME JOB DESCRIPTIONHERMION Repair cargo tank level gauge remote digital level
indicator
VESSEL NAME JOB DESCRIPTIONBERGE CLIPPER High Level Alarm Retrofit / Installation
Superintendent In Charge : Lars Wiger
VESSEL NAME JOB DESCRIPTIONBERGE CHALLENGER High Level Alarm Retrofit / Installation
Superintendent In Charge : Lars Wiger
VESSEL NAME JOB DESCRIPTIONBERGE HUS High Level Alarm Retrofit / Installation
CCR Inert Gas Monitoring SystemSuperintendent In Charge : Erik Bruu
COUNTRY NORWAYCLIENT BONA SHIPPING ASVESSEL NAME : JOB DESCRIPTION
BONA SPRING Taylor Oxygen Analyzer Installation Inert Gas Pressure Transmitters Calibration Ballast Tank Gauging System & Draft Gauging System M/E Control Pneumatic Valves Cargo Pump Turbine Safety Trip System Tank Cleaning Heater Temperature Control System Tank Cleaning Heater Level Control System High Level Alarm Installation Generator No.3 Volt Regulators & Excitation Control Superintendent In Charge : Finn Ahiquist
VESSEL NAME : JOB DESCRIPTIONBONA SPARROW Hydralift Hosehandling Crane
Repair Fuel Oil Blender M.E.F.O. Tank Gauging System Ballast Tank Gauging System & Draft Gauging System High Level Alarm System Installation Pump Pressure Transmitter & Receiver Gauges in Cargo
Control Room Overhaul the M/E Jacket Cooling Temp. Controller/ M/E SeaWater Temp. Controller / Sea Water Control Valve Cylinder Positioner / Boiler Dump Stream Superintendent In Charge : Finn Ahiquist
COUNTRY NORWAYCLIENT AKTIESELSKABET BORGESTADVESSEL NAME : JOB DESCRIPTIONREFORM Supply and fabricate Hydraulic Hose
Repair of Anchor Winch / Hydraulic Crane Overhaul of Axial Piston Pumps Fire Alarm System Overhaul of Cargo Crane
VESSEL NAME : JOB DESCRIPTIONBANDAK Check / Service AVR Units
COUNTRY NORWAYCLIENT HYDROSHIP SERVICESVESSEL NAME : JOB DESCRIPTIONHAI GAS Tank Pressure Monitoring System
Tank Temperature Monitoring System Repair of Precision Potentiometer Repair of Gas Detection System Channel Unit Superintendent In Charge : Per H. Sletteroed
VESSEL NAME : JOB DESCRIPTIONOSCAR VIKING Fire Alarm Detection System: CERBERUS, TYPE
FIDENI-CM – check, test and repair Repair of manuoevering printer on bridge of main engine Check, inspect and calibrate : -
Pressure calibrators, digital pressure indicators, temperature calibrators, simulators, field calibrators, digital pressure/ vacuum manometer,Digital pyrometer and gas analyser
Superintendent In Charge : Even Navjord
VESSEL NAME : JOB DESCRIPTIONBONITA Repair of Honeywell 15ppm Monitor
Automatic Exchange Telephone Superintendent In Charge : Even Navjord
COUNTRY NORWAYCLIENT JO TANKERSVESSEL NAME : JOB DESCRIPTIONJO REDWOOD Viscotherm
Power Management Control for Generators Electronic Meter Calibration STBD Life Boat Hydraulic System
Port & Stbd Life Boat Emergency Operations Superintendent In Charge : Eigil Hansen
VESSEL NAME : JOB DESCRIPTIONJO OAK Overhaul of Deck Crane
Overhaul of Pneumatic Valves and Pressure Regulators for Main Engine Remote Control System Superintendent In Charge : Eigil Hansen
VESSEL NAME : JOB DESCRIPTIONJO LONN Overhaul, adjust & service :
Viscosimeter Auxilliary Engine Viscosimeter Main Engine Temperature Controller Tanker Heater Switch Superintendent- In-Charge : Magne Aalen
COUNTRY NORWAYCLIENT SKIBSAKSJESELSKAPET SOLVANGVESSEL NAME : JOB DESCRIPTIONHEROS Repair ADF Receiver
Installation of Battery Charger Power Pack Installation GMDSS Installation Rewind & Overhaul of Motors Portable Gas Instruments Calibration Check / Testing of Echo Sounder Superintendent In Charge : Olaf B Hansen
COUNTRY DENMARKCLIENT TSCHUDI & EITZEN INT’LVESSEL NAME : JOB DESCRIPTIONSITA MARIE Fire Alarm System
Telephone System Hydraulic Control Valves Indication System Superintendent In Charge : Einar Nilsen
VESSEL NAME : JOB DESCRIPTION
BURWAIN SCANDIC Rewind/Renew Electric Motor Type, HXUR 11C G-1 Rewind/Renew ASEA 3 Phase Induction Motor
COUNTRY INDIACLIENT SESA SHIPPING PVT LTDVESSEL NAME : JOB DESCRIPTIONORISSA Exhaust Gas Boiler
Compressor Air Pressure Control System Air Condition and Refrigeration Air Con Evaporator Coil Chemical Cleaning Air Con System Operation Check & Repair Refrigeration Compressor Overhaul Refrigeration System Repair Oily Water Separator Repair
COUNTRY IRELANDCLIENT RATHNEW SHIPPING LTDVESSEL NAME : JOB DESCRIPTIONRATHNEW Repair of : -
Stbd Boiler Control Intercom Telephone System Boiler Burner Controller Oily Water Monitor Replacement / Commissioning of Oil Content Monitor
Panel Boiler Temperature Regulating Control Main Switchboard Generator Bow Thruster Control System
COUNTRY VIETNAMCLIENT VIETSOVPETROVESSEL NAME : JOB DESCRIPTIONHOANG SA Check, Service and Repair of
Oil Reservoir Pneumatic System Anchor Winch Hydraulic System Anchor Winch Axial Piston Pump Hydraulic Pump for Tuggerwinch
Modification Cargo Crane Superintendent In Charge : Kdang Kim Chinh
COUNTRY GREECECLIENT SEATRADE COMPANIA MARITIMAVESSEL NAME : JOB DESCRIPTIONM/T PSARA Inert Gas System
Superintendent In Charge : A. Syrigos
VESSEL NAME : JOB DESCRIPTIONNIKI Repair Shaft R.P.M. Indicator
Repair Alarm PCB Card No. 2 Turbine Speed Indication System Cargo Valve Hydraulic System Norsk Laying and Installation of S/S Tubing on New Control
Boxes for Deck Hydraulic Control System Superintendent In Charge : A. Syrigos
COUNTRY GERMANYCLIENT MARTIME –GESELLSCHAFT VESSEL NAME : JOB DESCRIPTION CSAV SEATTLE Voyage Installation Of Reefer Sockets
Superintendent In Charge :Capt. Michael Kruger
VESSEL NAME : JOB DESCRIPTIONNAVIGATOR MARS Laying of cables from Emergency Generator
Switchboard to Emergency Fire Pump Room Superintendent In Charge : Capt F. Marrek
COUNTRY SINGAPORECLIENT P & O CONTAINERSVESSEL NAME : JOB DESCRIPTIONCARDIGAN BAY Calibrate Pressure Gauges
Check and Testing of Port CO2 Meter and Alarm Setting (Euro Gauge)
Supplies of Tachometer and gauges
COUNTRY SINGAPORECLIENT SEMBAWANG SHIPYARD LIMITEDVESSEL NAME : JOB DESCRIPTIONFPSO PROSTOR II Conversion of Vessels -FPSO Conversion Hydraulic Piping Works
Electrical Works Piping Job For Accommodation Hot & Cold Water
Lines Main Deck Steam & Condensate Line For Utility
Engine Room Steam, Condensate & Desuperheated Steam Line
COUNTRY SINGAPORECLIENT TIDEWATER MARINE INT’L PTE LTDVESSEL NAME : JOB DESCRIPTIONSTAR TIDE I Check & Repair MEMAC 4.0 Alarm Monitoring
System Superintendent In Charge : Peter Doenicke
VESSEL NAME : JOB DESCRIPTION
LEOPARD TIDE Check & Repair Compressor Control System Superintendent In Charge : Peter Doenicke
VESSEL NAME : JOB DESCRIPTIONSYDNEY TIDE II Design, Supply & Install Engine Alarm Monitoring
System Check, Calibrate & Test Main Engine & Auxiliary
Engine Shutdown System Supply & Install Low Level L.O. Sump Tank Alarm Superintendent In Charge : Peter Doenicke
VESSEL NAME : JOB DESCRIPTIONSWAN TIDE Check , Service , Adjust Calibrate & Test :
Engine Room Temp. Sensors & Temp.Switches Main Engine & Auxiliary Engine Pressure TX F.O. Tank Level Transmitter Engine Room Level Float Switches Superintendent In Charge : Peter Doenicke
VESSEL NAME : JOB DESCRIPTIONNAKARI TIDE Check , Test , Adjust and Rectify Faults on the :
Air Reducing Station For Main Engine Pneumatic Control System
Superintendent In Charge : Peter Doenicke
COUNTRY SINGAPORECLIENT THOME SHIP MANAGEMENT PTE LTDVESSEL NAME : JOB DESCRIPTIONPANDA Provide Engineers To Carry Out Installation of the
Valve Control System MEP 2000 Re-conditioning On-Off Feedback Sensors Repair Of Actuator Position Indicators & Continuous
Position Indicators Superintendent In Charge : Raul Matovic
COUNTRY MALAYSIACLIENT BARBER SHIP MANAGEMENT VESSEL NAME : JOB DESCRIPTIONGRUS Repair PCB Cards
Repair Bilge Alarm PCB Repair Temperature Controller Superintendent In Charge : Naren Puri
VESSEL NAME : JOB DESCRIPTIONFORZA Repair / Calibrate Portable Oxygen Analyzer
Repair / Calibrate Explosimeter Repair Oil Content Meter Superintendent In Charge : Naren Puri
VESSEL NAME : JOB DESCRIPTIONYUYO BREEZE Repair Oil Content Meter
Repair / Calibrate Explosimeter Repair / Rewind Pneumatic Light Motor Superintendent In Charge : Naren Puri
VESSEL NAME : JOB DESCRIPTIONOCEAN KMIR Smoke Detection System
Repair Alarm Monitoring PCB Rewind Electrical Motor 440V 60Hz 0.5hp Superintendent In Charge : Naren Puri
VESSEL NAME : JOB DESCRIPTIONCORAL PRINCESS Repair of Alternator Exciter
Repair Alarm Monitoring PCB Rewind Electrical Motor 440V 60Hz 0.5hp Repair / Rewind of Electric Motor Reversible Type
With Mechanical Devices and Control Switch Manufacture of Magnetic Coil For Contactor Superintendent In Charge : Naren Puri
VESSEL NAME : JOB DESCRIPTIONASIAN CENTURY Repair of MSA Oxygen Indicator
Repair of Riken Portable Combustible Detector Superintendent In Charge : Naren Puri
VESSEL NAME : JOB DESCRIPTIONFRECCIA Repair / Calibrate Oil Content Meter, OCD-1 15 PPM
Superintendent In Charge : Naren Puri
VESSEL NAME : JOB DESCRIPTIONSHOHJIN Repair / Calibrate Oily Water Separator, 15PPM Alarm
Motor
VESSEL NAME : JOB DESCRIPTIONGAS RISING SUN Gas Detector Servicing
COUNTRY PHILIPPINESCLIENT ABOITIZ BULK TRANSPORT CORP.VESSL NAME : JOB DESCRIPTIONSUPERCAT 6 Engine Room Alarm Monitoring System
Superintendent-In-Charge : Mr. Ludwug
VESSL NAME : JOB DESCRIPTIONSUPERCON CARRIER 1 Tokimec ESII Gyro Compass
Generator No. 1 - Repair & Trouble-shoot Superintendent-In-Charge : Rolando Aguilar
VESSL NAME : JOB DESCRIPTIONABOITIZ MEGA No. 1 DERRICK Gooseneck InstallationCARRIER 1 Magnetic Compass
SATCOM C.MAKE SATURN NERA RPM Indication In Bridge & Chief Engineer Room RADAR NO. 1 & 2 Installation of Safety Slewing Alarm Sensors ALARM SENSORS RADAR MODEL : TOKOYO KIEKI MR 100 Calibration of Pressure Switches & Transmitters Superintendent-In-Charge : Rolando Aguilar
VESSEL NAME : JOB DESCRIPTIONFRAMNES Generators No. 1 & 3
Rewinding of AVK Alternator Commissioning of No. 2 Generator New Alternator Installation Superintendent-In-Charge : Rolly Aguilar
VESSEL NAME : JOB DESCRIPTIONFURUNES Gas Detector – Calibration
Superintendent-In-Charge : Mr. Basil
COUNTRY PHILIPPINESCLIENT ABOITIZ BULK TRANSPORT CORP.VESSEL NAME : JOB DESCRIPTIONMABUHAY SUNSHINE Main Engine Protection Devices Alarm and Shutdown
(Port & STBD) Sperry Stabilizer Control System Speed Log Main Engine Remote Control System
VESSEL NAME : JOB DESCRIPTIONRAMON ABOITIZ Public Address System
E/R Tank Level Monitoring System Bridge Telegraph Superintendent-In-Charge : Rolly Aguilar
VESSEL NAME : JOB DESCRIPTIONSUPERFERRY 6 Public Address System
Installation of Fire Alarm System Transfer of Call Points From Accommodation Fire
Alarm Panel to Engine Room Alarm Panel STBD Main Engine Clutch System Installation of Ext. Horn and Revolving Light for Engine Control Room Telephone Main Bearing Temperature Monitoring System Power Battery Telephone OKI-NHE Marine Common Battery Telephone System Accommodation Fire Alarm System - Installation &
Commissioning Bilge Alarm Installation Auxiliary Engine Alarm Monitoring and Safety Devices
for 3 sets Generators Port Main Engine Remote Control, Telegraph and
Wrong Way Alarm STBD Main Engine Remote Control, Telegraph and
Wrong Way Alarm Installation of Marine Telephone from OKI Telephone
Exchange Ground Shafting System
Rudder Indicator Main Engine Exhaust Gas Monitoring System (Port &
STBD) Wind Direction Indicator Auto Exchange Telephone System Stabilizer (Port & STBD) Main Engine Remote Control - Installation of the Clutch
Regulating Valves for Port & STBD Engines No. 1 Generator Circuit Breaker Superintendent-In-Charge : Louis Tan
COUNTRY PHILIPPINESCLIENT ABOITIZ BULK TRANSPORT CORP.VESSEL NAME : JOB DESCRIPTIONSUPERFERRY 7 Main Engine Protection Devices Alarm/Shutdown(Port
& STBD) Turning Gear(Main Engine Remote Control) Stabilizer Engine Room Fire Detection System Accommodation Fire Alarm System Generators Safety Devices Alarm and Shutdown Wagon Deck Fire Alarm System
VESSEL NAME : JOB DESCRIPTIONSUPERFERRY 8 Fire Alarm System
Common Battery Telephone System (Bridge to Steering Gear Room)
Auxiliary Engines Alarm Monitoring System Emergency Lighting System Echo Sounder Modify Ext. Fire Alarm for Engine Room and
Accommodation Fire Detection System Superintendent-In-Charge : Fex S. Engracia
VESSEL NAME : JOB DESCRIPTIONSUPERFERRY 10 Intercom System
Fire Alarm System (Accommodation Area) Fire Alarm System (Engine Room Area) Bilge Alarm System (Engine Room) Main Engine Exhaust Gas Monitoring System Main Engine Jacket Cooling Water, Lub Oil Monitoring
System Main Engine Protection Devices Alarm / Shutdown Main Engine Temperature Monitoring For L.O. Jacket
Cooling Water, & Fuel Valve Main Engine Exhaust Gas Monitoring Fire Alarm System (Bridge) Fire Alarm System (Engine Room) Accommodation Fire Alarm System Superintendent-In-Charge : Mr. Avenido
VESSEL NAME : JOB DESCRIPTIONSUPERFERRY 12 Main Engine Protection Devices Alarm /Shutdown, Port
& Stbd. Generator Alarms and Shutdown Systems Boiler Alarm and Shutdown Systems Fire Alarm System Installation of Wrong Way Alarm Trouble-shoot Port Main Engine Remote Control
System
VESSEL NAME : JOB DESCRIPTIONSUPER RORO 200 Trouble-Shoot Main Engine Remote Control System
Fire Alarm System Ballast Tank Gauging System Bow Thruster Superintendent-In-Charge : Rollie Aguilar
VESSEL NAME : JOB DESCRIPTIONSUPERFERRY 14 Supply & Install New ”THORN” Fire Alarm System
Supply & Install New 220VAC Distribution Panel, 440/220V 3 Phase transfomer
Supply & Install New Wagon Deck Flooding Alarm System
Bow Thruster Superintendent-In-Charge : Rollie Aguilar
VESSEL NAME : JOB DESCRIPTIONLady Of Sacred Heart Repair of Nabco Main Engine Remote Control System
( Tokyo Keiki ) Superintendent-In-Charge : Danny Rouzal
VESSEL NAME : JOB DESCRIPTIONMillenium Tiger Supply and Install New Main Engine Alarm and
Shutdown System Superintendent-In-Charge : Doloroso
VESSEL NAME : JOB DESCRIPTIONMillenium Dragon Supply and Install New Main Engine Alarm and
Shutdown System Superintendent-In-Charge : Doloroso
VESSEL NAME : JOB DESCRIPTIONMillenium Eagle Supply and Install New Main Engine Alarm and
Shutdown System Superintendent-In-Charge : Doloroso
VESSEL NAME : JOB DESCRIPTIONRamon Aboitz Supply and Install New Main Engine Alarm and
Shutdown System Superintendent-In-Charge : Doloroso
COUNTRY PHILIPPINES
CLIENT WG&A JEBSENS SHIP MANAGEMENT INC.VESSEL NAME : JOB DESCRIPTIONM/S “FREDERIKE OLDENDORFF”
Repair And Service : Main Engine Remote Control System, Main Engine Viscosity Control System And G/E Viscosity Control System
Check And Calibrate Ballast Tank Level Gauges & Draft Gauges And Analog Indicators For M/E Monitoring
Check, Calibrate And Test Main Switchboard Safety Devices – 3 Generator Panels
Superintendent-In-Charge : Peter Steiner
COUNTRY HOUSTON, USACLIENT STOLT PARCEL TANKERS, INCVESSEL NAME : JOB DESCRIPTIONSTOLT HELLULAND Supply of Exhaust Gas Temperature Sensor
Supply of Thermocouple Amplifier
VESSEL NAME : JOB DESCRIPTIONSTOLT OSPREY Supply of Light Source Assembly
VESSEL NAME : JOB DESCRIPTIONSTOLT LOYALTY Supply of Basic Connection Card
VESSEL NAME : JOB DESCRIPTIONSTOLT SUNRISE Supply Cargo Tank Overfill Alarm System
Superintendent In Charge : Murray Fulton
VESSEL NAME : JOB DESCRIPTIONSTOLT MAGNOLIA Supply and Commission Vapour Line Pressure
Monitoring System Superintendent In Charge : Murray Fulton
VESSEL NAME : JOB DESCRIPTIONSTOLT LILY Supply and Commission Vapour Line Pressure
Monitoring System Superintendent In Charge : Murray Fulton
VESSEL NAME : JOB DESCRIPTIONSTOLT AZALEA Supply and Commission Vapour Line Pressure
Monitoring SystemSuperintendent-In-Charge : A Kubo
VESSEL NAME : JOB DESCRIPTIONSTOLT SUNRISE Supply and Commission Vapour Line Pressure
Monitoring System Superintendent In Charge : Murray Fulton
COUNTRY DENMARKCLIENT A.P. MOLLER VESSEL NAME : JOB DESCRIPTIONLPG/C RAVNANGER Tank Level Gauging System
Tank Temperature Monitoring System Tank Pressure Monitoring System Superintendent In Charge : Lars Austergarrd
VESSEL NAME : JOB DESCRIPTIONNELLY MAERSK Tank Level Gauging System
Tank Temperature Monitoring System Tank Pressure Monitoring System Superintendent In Charge : Lars Austergarrd
VESSEL NAME : JOB DESCRIPTIONNEILS MAERSK Tank Level Gauging System
Tank Temperature Monitoring System Tank Pressure Monitoring System Superintendent In Charge : Lars Austergarrd
VESSEL NAME : JOB DESCRIPTIONMAERSK SUSSEX Tank Level Gauging System
Tank Temperature Monitoring System Tank Pressure Monitoring System ME Viscosity Control System Superintendent In Charge : Lars Austergarrd
VESSEL NAME : JOB DESCRIPTIONHELENE MAERSK Tank Level Gauging System
Tank Temperature Monitoring System Tank Pressure Monitoring System Superintendent In Charge : Lars Austergarrd
VESSEL NAME : JOB DESCRIPTIONMAERSK SHETLAND Tank Level Gauging System
Tank Temperature Monitoring System Tank Pressure Monitoring System Superintendent In Charge : Lars Austergarrd
COUNTRY NORWAYCLIENT HOEGHVESSEL NAME : JOB DESCRIPTIONHOEGH DUKE Installation & Commissioning of Control and Main
Panel for Air Compressor
VESSEL NAME : JOB DESCRIPTIONHOEGH GALLEON Cargo Tank No 1 to 5 S.S Tubing Installation
Retrofit of Turbo Compressor Control System Boiler Automatic Feedwater Control System Manifold Valve Pressure Gauges Calibrations ESD High Level Alarm S.S Installation Safety Annunciator Panel Fabrication Superintendent In Charge : Bernhard Naess Superintendent In Charge : Captain Andersen Superintendent In Charge : Yan Janrune Morken
Recommended