Development of an Experiential Humanitarian Engineering

Pilot ProgramHenry Louie, PhD*

Steve Szablya, PE**

*Department of Electrical and Computer Engineering**Facilities ServicesSeattle University

Spring/Summer 2011

Funding Sources• SU Global Grant: $9,524• SU Endowed Mission Fund: $6,000• Community Solutions Initiative: $3,000• Professionals without Boundaries: $3,000

Total Funding: $21,524

Dr. Henry Louie 2

Program Goals

1. Develop a humanitarian engineering curriculum and supporting educational materials

2. Increase Seattle University faculty experience and capability in humanitarian engineering projects and in experiential teaching techniques

Dr. Henry Louie 3

Program Goals

3. Expose students through immersion to global humanitarian challenges, and empower them to work toward solutions, culminating in an experiential service experience

4. Strengthen bonds with local and international organizations and communities

Dr. Henry Louie 4

Approach• Discussion Sessions• Workshop Sessions• Immersion

Dr. Henry Louie 5

Discussion Session Details• Held Weekly• 45 minutes in duration• Developed slides• Recommended reading

Dr. Henry Louie 6

Discussion Session Topics• Session 0: Information Session• Session 1: Introduction to Humanitarian Engineering• Session 2: Fundamentals of Wind Energy• Session 3: Energy Poverty• Session 4: Opportunities and Roles of Engineers in

Developing Self-Sustainable Communities*

• Session 5: Micro Credit*

• Session 6: Generator Basics• Session 7: Trivia

Dr. Henry Louie 7

*Guest Speaker(s)

Discussion Session Participation

Number of Attendees• Session 0: 23• Session 1: 22• Session 2: 17• Session 3: 19• Session 4: 8 (evening meeting)• Session 5: 16• Session 6: 16• Session 7: 8 (last week of quarter)

Dr. Henry Louie 8

Average Attendance: 16

Workshop Session Details• Held Weekly• Saturday Mornings• +4 hours in duration• SU Carpentry Shop• Supervised work• Included professionals

Dr. Henry Louie 9

Workshop Session• Special Topics:

Shop Orientation Aerodynamics Welding

Dr. Henry Louie 11

Immersion Trip Participants• Dr. Henry Louie (Faculty)• Steve Szablya (Staff)• Vincent Van Acker (Volunteer)• Ayesha Pirbhai (Student)• Josh Peavler (Student)• Karim Farraj (Student)

Dr. Henry Louie 12

13

Case Study: Zambia

+12 million people• 25% have electricity• per capital energy use: 3.3% of USA

+8 million live in rural communities 50% of rural population have electronic devices

• 4% have access to electricity• Average income: US$5.30/day

14

Case Study: Zambia

Case Study: Zambia

15

What we Brought• Rotors• Stator• Hub assembly• Tools• Misc. Electronic Components

Dr. Henry Louie 16

Our Goals• Determine feasibility of building generator• Make blades, tower• Field test

Dr. Henry Louie 17

Packing

Dr. Henry Louie 18

Immersion Itinerary• Seattle-Lusaka• Lusaka-Livingstone• Livingstone• Chobe (Botswana)• Chikuni• Monze/Lusaka• Chikuni• Lusaka• Lusaka-Seattle

Dr. Henry Louie 19

ZAMBIA

Dr. Henry Louie 21

Dr. Henry Louie 22

Dr. Henry Louie 23

Dr. Henry Louie 24

X Chikuni

Lusaka

Livingstone

230 miles

Dr. Livingstone I presume?

Dr. Henry Louie 25

Dr. Henry Louie 26

Dr. Henry Louie 27

Sunset on the Zambezi

Dr. Henry Louie 28

Safari in Botswana

Dr. Henry Louie 29

Dr. Henry Louie 30

Dr. Henry Louie 31

Dr. Henry Louie 32

Dr. Henry Louie 33

Dr. Henry Louie 34

Dr. Henry Louie 35

Dr. Henry Louie 36

Dr. Henry Louie 37

Dr. Henry Louie 38

Dr. Henry Louie 39

Dr. Henry Louie 40

Dr. Henry Louie 41

Dr. Henry Louie 42

Getting Around

Dr. Henry Louie 43

Our Workshop• No power tools• No lighting

Dr. Henry Louie 44

Fr. Bert’s Wind Turbine

Dr. Henry Louie 45

Where the Wind Blows…

Dr. Henry Louie 46

Option 2

Dr. Henry Louie 47

Dr. Henry Louie 48

Option 3

Wind Speed Measurements• Used local knowledge

to screen locations• Near continuous

readings from 8am to 6pm for 2 days

• Did not record during evening Safety Generally low wind

speed

Dr. Henry Louie 49

anemometer

100

inch

es

And the winner is…

Dr. Henry Louie 50

Dr. Henry Louie 51

X 450 ft

Wind turbine location

Prevailing Wind

Dr. Henry Louie 52

Wind Speed Measurements (Monday/Tuesday)

Dr. Henry Louie 53

0 5 10 15 20 250

2

4

6

8

10

12

14

15-minute average wind speed (mph)

occu

rrenc

es

0 5 10 15 20 250

2

4

6

8

10

12

14

15-minute max wind speed (mph)

occu

rrenc

es

Maximum ValuesAverage Values

Wind Speed Measurements (Friday/Saturday)

Dr. Henry Louie 54

0 5 10 15 20 250

2

4

6

8

10

12

14

instantaneous wind speed (mph)

occu

rrenc

es

Instantaneous Values

Blades• Obtained two 100”

boards• Designed for three 60”

blades

Dr. Henry Louie 55

100 inches

4 foot blades vs. 5 foot blades• Perceived Advantages

Available Easier to construct Cheaper Less weight Faster rotation? Less structural stress

• Disadvantages Reduction of power by 36%

Dr. Henry Louie 56

312

pAP C v

Difference in swept area

5 ft

4 ft

Blades• About 15 person-hours

per blade

Dr. Henry Louie 57

Blades

Dr. Henry Louie 58

Blades

Dr. Henry Louie 59

Blades• Completed blades

Dr. Henry Louie 60

Generator Assembly• Parts premade in Seattle• Assembled in Chikuni, Zambia

Dr. Henry Louie 61

Ready for Assembly

Dr. Henry Louie 62

Generator

Blades

Hub

Assembled Wind Turbine

Dr. Henry Louie 63

Tower• 2.5” diameter steel

borehole pipe• Allowed generator to

rotate (yaw)• Used in water

boreholes• Commonly available• Length: 6m

Dr. Henry Louie 64

Generator assembly

Tower Raising• 3-4 people can lift• Without blades: 60 lbs• With blades: 75 lbs• Lowering is difficult

Dr. Henry Louie 65

Tower Support

Dr. Henry Louie 66

Before After

Removed section

Tower Raising

Dr. Henry Louie 67

cows

Tower Raising

Dr. Henry Louie 68

Tower Support• Two motorcycle tie downs • Nylon rope

Dr. Henry Louie 69

Yaw/Furl • Wind turbine naturally

furls in high wind• Used ropes to yaw

wind turbine

Dr. Henry Louie 70

Yaw/Furl

Dr. Henry Louie 71

Furled Position Facing into the Wind

Charging Circuit

Dr. Henry Louie 72

Va VbVc n

Generator

shortto stop turbine

+

- 12Vbattery

switch

3-phase rectifier

Charging Circuit

Dr. Henry Louie 73

Wind Speed vs. RPM

Dr. Henry Louie 74

0 5 10 15 20 250

50

100

150

200

250

300

350

instantaneous wind speed (mph)

RPMLarge variation due to inertia of blades

Wind Speed vs. TSR

Dr. Henry Louie 75

0 5 10 15 20 250

1

2

3

4

5

6

instantaneous wind speed (mph)

TSR

Very lowTSR, efficiency

Reshaping the Blades

Dr. Henry Louie 76

Inefficient Leading Edge

ReshapedLeading Edge

Wind Speed vs. RPM

Dr. Henry Louie 77

0 5 10 15 20 250

50

100

150

200

250

300

350

instantaneous wind speed (mph)

RPM

Wind Speed vs. TSR

Dr. Henry Louie 78

0 5 10 15 20 250

1

2

3

4

5

6

instantaneous wind speed (mph)

TSR

ImprovedTSR, efficiency

Simulated vs. Actual• Volts per Hz

Simulated: 1.06 Measured: 1.07

• Cut-in RPM Simulated: 85 RPM Measured: 85 RPM

Dr. Henry Louie 79

Performance Data• Idle: 11 mph• Cut-in (battery charging): 15 mph• Max RPM tested: 330 rpm• Maximum instantaneous power output: 75 W• Continuous power output: 5 W

Dr. Henry Louie 80

Lessons Learned• Feasibility of in-country blade and tower

construction proved Balancing blades is difficult

• Matching blades and generator is critical High starting torque needed Very low TSR caused very low efficiency

• Generator as built is too powerful• Security is a challenge

Dr. Henry Louie 81

The Market for Electricity

• Cell Phone Charging: With charger: 1000 Kwacha (US$ 0.20) With shop charger: 1500 Kwacha (US$ 0.30)

• Car Battery Charging: 2500 Kwacha (US$ 0.50) Charged overnight

• LI cellular phone battery capacity: 5 Wh Cost per Wh: US$ 0.04

82

Back-of-envelope calculation:

• Village size: 1000 people• Percent with cellular phones: 15• Charge Frequency: 1/week• Charges per day: 21• Energy required: 105 Wh per day• Wind turbine capacity factor: 15%• Wind turbine size: 30 W• Income: US$4.20/day• Payback time on $500 investment: 120

days83

700W Wind Turbine Costs

• Pipe: $78• Wood: $13• Wire: $0.32/m x 250m = $80 • Magnets*: 24 x $15 = $360 • Resin*: $80 • Hardware*: $130• Rectifier*: $7• Battery: $125• Metal Parts*: $450• Electrical*: $20

84

* Price in the U.S.

Total: US $1343

Cost Considerations• Does not include tools, labor• Price of rare earth magnets increasing and

volatile• Resins, magnets not easy to find• Too big, expensive• Micro loans generally are $500 or less

85

Next Steps• Design 100 Watt wind turbine• Test deploy• Engineer tower structure• Continue to work with local community• Promote as a business opportunity

Dr. Henry Louie 86

0.00 5.00 10.00 15.00 20.00 25.00 30.00Time [ms]

-20.00

-15.00

-10.00

-5.00

0.00

5.00

10.00

15.00

20.00

Y1

[V]

0.00

25.00

50.00

75.00

100.00

125.00

Mov

ing1

.Pos

ition

[deg

]

Maxwell3DDesign2XY Plot 1 ANSOFT

Curve Info Y Axis

Moving1.Position Moving1.Position

InducedVoltage(A_Phase) Y1

InducedVoltage(B_Phase) Y1

InducedVoltage(C_Phase) Y1

Speaking at the Boy’s School

Dr. Henry Louie 87

Dr. Henry Louie 88

Dr. Louie Doing What He Does Best

Dr. Henry Louie 89

A Physics Lesson at the Girl’s School

Dr. Henry Louie 90

National University of Zambia

Dr. Henry Louie 91

Dr. Henry Louie 92

Dr. Henry Louie 93

Acknowledgements• Seattle University Office of Global Engagement• Seattle University Endowed Mission Fund• IEEE Power & Energy Society Community

Solutions Initiative• Engineers without Borders Puget Sound

Professional Chapter

Dr. Henry Louie 94

Videos• Raising The Turbine in Chikuni, Zambia(255.5M)• http://www.youtube.com/watch?v=6qOQk6gl7O8 • Wind Turbine and Electrical Setup in Chikuni,

Zambia(27.1M)• http://www.youtube.com/watch?v=EO38Mo_WJdk • The Wind Turbine Spinning in Chikuni, Zambia(57.87M)• http://www.youtube.com/watch?v=OQ9U7uz8onk • Electric Braking During High Speed Operation in Chikuni,

Zambia(59.45M)• http://www.youtube.com/watch?v=faBwLgE4NE0 • Alternate View of the Turbine Configuration from the bottom

of Dam in Chikuni, Zambia(53.72M)• http://www.youtube.com/watch?v=1qv4B7zy08w

Dr. Henry Louie 95

S C I E N C E A N DE N G I N E E R I N G

Henry Louie, PhDAssistant Professor

Department of Electrical andComputer Engineering901 12th Avenue, Bannan 219P.O. Box 222000Seattle, WA 98122-1090www.seattleu.edu

Tel: (206) 398-4619Fax: (206) 296-5962louieh@seattleu.edu

COLLEGE OF

Recommended