December 2018 E-Newsletter - Poulsbo, Washington · 12/12/2018  · December 2018 E-Newsletter...

Preview:

Citation preview

In This IssueEmployment

OpportunitiesLike Us on Facebook

City Hall ClosuresThank You

Harrison ForceMain/Fjord DriveUtility Project --

Complete!Planning Commission

VacancyForest Rock Lane

Pavement PreservationProject

Give the Gift of Funand Experience

Girls' Volleyball ClinicWinter Basketball

LeaguesDaddy Daughter

Dance

EmploymentOpportunities

The followingpositions are currentlyopen and the City isseeking applications:Police Officer - EntryLevel and SeasonalPublic WorksLaborers. Click herefor the job postings.

December 2018 E-Newsletter

Upcoming City Hall Closures

Due to upcoming holidays and celebrations, City Hall will beclosed December 24th and 25th, open from 8:00-12:00 pmon December 31st, and closed on January 1st.

Additionally, City Hall will be closed from 11:30-12:30 pm onFriday, December 14th for a Employee Appreciation HolidayLuncheon.

Thank You

The City of Poulsbo would like to thank everyone whoparticipated in this year's holiday food drive. City employees,along with members of the community, were able to raise483 pounds of food this year, which was all donated to NorthKitsap Fishline.

Harrison Force Main/Fjord Drive UtilityProject -- Complete!

The City of Poulsbo has completed the improvements to theFjord Drive/Harrison Street Sewer/Water/Storm System. The

water main was replaced and upsized - adding morecapacity and improving fire flow. The sanitary sewer systemwas also upgraded and moved from its current shorelinelocation and rerouted down Fjord Drive up to Harrison. Thestorm sewer system received minor upgrades - improvingdrainage. All utilities were aging and due for upgrades. Thedriving lanes were replaced on Fjord Drive and on the westside of Hostmark Street within the project limits, and thereare ADA upgrades on Hostmark Street. The City thanks youfor your patience during the construction of this project.

Planning Commission Vacancy

If you are interested in serving on the Planning Commission,please submit a completed application to the City Clerk, 200NE Moe Street, Poulsbo, WA 98370. Applicants must residewithin the city limits of Poulsbo, be available to convene ona Tuesday, and have an interest in long range growth andcurrent development. Applications are available on the City's website at thefollowing link: https://cityofpoulsbo.com/boards-commissions/

Forest Rock Lane Pavement PreservationProject

Forest Rock Lane, an important neighborhood collector inour City Network, was built 20 years ago and is in need of anupgrade. Steepness of the road, subsurface water flow, roadbase, and asphalt thickness have all been contributing factorsto condition of the road. This project will rebuild the roadbase, install trench drains, and thicker asphalt will improvethe road. The road will be upgraded from the Central Marketentrance to Caldart Avenue.

This is the first Full Depth Reclamation type of project for the

Like us on Facebook!

Like us on Facebook!

City. The existing road and base is pulverized and used tobuild the new road section on top of it. This means theproject reuses material, reduces the work and materialrequired by the contractor, and shortens the duration of theproject. The project will also include drainageenhancements, ADA upgrades, installation of a radar speedsign, and channelization of the road to slow down traffic.

This project will advertise for bids in December, with actualconstruction happening in Late Spring 2019.

Give the Gift of Fun and Experience

Girls' Volleyball Clinic

Winter Basketball Leagues

Recommended