View
3
Download
0
Category
Preview:
Citation preview
Corporate
References
Residance Projects
Hotels
Offices
Hospitals
Biological Treatment Systems
Schools,Mosque,Kindergarten And Hostels
Our company IMK was established in 1999 in Istanbul and started to work as mechanical contractor in new or revised mechanical installation projects in the field of mechanical installation (HVAC) by growing together with Turkey in the sector which started with heating and plumbing applications. IMK has become a preferred company in the construction industry,which has earned the appreciation and confidence of the contractors and individual customers with its success in the works that it has done and delivered over time. Seasoned and experienced technical staff with solution-oriented working, offering friendly service of teamwork in the foreground, with its young and dynamic structure, aiming to provide the best service as soon as possible . IMK accepts quality, reliability, and customer satisfaction the main principle in all activities.
IMK can offer turnkey solutions with advanced technologies at home and abroad in the HVAC sector, as closely following developing technology ,by the way Project and production understanding can be constantly updated,‘first service’ principle is consisting directing change, respecting the environment,with its employees full of the consciousness and responsibilities , working in national and international standards,it is being progressed with decisive steps to be the highest quality, efficient, reliable and sustainable model as working in national and international standards,
Hoping to work together…
• Accepting international standards, technology and quality as the main principle in all activities, ensuring continuity of customer satisfaction,
• To achieve the highest quality with the lowest cost, delivery of the products just in time by continuously making the quality
• Ensuring the continuity of our customers and employees trust in our company
• Increasing staff quality and satisfaction by showing the importance and sensitivity to all kinds of training and awareness activities that will enable the development of our company
• Emphasizing continuous development and improvement by all units, providing effectively resources
• Working in a mutually beneficial approach based on solution partnership with supplier companies
• Care about performing before and after sales service within rigorously manner and accept it as a principle
• It is committed to meeting the requirements of the ISO 9001:2008 Quality Management System Standard and to continuously improve its effectiveness.
ABOUT IMK ENGINEERING Our Quality Policy
CORP
ORA
TECO
RPORATE
• Plumbing• Heating Installation• Fire Fighting Installation• Naturel Gas Application• Air Conditioning• Ventilating Installation• Automation• Green house built-up and Heating/ Drip Irrigation• Solar Energy Systems• Biological Treatment System
OUR SERVICES
CORP
ORA
TECO
RPORATE
/ Kuzu İnşaat A.Ş. / SEA PEARL MULTI USE COMPLEX PROJECT/ Artaş-Mesa-Kantur İş Ort. / TEMA ISTANBUL RESIDANCE PROJECT/ Kuzu İnşaat A.Ş. / SPRADON VADİ HOUSE PROJECT/ Güryapı İnşaat A.Ş. / METROKENT/ Bulgu İnşaat A.Ş. / MİMARSİNAN HOUSE PROJECT/ Yüzbaşıoğlu İnşaat A.Ş. / ARNAVUTKÖY HOUSE PROJECT/ Özkar İnşaat A.Ş. / SULUKULE HOUSE PROJECT/ YDA-Özkar İnşaat A.Ş. / LAWMAKER HOUSE PROJECT/ Özkar İnşaat A.Ş. / GÜRSU HOUSE PROJECTS/ Özkar İnşaat A.Ş. / KESTEL HOUSE PROJECT/ Kuzu İnşaat A.Ş. / KAYAŞEHİR 8. REGION/ Özkar İnşaat A.Ş. / KAYAŞEHİR 5. REGION/ İnta İnşaat A.Ş. / KIRKLARELİ HOUSE PROJECTS/ Hazinedaroğlu İnşaat A.Ş. / HADIMKÖY HOUSE PROJECTS/ Çakır İnşaat A.Ş. / HADIMKÖY HOUSE PROJECTS/ Özkar İnşaat A.Ş. / SULUKULE HOUSE PROJECT/ Baltaş İnşaat A.Ş. / KAYAŞEHİR 32 CLASSROOMS SCHOOL/ Baltaş İnşaat A.Ş. / KAYAŞEHİR CLASSROOMS SCHOOL/ Özkar İnşaat A.Ş. / GÜRSU CLASSROOMS SCHOOL/ Kuzu inşaat A.Ş. / BÜYÜKÇEKMECE BIOLOGICAL TREATMENT SYSTEMS/ Kuzu İnşaat A.Ş. / SİLİVRİ BIOLOGICAL TREATMENT SYSTEMS/ Kuzu İnşaat A.Ş. / ÇANTA BIOLOGICAL TREATMENT SYSTEMS/ Babacan İnşaat A.Ş. / PRİME SUITES/ Tunç Mimarlık Ltd.Şti. / LADY DİANA HOTEL/ Tunç Mimarlık Ltd.Şti. / BİZANTİUM HOTEL/ Tunç Mimarlık Ltd.Şti. / DALAN HOTEL/ Yıldız Nakliyat İnşaat A.Ş. / DELTA HOTEL/ Titiz Turizm İnşaat A.Ş. / AHŞAP BAZAAR/ Demirciler Sit.Yap.Koop. / AYDAŞ OFFICE BLOCKS/ Akın Textile A.Ş. / AYKA TEXTILE COMPANY/ Özatalay İnşaat Ltd.Şti. / ESNAN DENT HOSPTAL BAĞCILAR/ Özatalay İnşaat Ltd.Şti. / ESNAN DENT HOSPTAL SULTANÇİFTLİĞİ/ Kavakçılık Araş.Enstitüsü / SPECIAL SEED PROJECT/ Zambak Mimarlık A.Ş. / ANAFEN SCHOOL
Some of Our ReferancesCO
RPO
RATE
CORPO
RATE
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name SEA PEARL ATAKÖYAtaköy / İSTANBUL
KAT GYO
Kuzu İnşaat A.Ş.
216.459 m2 (628 Flats,1604 Car Park,Social Complex)
First phase and Second phase whole of the mechanical instal-lation works.
Project Manager : Şükrü ARKADAKALMAZ (Civil Engineer)Mechanical Group Chief : Semih ÇALAPKULU (Mechanical Engineer)
Region
InvestorMain Contractor
Built up AreaProject Detail
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name SPRADON VADİ HOUSE PROJECTBahçeşehir / İSTANBUL
Emlak Flats GYO A.Ş.
Emlak Flats GYO A.Ş.
1037 Flats,Social Complex (164.000 m2)
510 Flats Heating Systems, Ventilating Systems, Individual Cooling Systems, Central Fire Extinguishing Systems,Car park Fire Extinguishing Systems, Plumbing,Mechanical Works
Project Manager : Şükrü ARKADAKALMAZ (Civil Engineer)Mechanical Group Chief : Semih ÇALAPKULU (Mechanical Engineer)
Region
InvestorMain Contractor
Built up AreaProject Detail
Central Fire Extinquishing,Working Presswe 18,5 Bar
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
34 Floors,One Block,241 Flats, 32 pcs 125 kw wallhung boiler were used
AT FIRST
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name METROKENTBaşakşehir / İSTANBUL
Kiptaş A.Ş.
Güryapı İnşaat A.Ş.
1013 Flats, Social Complex, Car Park (150.000 m2)
514 Apartments heating systems,central fire extinguishing systems, parking fire extinguishing systems, plumbing and mechanical installation works.
Project Manager : Semih ÜLGEN (Civil Engineer)Mechanical Group Chief : Lütfi GÜNEŞ (Mechanical Engineer)
Region
InvestorMain Contractor
Built up AreaProject Detail
24 Floors,One Block,182 Flats,18 pcs, 125 kw wallhung boiler were used
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name LAWMAKER HOUSE PROJECTİncek / ANKARA
The Housing Development Administration of Turkey (TOKİ)
Özkar İnşaat A.Ş.
1.062 Flats, Car Park, Social Complex (280.000 m2)
450 Flats Heating Systems, Ventilating Systems, Central Fire Extinguishing Systems, Plumbing,Mechanical Works
Project Manager : Sezgin GÜL (Civil Engineer)Mechanical Group Chief : Mehmet ÇİMEN (Mechanical Engineer)
Region
InvestorMain Contractor
Built up AreaProject Detail
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name SULUKULE HOUSE PROJECTFatih / İSTANBUL
The Housing Development Administration of Turkey (TOKİ)
Özkar İnşaat
577 Flats,Car Park,Offices(75.000 m2)
285 Flats Heating Systems, Ventilating Systems, Individual Cooling Systems, Car Park Fire Extinguishing Systems, Plum-bing,Mechanical Works
Şantiye Şefi : Servet YILMAZ (Civil Engineer)Mechanical Group Chief : Mehmet YORULMAZ (Mechanical Engineer)
Region
InvestorMain Contractor
Built up AreaProject Detail
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name Gürsu HOUSE PROJECTGürsu / BURSA
The Housing Development Administration of Turkey (TOKİ)
Özkar İnşaat A.Ş.
200.000 m2 ( 1.936 Residance and Office)
1100 Flats Heating Systems, Ventilating Systems, Fire Extin-guishing Systems, Plumbing, Natural Gas Applicaiton,Mecha-nical Works
Project Manager : Emin HAYATOĞLU (Civil Engineer)Mechanical Group Chief : Mehmet GÖK (Mechanical Engineer)
Region
InvestorMain Contractor
Built up AreaProject Detail
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name KESTEL HOUSE PROJECTKestel / BURSA
The Housing Development Administration of Turkey (TOKİ)
Özkar İnşaat A.Ş.
90.000 m2 ( 740 Flats )
400 Flats Heating Systems, Ventilating Systems, Fire Extingu-ishing Systems, Plumbing, Natural Gas Applicaiton,Mechani-cal Works
Project Manager : Emin HATAYOĞLU (Civil Engineer)Mechanical Group Chief : Mehmet GÖK (Mechanical Engineer)
Region
InvestorMain Contractor
Built up AreaProject Detail
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name Kayaşehir 5. RegionBaşakşehir / İSTANBUL
The Housing Development Administration of Turkey (TOKİ)
Özkar İnşaat
212.000 m2 ( 1.816 Flats ve Offices)
450 Flats Heating Systems, Ventilating Systems, Fire Extingu-ishing Systems, Plumbing, Natural Gas Applicaiton,Mechani-cal Works
Project Manager : Emin HATAYOĞLU (Civil Engineer)Mechanical Group Chief : Muhammed AĞARYILMAZ (Mechanical Engineer)
Region
InvestorMain Contractor
Built up AreaProject Detail
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name Kayaşehir 8. RegionBaşakşehir / İSTANBUL
The Housing Development Administration of Turkey (TOKİ)
Kuzu İnşaat A.Ş.
110.000 m2 ( 912 Flats ve Offices)
450 Flats Heating Systems, Ventilating Systems, Fire Extingu-ishing Systems, Plumbing, Natural Gas Applicaiton,Mechani-cal Works
Project Manager : Şükrü ARKADAKALMAZ (Civil Engineer)Mechanical Group Chief : Muhsin AĞIR (Mechanical Engineer)
Region
InvestorMain Contractor
Built up AreaProject Detail
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name KIRKLARELİ HOUSE PROJECTSMerkez / KIRKLARELİ
The Housing Development Administration of Turkey (TOKİ)
İnta İnşaat A.Ş.
60.000 m2 ( 456 Flats )
456 Flats Heating Systems, Ventilating Systems, Fire Extingu-ishing Systems, Plumbing, Natural Gas Applicaiton,Mechani-cal Works
Project Manager : Yusuf GİRAY (Civil Engineer)Mechanical Group Chief : Halil Bey (Mechanical Engineer)
Region
InvestorMain Contractor
Built up AreaProject Detail
RESI
DAN
CE P
ROJE
CTS
RESIDANCE PROJECTS
Project Name HADIMKÖY HOUSE PROJECTSHadımköy / İSTANBUL
The Housing Development Administration of Turkey (TOKİ)
Hazinedaroğlu İnşaat A.Ş.
160.000 m2 ( 924 Flats )
924 Flats Heating Systems, Ventilating Systems, Fire Extingu-ishing Systems, Plumbing, Natural Gas Applicaiton,Mechani-cal Works.
Project Manager : Kesin Keskin (Civil Engineer)Mechanical Group Chief : Ayhan GÖK (Mechanical Engineer)
Region
Investor
Main ContractorBuilt up Area
Project Detail
HO
TEL
PROJ
ECTS
Project Name PRIME SUITESBağcılar / İSTANBUL
Babacan İnşaat A.Ş
142 Rooms Hotel, Car Park, Social Complex
142 Rooms Hotel Heating Systems, Ventilating Systems, Cent-ral Cooling Systems, Central Fire Extinguishing Systems, Car Park Fire Extinguishing Systems, Plumbing,Mechanical Works
Project Manager : Yusuf GİRAY (Civil Engineer)Mechanical Group Chief : Halil Bey (Mechanical Engineer)
RegionInvestor
Built up AreaProject Detail
HO
TEL PROJECTS
Project Name LADY DIANA HotelSultanahmet / İSTANBUL
Lady Diana Hotel
Tunç Mimarlık A.Ş.
73 Rooms Hotel,4 Stars
73 Rooms Heating Systems, Central Fire Extinguishing Sys-tems, Plumbing,Central Cooling System,Mechanical Works.
Region
Investor
Main Contractor
Built up Area
Project Detail
HO
TEL
PROJ
ECTS
HO
TEL PROJECTS
Project Name BIZANTIUM HotelSultanahmet / İSTANBUL
Bizantium Hotel
Tunç Mimarlık A.Ş.
60 Rooms,4 Stars
60 Rooms Heating Systems, Central Fire Extinguishing Sys-tems, Plumbing,Central Cooling System,Mechanical Works.
Region
InvestorMain Contractor
Built up Area
Project Detail
HO
TEL
PROJ
ECTS
HO
TEL PROJECTS
Project Name DELTA HotelGebze / KOCAELİ
Delta Hotel
Yıldız Nakliyat A.Ş.
163 Bed Capacity,4 Stars
163 Bed Capacity,Heating Systems, Central Fire Extinguis-hing Systems, Plumbing,Central Cooling System,Mechanical Works.
Region
InvestorMain Contractor
Built up Area
Project Detail
HO
TEL
PROJ
ECTS
HO
TEL PROJECTS
Project Name Dalan HotelLaleli / İSTANBUL
Dalan Hotel
Tunç Mimarlık A.Ş.
63 Rooms Hotel,4 Stars
63 Rooms Heating Systems, Central Fire Extinguishing Sys-tems, Plumbing,Central Cooling System,Mechanical Works.
Region
InvestorMain Contractor
Built up Area
Project Detail
HO
TEL
PROJ
ECTS
HO
TEL PROJECTS
Project Name Sulukule Accomodation CenterFatih / İSTANBUL
The Housing Development Administration of Turkey (TOKİ)
Özkar İnşaat A.Ş.
5.000 m2 50 Rooms Hotel
50 Flats Heating Systems, Ventilating Systems, Central Co-oling Systems, Central Fire Extinguishing Systems,Car park Fire Extinguishing Systems, Plumbing,Mechanical Works
Region
InvestorMain Contractor
Built up Area
Project Detail
HO
TEL
PROJ
ECTS
HO
TEL PROJECTS
HO
TEL
PROJ
ECTS
HO
TEL PROJECTS
Project Name AYDAŞ OFFICE BLOCKSZeytinburnu / İSTANBUL
Demirciler Yapı Kooparetifi
Aydaş Management
14.000 m2
A & B Block Plumbing, Central Heating and Cooling System,-Mechanical Works.
Region
Investor
Main ContractorBuilt up Area
Project Detail
OFF
ICES
OFFICES
Project Name AHŞAP BAZAARBaşakşehir / İSTANBUL
Titiz Turizm A.Ş.
Titiz Turizm A.Ş.
8.000 m2 Shopping Center
Central Fire Extinguishing Systems, Plumbing, Central Heating and Cooling System,Mechanical Works.
Region
Investor
Main ContractorBuilt up Area
Project Detail
OFF
ICES
OFFICES
Project Name AYKA TEXTILE COMPANYGüneşli / İSTANBUL
Ayka Textile
Ayka Textile
2.000.000 kcal / h Boiler and Natural Gas Recycle Works
Region
Investor
Main ContractorBuilt up Area
Project Detail
OFF
ICES
OFFICES
Project Name ESNAN DENT HOSPTALSultançiftliği / İSTANBUL
Özatalay İnşaat
Özatalay İnşaat
Central Fire Extinguishing Systems, Plumbing, Central Heating and Cooling System, Ventilating Systems,Mechanical Works.
RegionInvestor
Main Contractor
Built up Area
Project Detail
HO
SPIT
ALS
HO
SPITALS
Project Name ESNAN DENT HOSPTALBağcılar / İSTANBUL
Özatalay İnşaat
Özatalay İnşaat
Central Fire Extinguishing Systems, Plumbing, Central Heating and Cooling System, Ventilating Systems,Mechanical Works.
RegionInvestor
Main Contractor
Built up Area
Project Detail
HO
SPIT
ALS
HO
SPITALS
Project Name BIOLOGICAL TREATMENT SYSTEMSBüyükçekmece / İSTANBUL
İstanbul Waterworks Authority (İSKİ)
Kuzu İnşaat A.Ş.
530.000 m3 / day Capacity Treatment System, Central Buildin-gs, Diffuser Systems,Mechanical Works.
RegionInvestor
Main Contractor
Built up AreaProject DetailBI
OLO
GICA
L TR
EATM
ENT
SYST
EMS
BIOLO
GICAL TREATMEN
T SYSTEMS
Project Name BIOLOGICAL TREATMENT SYSTEMSSilivri / İSTANBUL
İstanbul Waterworks Authority (İSKİ)
Kuzu İnşaat A.Ş.
530.000 m3 / day Capacity Treatment System, Central Buildin-gs, Diffuser Systems,Mechanical Works.
Region
InvestorMain Contractor
Built up AreaProject DetailBI
OLO
GICA
L TR
EATM
ENT
SYST
EMS
BIOLO
GICAL TREATMEN
T SYSTEMS
Project Name BIOLOGICAL TREATMENT SYSTEMSÇanta Management Buildings and Treatment Works
İstanbul Waterworks Authority (İSKİ)
Kuzu İnşaat A.Ş.
530.000 m3 / day Capacity Treatment System, Central Buildin-gs, Diffuser Systems,Mechanical Works.
Region
Investor
Main ContractorBuilt up Area
Project DetailBIO
LOGI
CAL
TREA
TMEN
T SY
STEM
SBIO
LOGICAL TREATM
ENT SYSTEM
S
SCH
OO
LS -
MO
SQU
E - K
INDE
RGAR
TEN
- H
OST
ELS
Project Name TEMA ISTANBUL RESIDANCE PROJECTHalkalı / İSTANBUL
Artaş - Mesa - Kantur Joint Venture
Artaş - Mesa - Kantur - Joint Venture
80.000 m2
IIncluding Kindergarten,primary school,secondary school,high school,totaly built up area is 35.000 squaremeter whole of the mechanical installation works
Project Manager : Zafer AK (Civil Engineer)Mechanical Group Chief : Bekir Ciritçi (Mechanical Engineer)
RegionInvestor
Main ContractorBuilt up Area
Project Detail
SCHO
OLS - M
OSQ
UE t- KIN
DERGARTEN - H
OSTELS
SCH
OO
LS -
MO
SQU
E - K
INDE
RGAR
TEN
- H
OST
ELS SCH
OO
LS - MO
SQU
E - KINDERGARTEN
- HO
STELS
SCH
OO
LS -
MO
SQU
E - K
INDE
RGAR
TEN
- H
OST
ELS SCH
OO
LS - MO
SQU
E - KINDERGARTEN
- HO
STELS
SCH
OO
LS -
MO
SQU
E - K
INDE
RGAR
TEN
- H
OST
ELS
Project Name 24 CLASSROOMS SCHOOLKayaşehir 16.Region / İSTANBUL
The Housing Development Administration of Turkey (TOKİ)
Baltaş İnşaat A.Ş.
24 Clasrooms School and Mosque Heating Systems, Ventila-ting Systems, Merkezi Isıtma Sistemleri, Fire Extinguishing Systems, Plumbing,Mechanical Works.
RegionInvestor
Main ContractorBuilt up Area
Project Detail
SCHO
OLS - M
OSQ
UE - KIN
DERGARTEN - H
OSTELS
SCH
OO
LS -
MO
SQU
E - K
INDE
RGAR
TEN
- H
OST
ELS
Project Name BAKIRKÖY ANAFEN SCHOOLBakırköy / İSTANBUL
Zambak Mimarlık
Fire Extinguishing Systems, Plumbing, Central Heating Systems,Mechanical Works.
RegionInvestor
Main ContractorBuilt up Area
Project Detail
SCHO
OLS - M
OSQ
UE - KIN
DERGARTEN - H
OSTELS
SCH
OO
LS -
MO
SQU
E - K
INDE
RGAR
TEN
- H
OST
ELS
Project Name BAYRAMPAŞA ANAFEN SCHOOLBayrampaşa / İSTANBUL
Zambak Mimarlık
Fire Extinguishing Systems, Plumbing, Central Heating Systems,Mechanical Works.
RegionInvestor
Main ContractorBuilt up Area
Project Detail
SCHO
OLS - M
OSQ
UE - KIN
DERGARTEN - H
OSTELS
SCH
OO
LS -
MO
SQU
E - K
INDE
RGAR
TEN
- H
OST
ELS
Project Name 24/32 CLASSROOMS SCHOOLGürsu / BURSA
The Housing Development Administration of Turkey (TOKİ)
Özkar İnşaat A.Ş.
Fire Extinguishing Systems, Plumbing, Central Heating Systems, Ventilating Systems,Mechanical Works.
RegionInvestor
Main ContractorBuilt up Area
Project Detail
SCHO
OLS - M
OSQ
UE - KIN
DERGARTEN - H
OSTELS
SCH
OO
LS -
MO
SQU
E - K
INDE
RGAR
TEN
- H
OST
ELS
Project Name SPECIAL SEED PROJECTİzmit / KOCAELİ
Seed Research Institute
Greenhouse heating, drip irrigation and Automation.
RegionInvestor
Main Contractor
Built up Area
Project Detail
SCHO
OLS - M
OSQ
UE - KIN
DERGARTEN - H
OSTELS
Recommended