1. Company overview
2. Company background
3. Geography of key current projects
4. Human resources
5. Technical resources
6. Quality control department
7. Pipe shell section
8. Heat treatment
9. Responsibility to the Customer
10. Significant projects over the last five years
11. Projects portfolio
12. Main Facilities of SU-6 Neftegazmontazh, JSC
13. Company card
3
4
5
6
7
8
10
11
12
13
18
27
39 2
Company overview
Company’s resources:
Over 125 large-scale projects for oil and gas industry;
Own production and repair base with a set of tools for the fabrication of pipe spools of large diameter (200÷1400 mm) metal structures;
Modern laboratory exercising quality control of materials and works performed;
Over 400 highly qualified and certified specialists, including 70 welders;
Own training centre of continuing professional education for workers;
Own construction equipment fleet in order to perform a wide range of works.
SU-6 Neftegazmontazh, JSC is a construction and installation company of the South region with wide experience specialized in the following: Installation of industrial pipelines and tanks Welded joints examination by non-destructive method Fabrication of non-standard equipment, pipe spools and metal structures Procurement
3
Company background
•SU-6 was transferred from Welding and Installation Trust to Soyuzmontazhgaz trust and relocated from the city of Bryansk to the city of Stavropol at the end of 1964. •In 60-s and 70-s they performed installation works in the course of the construction of oil and gas complex in the Stavropol Territory. These years the staff of SU-6 was involved in works for facilities of national economic significance in different region of the USSR.
•On June 23, 1980 SU-6 of Soyuzgazmontazh trust integrated into Tsentrkomplektmontazh trust. •Assemblers of SU-6 were the first to develop the largest gas filed “Shatlykskoye” in Turkmenistan and gas condensate facilities in Novy Urengoy and Astrakhan, where large installation organizations were established on the basis of SU-6. They performed the construction of gas pipelines and compressor stations in Azerbaijan, Uzbekistan and the Baltic States, and abroad in collaboration with Germany, Italy, the Chez Republic, the USA, England, Japan, Canada and France.
•On June 21, 1990 Tsentrkomplektmontazh trust was dissolved and SU-6 was renamed in SU-6 Construction and Welding Union “Neftegazmontazh”. •On October 1, 1993 SU-6 became branch of Open JSC Neftegazmontazh SU-6 that was dissolved completely on July 31, 1998. •On August 1, 1998 Subsidiary SU-6 Neftegazmontazh, JSC was established. During the time of drastic reduction in oil and gas construction SU-6 underwent a period of stagnation, was on the verge of bankruptcy, but it was able to keep its main staff and equipment.
•From February 2004 Subsidiary SU-6 Neftegazmontazh, JSC was reorganized into SU-6 Neftegazmontazh, JSC. •From 2001 to 2006 the Company’s staff performed the following large-scale oil and gas industry facilities:
1) Komsomolskaya, Kropotkinskaya and Astrakhanskaya pump stations;
2) Salskaya, Volgogradskaya, Olkhovskaya, Kotelnikovskaya, Zhirnovskaya, Novopetrovskaya, Stavropolskaya and Smolenskaya compressor station.
•In 2007 SU-6 Neftegazmontazh, JSC integrated into Promstroi Group of Companies and began the execution of the following significant projects: 1) Expansion of South Balyk Gas Treatment Plant (the Khanty Mansiysk Autonomous District);
2) ESPO 1 Skovorodino – the PRC’s Border Pipeline; 3) Sakhalin – Khabarovsk – Vladivostok Main Gas Pipeline. Sakhalin gas compressor station. Received certificate ISO 9000.
• In 2009 became member of NPO Self-Regulatory Organization “Builders Alliance” and received Certificate “For Hazardous, Highly Technical and Unique Sub-Facilities”.
•On March 6, 2012 SU-6 Neftegazmontazh, JSC received certificate of conformity to quality management system requirements of GOST R ISO 9001-2008, what is proved by the status of a reliable partner. •On March 20, 2012 being a member of NPO Self-Regulatory Organization “Builders Alliance”, SU-6 Neftegazmontazh, JSC received Work Permit to specific works influencing the security of capital construction facilities. •In 2015 it became a member of SRO “Association of gas and oil complex builders”.
4
Reconstruction of Astrakhan OPS andA-OPS-4A within the project «Expansion of CPC on the
territory of the RF»
Production of butadiene styrene thermoplastic elastomers with the
capacity of 50 000 tons per year Location: Voronezh
Client: SIBUR Holding, JSC
Isomerization complex of pentane hexane fraction
Construction of Kuibyshev-Unecha-Mozyr-1 pipeline section
circumventing Penza
Location: Penza region Client: Transneft, JSC
Pokrovskaya gas treatment plant
Location: the Orenburg region Client : ТNК-ВР, JSC
Increase in natural gas liquids production in South Balyk GTP
in Pyt-Yakh
Location: Pyt-Yakh Client: SIBUR Holding, JSC
Sakhalin-Khabarovsk-Vladivostok main gas pipeline. Sakhalin gas
compressor station
Location: Sakhalin island Client: Gazprom, JSC
ESPO 1 Specialized Oil Loading Seaport
«Kozmino»
Location: the Primorsk Territory Client: Transneft, JSC
Geography of key current projects
- Current projects
Expansion of natural gas liquids processing production No.3 and 6 in
Astrakhan Gas Processing Plant.
- Completed projects 5
Location: Krasnodar krai Client: Chernomortransneft, JSC
Changing of the section of TLUP «Tikhoretsk-Tuapse», Dn500, km. 34, stand-
by line, across the Beisug river. KDOPA.
Location: the Astrakhan Region Client: Transneft, JSC; CPC-R, JSC
Location: Astrakhan Client: GAZPROMSTROIINVEST, LLC
Location: the Saratov region Client: ТNК-ВР, JSC
ESPO 1 Skovorodino – the PRC’s Border
oil pipeline
Location: the Amur Region Client: Transneft, JSC
Location: Tobolsk Client: SIBUR Holding, JSC, Linde Engineering
Polypropylene production plant
Human resources
Number of personnel by categories
Total 332
53 50
155
74 Office and management personnel
Engineering staff
Workers support production
41
39
55 24
143
Number of personnel by subdivisions
SABU"Astrakhan" (Maliy Aral village – Astrakhan region)
Administration
Mechanical Department
Welding Department
Production department No. 1
Pipe Shells and Structural Engineering Department
6
Main staff
3 2
33 3 SABU "Novomalorossiyskaya" (Novomalorossiyskaya village, Krasnodar krai)
SABU "Tyumen", Tyumen city
Power and Energy Utilities Department
Technical resources
7
Type of equipment No. оf units
Excavation and road-building equipment
15
Lifting equipment 29
Mobile personnel facilities 20
Transport facilities 92
Welding equipment 161
Other 34
Total 351
Non-destructive testing laboratory applies the following control methods: - radiographic test - ultrasonic test - dye penetrant inspection method - leak detection method - visual inspection control - electrical control - thickness test
Destructive testing laboratory applies the following mechanical
control methods: - stretching test - static bending test - impact bending test - flattening test - macrosection - metal hardness test - metal spectral analysis
Quality control department Quality Control Department is a structural subdivision of SU-6 Neftegazmontazh, JSC that exposes defects at different stages of work performance.
8
Quality Control
Department
Quality Control Department Quality Control Department has most-up-to-date equipment:
• test machine UMM-50; • pendulum testing machine 2010KM; • visual and measuring testing equipment; • hardness testing machines; • ultrasonic flaw detectors; • steel quality device; • quality control device for insulating covering of
Korona type; • ultrasonic thickness tools;
• surface thermometer of TK-5.60 type; • hesiometer of AMT2-20 type; • X-ray pulse devices “Arina”, “Shmel”; • constant potential X-ray devices “Mart-200”, “RPD-
200”, “RPD-250SP”; • X-ray device of BNDT 10-60 type; • autoprocessor “Agfa”; • image quality indicators; • quality control samples, etc.
X-ray device «SHMEL»
VMT equipment
X-ray device “ARINA”
Steel quality device
Ultrasonic flaw detector
Contact thermometer ТК-5.06
9
Quality control department
Specialists of SU-6 has developed, fabricated and introduced an uncommercial and unique in the territory of the Russian Federation set of tools and devices for pipe spool fabrication of large diameter for compressor and pump stations (diameter 0f 500÷1400 mm) in the shop and in the field
SU-6 Neftegazmontazh, JSC has its own production and repair base with pipe spool and metal structure fabrication workshop. They use advanced methods for submerged arc and gas-shielded welding.
10
Heat treatment
SU-6 Neftegazmontazh, JSC established a subdivision carrying out heat treatment of welded joints and equipment. There are 12 Heat Treatment Operators in the subdivision who are certified on an annual basis.
Works are carried out by means of the heat treatment plant for
welded joints that can be operated both manually and in automatic mode. At least 6 welded joints up to 377 mm each can be processed by means of this plant simultaneously. All devices meant for recording and in-process monitoring have certificates for measuring means.
Total amount of heat-treated joints of different diameters (from 32
mm to 377 mm) at the facility “Saratov Oil Refinery” was about 2000 joints. About 800 joints were heat-treated at “Astrakhan Gas Processing Plant”.
11
Responsibility to the Customer
From February 2015 the Quality Management System of SU-6 Neftegazmontazh, JSC relating to construction reconstruction and overhaul works, that have an impact to safety of capital construction projects corresponds to the international requirements ISO 9001:2008 that is confirmed by the certificate of Intertek Certification Limited, Great Britain
From 2014 SU-6 Neftegazmontazh, JSC is a member of Self-Regulating Organization "Association of gas and oil complex builders" (The Certificate of clearance for a specific type or types of works that influence safety of capital construction projects including highly dangerous and technically challenging facilities" No.0645.01-2014-2635043064-С-084 dated 14.11.2014.
Non-Destructive Testing Laboratory: SU-6 Neftegazmontazh, JSC has testimonial of competence issued by Independent Certification Agency for Non-Destructive Testing Laboratories LLC Firm “Stroiexpert” in Krasnodar certifying that a non-destructive testing laboratory of SU-6 complies with the requirements of non-destructive control system.
С In 2009 Zapadno-Sibirskiy Bank of Sberbank of Russia in the city of Tyumen became a reliable partner of Promstroi Group of Companies that during the cooperation period issued several dozens of its products (credit lines, bank guarantees, payroll programmes) for the Group.
Gazprom’s Certificate confirms the Company’s organizational and technical readiness in order to carry out preparatory, earth, welding and installation, and insulation works, as well as works concerning ballasting and allocation of gas pipelines, void pigging and testing of pipelines and equipment, quality control of welded and insulation coating in the course of capital repairs and reconstruction of gas transport facilities.
In 2007 SU-6 Neftegazmontazh, JSC integrated into Promstroi Group of Companies, a construction and installation Holding Company performing design and construction of large-scale industrial projects of power-producing industry (oil and gas production, transportation and processing), power industry and metallurgy industry. Ten specialized companies of the Russian Federation, the Republic of Kazakhstan and the Republic of Belarus are integrated into Promstroi Group of Companies, which carry out EPC and EPCM projects).
Materials Testing Laboratory: SU-6 Neftegazmontazh, JSC has certificate issued by the Federal Budget Institution “State Regional Centre of Standardization, Metrology and Testing in the Stavropol Territory” that gives the laboratory the right to carry out physical testing of joint welds and their certain parts, weld deposits and their alloy, and measure of hardness of metals.
12
Significant projects over the last five years
Project
Client
Function
Types of works Perfomance period
Booster station
"Volokamskaya" at the gas pipeline
"Yamal – Europe"
Yamalgazinvest, JSC Subcontractor 100 % Installation of technical equipment - 670 t, process pipelines Ø 22-1420 mm – 18.3 km, Valves - 814 pcs.
2007
Process pipelines for depot and between the sites (from PS
No.41 to metering skids No.4) (Primorsk city)
Trest No.68, JSC Subcontractor 100 % Installation of technical equipment - 285 t, process pipelines Ø 32-1020 mm – 9.2 km, Valves - 318 pcs.
2007
Construction of VSTP-10000 No.8 OPS-3 Almetyevsk
PPMR, LLC Subcontractor 100 % Installation of technical equipment, Process
pipelines 2007
Booster station
"Novogryazovetskaya" at the gas pipeline SRTO - Torzhok
SGM, LLC Subcontractor 100 %
Installation of technical equipment – 816 t, Process pipelines Ø 22-1420 mm – 19.5 km,
Valves –914 pcs. 2007
Replacement of sections of toil pipeline
"Zhirnovsk-Volgograd" Dn-500 (section "Efimovka-VNPZ" 84-107 km with
backing rings"
Stroynovatsiya, LLC Subcontractor 100 %
Earthworks, installation and welding, insulation works for pipelines Ø 530
– 23 km
2007
Expansions of Yuzhno – Balykskiy GTP Yuzhno – Balykskiy GTP,
JSC Subcontractor 100 %
Installation of technical equipment – 520 t,
Process pipelines Ø 32-1220– 28.2 km, Valves - 425
pcs.
2008
Reconstruction of VST – 20000 m3 No.14 at
OGS Proteks NPO
Subcontractor
100%
Installation of technical equipment - 520 t, process
pipelines Ø 32-1220– 28.2 km, Valves - 425 pcs. 2008
Construction of oil field named after
Yu.Korchagin
(1 line) New construction of LPS-1"
StroiTransGazEngineerin
g, LLC Subcontractor 100 %
Installation of technical equipment – 170 t,
Process pipelines Ø 32-720 mm – 1.8 km, Valves -
458 pcs. metal piers – 164 t
2008
GTP BS Algay
JSC
Gazpromstroiengineerin
g
Subcontractor 100 % Erection of metal structures of vessel V=20000v3
– 445 t 2008
13
Significant projects for the last five years
Project Client Function Types of works Performance
period
The first line of pipeline
system "VSTO".
Specialized oil seaport "Kozmino".
Utility line area (Big and little).
Onshore facilities site. Offshore
facilities"
TsUP VSTO, LLC Subcontractor 85%
Installation of technical equipment –
1500 t, Process pipelines Ø 32-820
mm – 30 km, PE pipelines Ø 110, 315
mm– 2.6 km Valves - 300 pcs.
2008- 2009
Oil pipeline "Skovorodino – Board with
PRC" TSUP VSTO, LLC Subcontractor 100 %
Installation of technical equipment -
502 t, process pipelines Ø 32-820
mm – 5.88 km, Valves - 214 pcs.
2009-2010
Construction of two vessels VSTP 20
000 m3 No.7, 8 at LODS
"Konda", Uraysk Oil Trunk Line
Division
Sibnefteprovod, JSC Subcontractor 100 %
Erection of metal structures of
vessel V=20000v3 (2 pcs)– 900 t,
Process pipelines Ø 22-720 – 2.1 km
2009-2010
VST-20000m3 No.1.5 LDSP
"Samotlor" reconstruction Sibnefteprovod, JSC Subcontractor
Erection of metal structures of
vessel V=20000v3 (2 pcs)
Installation of equipment and
fitting, pipelines
2011
Construction of Pokrovskaya GTP JSC
Orenburgneftestroi Subcontractor
Erection of metal structures,
equipment, fitting, pipelines 2011-2012
Main gas pipeline
Sakhalin-Khabarovsk-Vladivostok.
GCS Sakhalin
Gazprom, JSC Subcontractor
Installation of technical equipment –
127 pcs/147.7 t Pipe spool – 71 t
Process pipelines Ø 16x1420 – 2.7km
Non-destructive testing of welded
joints.
2011-2012
14
Significant projects for the last five years
Project Client Function Types of works Performance
period
Construction of oil pipeline section
"Kuibyshev-Unecha-Mozyr-1". Bypassing
Penza city
AK Transneft, JSC Subcontractor
Installation of process pipelines Ø 1020 mm –
16776 km. Installation of valves.
Soil remediation. Testing.
Installation of cathodic protection.
2012-2012
Production of styrene-butadiene
thermoelastoplasts, capacity of 50000
tons per year
Voronezh city
SIBUR Holding, JSC Subcontractor Process pipelines Ø 18-530 mm – 2100 m, Valves –
475 pcs. NDT of welded joints. 2012-2013
Saratov Oil Refinery
Expansion of isomerization
of pentane-hexane fraction
Saratov Oil Refinery, JSC Subcontractor
Installation of technical equipment – 110 t,
Metal structures – 101 t,
Installation of pipeline structures – 36 t, process
pipelines Ø 18-325 mm – 14850, Valves –2565 pcs.
2012-2013
Trunk pipeline "Mozdok-Kazi-Magomed"
Chechnya, Gas-measuring station,
capacity of 50-55 mln.m3 per 24hrs at 836
km Dn 1200
Chechengazprom, JSC EPC Contractor
Installation of technical equipment – 130 t,
Process pipelines Ø 22-1220 mm – 1526 m,
Valves –362 pcs.
2012-2013
Section Gas Fractionation Plant 2 of the
project "Expansion of WSLH Processing
Plant no less than 5.8 million tons per
year".
GFP-2. Title 1201
Tobolsk-Neftekhim, LLC Subcontractor
Installation of technical equipment - 600 t,
process pipelines Ø 24 – 1020 – 14 km, Valves -
1299 pcs.
2012-2014
15
Significant projects for the last five years
Project Client Function Types of works Performance
period
Expansion of productions No. 3, 6 on
gas condensate processing at Astrakhan
Gas Processing Plant. Isomerization plant
of pentane-hexane fraction in Astrakhan
city
LLC
Gazpromstroiinvest Subcontractor
Installation of technical equipment and metal
structures. Installation of pipelines Ø 21.3-711mm -
10415 m.
Installation of valves.
2013-2014
Reconstruction of OPS "Astrakhan" and
A-OPS-4A in terms of the project
"Expansion of the Caspian Pipeline in the
Territory of the RF" Astrakhan region.
AK Transneft, JSC, Caspian
Pipeline Consortium – R, JSC Subcontractor
Installation of equipment and pipeline nodes.
Non-destructive testing of welded joints.
Isolation of welded joints.
Installation of valves. Installation of vessels.
2012-2015
"Reconstruction of production of
ethylene oxide and glycol with the use of
highly selective catalysts" Dzerzhinsk city
Sibur-Neftekhim, JSC Subcontractor Installation of equipment and pipeline nodes.
Non-destructive testing of welded joints. 2014
Major overhaul of the facility: "Trunk
pipeline 14.0 from 0 to 14 km
Rozhdestvenskaya-Izobilniy"
Gazprom transgaz Stavropol,
LLC Subcontractor
Installation, dismantling, reisolation of pipeline
Ø1020 mm 2014
Junction point to BS-7, km 98.6.
Gas pipeline "BS Izobilniy-Nevinnomyssk"
I launch complex km 98.6 - km 43.4
Nevinnomyssk city
Gazprom transgaz
Stavropol, LLC Subcontractor
Installation of above-ground and under-ground
pipelines Ø57 – 1220 mm, installation of
equipment. Non-destructive testing of welded
joints.
2014
16
Significant projects for the last five years
Project Client Function Types of works Performance
period
Covered parking for machinery with
administration and amenity rooms and heated
warehouse for storage of centrifugal
adjustable separator; Open air parking for
machinery with shed. OPS "Palkino". Regional
Oil Pipeline Management. construction
Transneft- Baltika, LLC Epc contractor
Erection of precast concrete and reinforced
concrete structures. Erection of metal structures.
Arrangement of external heat supply networks.
Installation works.
2014
"Replacement of section of trunk line
underwater passage "Tikhoretsk - Tuapse",
Dn500, km.34, stand-by line, over Beisug river.
KDORA."
JSC
Chernomortransneft" Subcontractor
Erection of precast concrete and reinforced
concrete structures. Erection of metal structures.
Arrangement of external heat supply networks.
Installation works.
2014-2015
"Installation of diesel hydrotreater" at
Antipinsky oil refinery
YUNIKS, LLC, SD
Tyumen Subcontractor
Erection of precast concrete and reinforced
concrete structures. Erection of metal structures.
Arrangement of external heat supply networks.
Installation works.
2014-2015
LACT unit 433 at LODS "Yaroslavl". Regional Oil
Pipeline Management. Modernization Transneft- Baltika, LLC Epc contractor
Erection of precast concrete and reinforced
concrete structures. Erection of metal structures.
Arrangement of external heat supply networks.
Installation works. Earthworks. installation of
process pipelines
2015
LACT unit at OPS "Yaroslavl-3" "Surgut-
Polotsk. Regional Oil Pipeline Management.
Construction"
Transneft- Baltika, LLC Epc contractor
Erection of precast concrete and reinforced
concrete structures. Erection of metal structures.
Arrangement of external heat supply networks.
Installation works. Earthworks. Installation of
process pipelines
2015
17
VSTP-50000 OPS «Kaleikino», Automatic Subsurface
Firefighting System of Tank Farm «Druzhba 1»,
2006 -2007
20
Industrial pipelines at and between the sites (from
Pump Station No.41 to Metering Unit No.4) Primorsk,
2006 -2007
21
"Section Gas Fractionation Plant 2» of the project
"Expansion of WSLH Processing Plant no less than 5.8
million tons per year», 2012
26
Main facilities "SU-6 Neftegazmontazh", JSC
Item No. Facilities Location Year of construction
1 Winter Rate Stavropol krai 1965
2 Ozek-Saut Stavropol krai 1966
3 Yuzhno-Sukhokumskaya Dagestan 1967
4 Velichayevskaya Stavropol krai 1967
5 Kamysh-Burunskaya Stavropol krai 1967-1968
6 Zhuravskaya Stavropol krai 1969
7 BS of high pressure Stavropol krai 1969
8 Rozhdestvenskaya Stavropol krai 1968
9 Izobilnoye Stavropol krai 1969
10 Kazakh Azerbaijan 1971
11 Agdamskaya Azerbaijan 1971
12 Kazi-Magomed Azerbaijan 1971
13 Ternopolskaya Ukraine 1972-1973
14 Dolinskaya MK-8 Ukraine 1973
15 BCS in Mirny Stavropol krai 1974-1975
16 Dolinskaya Kuper-Bessemer Ukraine 1974
17 Pugachevskaya Saratov region 1975
18 Dolinskaya GTK-10 Ukraine 1975
19 Pallasovka electric motor Volgograd region 1975
20 Pallasovka GTK-10 Volgograd region 1977
21 Sovkhoznaya Orenburg region 1977
22 Alkseyevskaya Orenburg region 1977
23 Georgiyevskaya Stavropol krai 1978
24 Nevinnomysskaya DR-12 Stavropol krai 1977
25 Ostrogozhskaya Voronezh region 1977-1980
26 Gas booster station in Neftekumsk Stavropol krai 1980
27 Arkaulovskaya Bashkiria 1980
28 Polyanskaya Bashkiria 1980
29 Storozhovskaya Saratov region 1980
Booster stations
27
Main facilities "SU-6 Neftegazmontazh", JSC
Item No. Facilities Location Year of construction
30 Smolenskaya Krasnodar krai 1980
31 Sindorskaya Komi Autonomous Soviet Socialist Republic 1981
32 Nevinnomysskaya MK-8 Stavropol krai 1981-1982
33 Meshcherskaya Penza region 1981-1982
34 GPU Dolina Ukraine 1981
35 Toliattinskaya Samara region 1982
36 DGS (Urengoi) Urengoi 1982
37 Egorlykskaya Rostov region 1983
38 Privolnaya Stavropol krai 1983
39 Komsomolskaya Ekaterinburg 1984
40 Reshetilovskaya Ukraine 1986
41 Ananyevskaya Ukraine 1987
42 Ekaterinovskaya Saratov region 1983
43 Siozan Azerbaijan 1983-1984
44 Aksay (Oktyabrskaya) Rostov region 1984
45 Stavropolskaya Stavropol krai 2003
46 Salskaya Rostov region 2003
47 Volgogradskaya Volgograd region 2003
48 Smolenskaya Smolensk region 2003
49 Zamyany Astrakhan region 2004
50 Kotelnikovskaya Rostov region 2004
51 Olkhovskaya Volgograd region 2004
52 Babaevskaya Vologda region 2004
53 Kholm-Zhirkovskaya Smolensk region 2005
54 Novopetrovskaya Stavropol krai 2006
55 Zhirnovskaya Volgograd region 2006
56 Volokolamskaya Moscow region 2007
57 Novogryazovetskaya Vologda region 2007
58 Izobilnyi-Nevinnomyssk Stavropol krai 2014
Booster stations
28
Main facilities "SU-6 Neftegazmontazh", JSC
Gas mains and gas metering stations Item
No. Facilities Location Diameter Length Year of construction
1 Bryansk-Smolensk Bryansk region / Smolensk region 530 84 1964-1965
2 Yuzhniy Sukhokumsk-Kamysh Burun Dagestan 530 40 1965
3 Rozhdestvenskaya-Nevinnomyssk Stavropol krai 720 35 1966
4 Gas pipeline "Bratstvo" Western Ukraine 820 30 1967
5 Approach to Inchukalinskiy UGSF Latvia 720 49.5 1967
6 Mozdok-Nevinnomyssk Stavropol krai 1020 32 1968
7 Mirnyy-Izobilniy Stavropol krai 1020 78 1969
8 Astara-Kazakh Azerbaijan 1020 45 1970-1971
9 Rozhdestvenskaya-Izobilniy Stavropol krai 1020 22 1970
10 Ishcherskaya-Mozdok North Ossetia 530-325 45 1970
11 Valdai-Pskov-Riga Latvia 720 154 1971-1972
12 Mayskoye-Bezmein-Bayram-Ali Turkmenia 530 31.5 1972-1973
13 Georgiyevsk- Mozdok-Luping Stavropol krai 1020 28 1972
14 Ermolinskaya-Kamysh Burun Stavropol krai 1020 31 1972
15 Branch line to Stavropol Stavropol krai 530 24 1972
16 Naip-Khiva Uzbekistan 1020 92 1973
17 Perm-Kazan-Gorkiy Mari AR 1220 73 1973-1974
18 Orenburg-Novopskoy Volgograd region 1220 54 1975-1976
19 Nevinnomyssk-Izobilnoye Stavropol krai 1020 48 1977-1978
20 Kiev-state border Western Ukraine 1420 8 1976
21 Kazi-Magomed-Kazakh Azerbaijan 1020 48 1976-1977
22 Elets-Petrovsk Penza region 1220 36 1979-1980
23 Elets-Kursk Kursk region 1220 43 1981
24 Gryazevets-Mok Kostroma region. 1220 26 1983
25 Ananyev-Ternopol-Izmail Ukraine 1220 16 1987
26 Ananyev-Kremenchug Ukraine 1420 12 1987
27 Urengoy-Novopskov Saratov region 1220 25 1983
28 Branch line to Aktyubinsk TPS Kazakhstan 720 36.8 1990
29 Aktyubinsk-Alga-Oktyabrsk Kazakhstan 530 96.7 1989-1990 29
Main facilities "SU-6 Neftegazmontazh", JSC
Gas mains and gas metering stations
Item No. Facilities Location Diameter Length Year of construction
30 GMS "Stavropolskaya" of gas pipeline
Russia-Turkey Stavropol krai 1420 18,7 2002 – 2003
31 Gas pipeline "Blue Stream" Stavropol krai 1420 7 2002 - 2003
32
Reconstruction of lineal part of main gas
pipeline Orenburg-Novopskov with
installation of launching station of LU at
942 km
Orenburg region 1220 4,6 2002 - 2003
33
Reconstruction of lineal part of main gas
pipeline Petrovsk-Novopskov with
installation of launching station of LU at
475 km
Volgograd region 1420 4,3 2004 - 2005
34
Reconstruction of gas pipeline systems the
North Caucasus - Center in the area of 127
km - BS Izobilnoye. Lineal part Dn1200,
length 21 km
Stavropol krai 1220 21 2005 - 2005
35
Gas pipeline from village Dzuarikau
(Republic of North Ossetia-Alania) to
Tskhinval (Republic of South Ossetia)
Republic of North Ossetia - Alania
Republic of South Ossetia
426 43,3 2007 - 2007
36
Main Gas pipeline Sakhalin-Khabarovsk-
Vladivostok GCH
Sakhalin
Sakhalin region 1420 2,7 2011 - 2012
37
GMS capacity of 50-55 mln. m3 per day at
836 km of main gas pipeline "Mozdok-Kazi-
Magomed"
Republic of Chechnya 1220 1,6 2012 - 2013
38
Major overhaul of the facility: "Trunk
pipeline 14.0 from 0 to 14 km
Rozhdestvenskaya-Izobilniy"
Stavropol krai 1020 8,94 2014
30
Main facilities "SU-6 Neftegazmontazh", JSC
item no.
Facilities Location Year of erection
1 Krasnoarmeyskaya Saratov region 1974
2 Lisichanskaya Ukraine 1975
3 Kastornenskaya Kursk region 1976
4 Sakhranovskaya Volgograd region 1977
5 Armavirskaya Krasnodar krai 1987
6 Sukhodolnenskaya Rostov region 1978
7 Grachevskaya Saratov region 1978
8 Platina Sverdlovsk region 1980
9 Podkumok Stavropol krai 1981
10 Klinskaya Penza region 1988
11 Velikotskaya Ukraine 1981
12 Melovoye Ukraine 1982
13 Astrakhanskaya Astrakhan region 2002
14 Kropotkinskaya Krasnodar krai 2002
15 Komsomolskaya Kalmykiya 2002
16 Primorsk Phase I (Spetsmornefteport) Leningrad region 2004
17 Nevskaya Leningrad region 2006
18 PS No.14 – metering stations No.4 Leningrad region 2007
19 Phase I TS "ESPO pipeline". Spetsmornefteport
"Kozmino". Primorsky krai 2008 - 2009
20 BPS-2 depot Ust Luga Leningrad region 2011 - 2012
21 Zamyany Astrakhan region 2012
Pumping stations and refineries
31
Main facilities "SU-6 Neftegazmontazh", JSC
item no.
Facilities Location Year of erection
1 Neftekumsk gasoline plant No.2 Stavropol krai 1966-1970
2 Stepnoye Dagestan 1969-1970
3 Solonchakovoye Dagestan 1969-1970
4 Russkiy Khutor Stavropol krai 1970-1971
5 GTP BS Algay Saratov region 2008 - 2008
6 Expansion of Yuzhno-Balykskiy GTP Khanty-Mansiisk autonomous district - Yugra 2008 - 2008
7 Increased production of natural gas liquids in the Yuzhno-
Balykskiy GTP, Pyt-Yah city Khanty-Mansiisk autonomous district - Yugra 2011 - 2012
8 Complex of isomerization of pentane-hexane
fraction, Saratov Oil Refinery, JSC Saratov region 2011 - 2012
9 GTU "Pokrovskaya" Orenburg region 2011 - 2012
10 Production of butadiene building
thermoplastic elastomers of Voronezhsintezkauchuk, JSC Voronezh region 2012 - 2013
11 Expansion of complex processing NGL at
least 5.8 million tons per year". GFP-2. Tyumen region 2012 - 2014
12 Complex of isomerization of pentane-hexane
fraction" Astrakhan region 2012 - 2014
13 Reconstruction of production of ethylene oxide and
glycol with the use of highly selective catalysts Nizhny Novgorod Region
2014
Plants and units
Waterlines Item
No. Facilities Location Length Diameter Year of construction
1 Sulak-Makhachkala Dagestan 148.8 530-1220 1967-1970
2 Hauskhan-Shatlyk Turkmenia 48 377 1972
3 Cherkessk-Mineralnye Vody Stavropol krai 30 1420 1976
4 Water mains Republic of Ingushetia 128 108-820 1996-1998
32
Main facilities "SU-6 Neftegazmontazh", JSC
Oil pipelines and product pipelines
33
item no. Facilities Location Diameter Length Year of construction
1 Gorky-Ryazan Ryazan region 530 52 1970-1971
2 Ozek Suet-Malgobek Stavropol krai 530 25 1971
3 Kuybyshev-Tikhoretsk Saratov region 820 31 1974
4 Samotlor-Kuibyshev Tyumen region 1220 22 1975
5 Kuybyshev-Lisichansk Ukraine 1220 68 1975-1976
6 Branch line to Stavropol depot Stavropol krai 420 56 1976
7 Kholmogory-Klin Ulyanovsk region 1220 78 1984-1985
8 Pavlodar-Chemkent Kazakhstan 820 34 1984
9 Chechnya bypass Stavropol krai 820 28 2000
10 Replacement of sections of oil pipeline
"Almetyevsk-Gorky-2 with backing rings Chuvashia 820 24,6 2006
11 Replacement of sections of oil pipeline "Zhirnovsk-Volgograd" (sec."Efimovka-
VORP"84-107km with backing rings Volgograd region 530 23 2007
12 Oil pipeline "Skovorodino – Board with
PRC" Amur region 820 5,8 2009 - 2010
13 Construction of oil pipeline section
"Kuibyshev-Unecha-Mozyr-1". Bypassing Penza city
Penza region 1020 16,8 2011 - 2013
Main facilities "SU-6 Neftegazmontazh", JSC
Steel tanks Item
No. Facilities Location Capacity of stand-by park Year of construction
1 Construction of Sukhokumsk VST-3000 4 pcs .;
VST-2000 2 pcs. Dagestan 16 000 1967
2 Winter rate VST-3000 2 pcs., VST-2 Stavropol krai 10 000 1967
3 Velichaevskoe field VST-3000 4 pcs .; VST-2000 4
pcs. Stavropol krai 20 000 1968
4 Ozek-Saut field
VST-3000 4 pcs .; VST-2000 2 pcs. Stavropol krai 16 000 1968
5 OPS Kamysh-Burun VST-5000 8 pcs. Stavropol krai 40 000 1969-1970
6 Podkumok depot
VST-3000 4 pcs. Stavropol krai 12 000 1977
7 Armavir VST-5000 12 pcs. Krasnodar krai 60 000 1978-1979
8 Dudinka VST-5000 1 pc.
VST-700 2 pcs .; VST-400 2 pcs. Krasnoyarsk krai 8200 1977-1979
9 OPS Krasnoarmeysk VST-2000 3 pcs. Saratov region 6000 1978
10 OPS Platina VST-20000 2 pcs. Sverdlovsk region 40 000 1979
11 OPS Klin VST-20000 2 pcs. Penza region 40 000 1984
12 Ischerskaya depot 5000 4 pcs. Chechen - Ingush Republic 20 000 1968
13 Water supply VST-3000 1 pc. .; VST-2000 1 pc. Shatlyk Turkmenistan 5000 1981
14
Water supply
VST-5000 2 pcs .; VST-3000 3 pcs .; VST-2000 4
pcs.; VST-1000 2 pcs .; VST-700 1pc .; VST-300 2 pcs;. VST-400 1pc.
Republic of Ingushetia 30 400 1996-1998
15 Sheet assembly "Grushovaya" depot VST 1 pc. Novorossiysk Krasnodar Krai 50 000 2003
16 Construction of Vertical steel tank with floating roof No.58 at transfer tank farm "Grushovaya"
Krasnodar krai
50 000 2003
17 Vertical steel tank with floating roof No.17 for
crude oil in a special sea oil port of Primorsk (1st stage)
Leningrad region 50 000 2004
18 Construction of VST with floating roof 4 pcs. at
"Primorsk" depot. IInd line Leningrad region 50 000 2004 – 2005
34
Main facilities "SU-6 Neftegazmontazh", JSC
Steel tanks Item
No. Facilities Location Capacity of stand-by park Year of construction
19 VSTP OPS "Kaleikino", APTS DP
"Druzhba-1" Tatarstan 50 000 2006
20 OTT "Tikhoretskaya" Krasnodar krai 20 000 2006
21 Construction of VSTP No.8 OPS-3
Almetyevsk Tatarstan 10 000 2007
22 Reconstruction of VST 14at OGS Tyumen region 20 000 2008
23 Construction of two vessels VSTP No.7, 8 at LODS
"Konda", Uraisk OTLD Tyumen region 20 000 2009 - 2010
24 VST No.1,5 LODS "Samotlor" reconstruction Khanty-Mansiisk autonomous district -
Yugra 20 000 2011
25 Armavir VST-5000 12 units Krasnodar krai 60 000 1978-1979
35
Main facilities "SU-6 Neftegazmontazh", JSC
Item
No. Facilities Location Year of construction
1 Rasshevatskoye Stavropol krai 1965
2 Severo-Stavropolskoye Stavropol krai 1965
3 Mirnenskoye Stavropol krai 1966
4 Petrovo-Blagodarnenskoye Stavropol krai 1966
5 Takhtinskoye Stavropol krai 1966
6 Takhta-Kugultinskoye Stavropol krai 1967
7 Gathering of oil and gas Sukhokumsk Dagestan 1967
8 Martovskoye Stavropol krai 1968
9 Shatlykskoye Turkmenia 1971-1975
10 Pravoberezhnoye Stavropol krai 1974
11 Kugultinskoye Stavropol krai 1976
12 Ozek-Suatskoye Stavropol krai 1977
13 Yuzhno-Sukhokumskoye Dagestan 1977
14 Mekhtebskoye Stavropol krai 1978
15 Vladimirskoye Stavropol krai 1982
16 Novo-urengoyskoye Urengoi 1981-1984
17 Astrakhanskoye Astrakhan region 1985-1988
18 Stepnovskoye Saratov region 1981-1985
19 Zelenaya Svita Stavropol krai 1982-1990
20 Hodomsky horizon Stavropol krai 1983-1991
21 Kanchurinsko-Musinskiy complex UGSF Bashkiria 2005 - 2006
22 "Construction of oilfield named after Yu.Korchagin (1st line). New
construction of LPS-1" Astrakhan region 2008
Oil and gas field facilities construction
36
Company card
39
Legal name SU-6 Neftegazmontazh, JSC
Main State Registration Number 1022601949105
Date of registration 18.06.1998
Legal address 355035, the city of Stavropol, Staromaryevskoye shosse, 36
Actual address 355035, the city of Stavropol, Staromaryevskoye shosse, 36
E-mail su6@promstroi-group.ru
Taxpayer Identification Number 2635043064
Tax Registration Reason Code 263450001
Russian Classification of Economic Activities 45.21.3 45.21.4 29.12.9 29.13
All-Russian Classifier of Enterprises and Organizations 47782493
Current account (for transactions in RUR)
OJSC ZAPADNO-SIBIRSKIY BANK OF SBERBANK OF RUSSIA,
61, Rizhskaya Street, Tyumen
Current account: 40702810967020000419
Correspondent account Correspondent account № 30101810800000000651
Bank Identification Code 047102651
Director Director General
Motorin Maxim S.
Participants/shareholders JSC Participants/shareholders
Ownership interest (%) 100%
Telephone, fax +7 (8652) 23-00-36; mob. +7 (962) 400-91-30
Recommended