Condition Assessment: City of Bellingham Supply System 2015 PNWS-AWWA Conference

2 Presentation Title

Presentation Topics

1. Background

2. Condition Assessment

1. Wood Stave Intake

2. Tunnel

3. Screen House

4. Pipelines

1. Industrial (48” CCP)

2. Municipal (66” steel)

3. Acknowledgements/

Questions

3 PNWS-AWWA 2015

City of Bellingham

• Population = 83,000

• 13 pump stations

• 13 storage tanks

• 400 miles of pipelines

• One supply system

– Lake Whatcom

– Wood stave intake pipeline

– Tunnel

– Screen House

– Industrial supply pipeline

– Municipal supply pipeline

Lake Whatcom

Supply

Facilities

4 PNWS-AWWA 2015

Water Supply System

5 PNWS-AWWA 2015

Wood Stake Pipe Intake

Wood

Stave

Pipe

Intake

6 PNWS-AWWA 2015

Wood Stave Intake

7 PNWS-AWWA 2015

Wood Condition

8 PNWS-AWWA 2015

Original Steel Rods and SST Bands

9 PNWS-AWWA 2015

Condition of Steel Rods

10 PNWS-AWWA 2015

Flange

11 PNWS-AWWA 2015

Sponge Inside Intake Pipe

12 PNWS-AWWA 2015

Wood Stave Intake: Results

• Wood in good condition

– Support structural components

– Stave pipe (interior and exterior)

• SST bands in good condition

• Original steel fasteners in fair condition

• Some original steel rods corroded to failure

13 PNWS-AWWA 2015

Tunnel

Tunnel

14 PNWS-AWWA 2015

Tunnel Inspection Activities

• Underwater Laser Scanning (2012)

• Man-Entry Inspection (2015)

• Tunnel Data Analysis

15 PNWS-AWWA 2015

Tunnel Profile

7,600 LF

16 PNWS-AWWA 2015

Tunnel Section

17 PNWS-AWWA 2015

Laser Scanning: Field Photos

18 PNWS-AWWA 2015

Laser Scanning: Data Gathered

5 ft

9 ft

3 ft

19 PNWS-AWWA 2015

Laser Scanning: Example Output

REFLECTION OF CRAWLER

20 PNWS-AWWA 2015

Laser Scanning: Interpretation

West

No Defect

s 81%

Mild 12%

Moderate 5%

Severe

2%

East

No Defect

s 68%

Mild 17%

Moderate 13%

Severe

2%

21 PNWS-AWWA 2015

Man-entry Tunnel Inspection

22 PNWS-AWWA 2015

Man-entry Tunnel Inspection

Stationing Crew

Inspection Crew

Insertio

n P

oin

t

Extra

ctio

n P

oin

t

23 PNWS-AWWA 2015

Man-entry Tunnel Inspection

24 PNWS-AWWA 2015

Tunnel: Results

• No major deformation

• Isolated liner defects

• Limited, minor fracture acceleration

• Next Step: Point repairs, monitoring plan

25 PNWS-AWWA 2015

Screen House

Screen

House

26 PNWS-AWWA 2015

Screen House

27 PNWS-AWWA 2015

Screen House Inspection Elements

• Traveling screen

• Slide gates

• Concrete structure

• Steel pipes

28 PNWS-AWWA 2015

Travelling Screens

29 PNWS-AWWA 2015

Slide Gate

30 PNWS-AWWA 2015

Internal Steel Pipe Condition

31 PNWS-AWWA 2015

External Steel Pipes Condition

32 PNWS-AWWA 2015

Screen House: Results

• Concrete structure in good condition

• Travelling screens in good condition

• Slide gates

– Heavy tuberculation

– Some corrosion loss

– Replacement needed

• Steel pipes (3) need rehabilitation

33 PNWS-AWWA 2015

Industrial Pipeline

Industrial

Pipeline

34 PNWS-AWWA 2015

Tiered and Adaptive Plan (TAP)

• Visual

• Corrosion Survey

Tier 1

• Test Pits

• Destructive Testing

Tier 2

• Specialty Tools

Tier 3

Lowest Cost, Identify Issues Higher Cost, Design Data

35 PNWS-AWWA 2015

Soil Corrosivity Mapping Along Industrial Pipeline

36 PNWS-AWWA 2015

Existing Cathodic Protection System

37 PNWS-AWWA 2015

Existing CP Test Stations

38 PNWS-AWWA 2015

Industrial Pipeline: Results

• Existing CP system is operational and

effective

• Condition assessment complete after Tier 1

• No further condition assessment warranted

39 PNWS-AWWA 2015

Municipal Supply Pipeline

Municipal

Pipeline

(Raw

Water)

40 PNWS-AWWA 2015

Tier 1 External - Soil Corrosivity

1,800

49,200

1,800

1,300

3,600

2200

16,300

2900

5600

1,000

10,000

100,000

0+00 2+00 4+00 6+00 8+00 10+00 12+00 14+00

Soil

Res

isti

vity

(o

hm

-cm

)

Pipeline Station

5 to 7.5 ft depth

Slightly Corrosive

Moderately Corrosive

Very Corrosive

Extremely Corrosive (<1,000)

Screen House

Trail at Silver Beach Road

Trail at WTP Access Road

ARV

WTP

41 PNWS-AWWA 2015

Tier 1 External -Stray Current Adjacent Industrial Supply Pipeline CP System

42 PNWS-AWWA 2015

Tier 2 – Internal Condition

43 PNWS-AWWA 2015

Tier 2 Internal – Concrete/Steel Pipe Joint

44 PNWS-AWWA 2015

Tier 2 Internal – Pipe Wall Thickness

45 PNWS-AWWA 2015

Tier 2 Internal - Pitting

46 PNWS-AWWA 2015

Tier 2 Internal – Coal Tar Lining

47 PNWS-AWWA 2015

Tier 2 Internal – Cement Mortar

48 PNWS-AWWA 2015

Municipal Pipeline: Results

• External Tier 1 Complete

– Corrosive soils

– Stray current

• External Next Step: Tier 2 Test Pits

– Evaluate coating/pipe condition

– Test for stray current

• Internal Tier 2 Inspection

– Coal tar enamel lining – excellent condition

– Minor corrosion at coating defects

– Localized repairs at few joints required

49 PNWS-AWWA 2015

Acknowledgments

50 Presentation Title

Thank You

Dan Buonadonna, PE

Daniel.Buonadonna@CH2M.com

Jerry Duppong

Jerry.Duppong@CH2M.com

Phil Martinez, PE

Phil.Martinez@CH2M.com

Bill Evans

bevans@cob.org

Recommended