Guatali Route 2A, Temporary Restoration of Guatali Bridge & EmbankmentContractor: Chi ConstructionCompleted: November 2008Final Cost: $187,704

Route 1 U-Turn Reconstruction (Tamuning)Contractor: Maeda Pacific Corp.Completed: February 2009Final Cost: $137,690

2009 Islandwide Bridge InspectionsContractor: Parsons Brinckerhoff, Inc.Completed: April 2009Final Cost: N/A

Tinaga Bridge Permanent RestorationContractor: BME & Sons, Inc.Completed: August 2009Final Cost: $223,685

Route 15 (in front of DOC, Mangilao)Contractor: Maeda Pacific Corp.Completed: December 2009Final Cost: $649,279

Guardrail Replacement Phase 1Contractor: Orion Construction CorporationCompleted: February 2010Final Cost: $4.54M

Skatepark Barrier/Iglesia Circle Traffic SignalContractor: Kinden Corp.Completed: March 2010Final Cost: $562,923

LED Signal Light UpgradeContractor: Kinden CorporationCompleted: March 2010Final Cost: $521,875

GPS Lock and LoopsContractor: Kinden CorporationCompleted: March 2010Final Cost: $91,255

Pavement Markings Improvement Phase 1Contractor: Nippo ConstructionCompleted: April 2010Final Cost: $2.09M

Pavement Markings Improvement Phase 2Contractor: Highway Safety ServicesCompleted: March 2010Final Cost: $1.63M

Guardrail Replacement Phase 2Contractor: Nippo CorporationCompleted: July 2010Final Cost: $3.22M

Masso River Bridge EmbankmentContractor: Chi ConstructionCompleted: December 2011Final Cost: $330,000

Islandwide & School Zone SignsContractor: Highway Safety ServicesCompleted: December 2011Final Cost: $300,000

Route 2 Culverts & Slide RepairContractor: IMCOCompleted: February 2012Final Cost: $3.8M

Route 15 Embankment Restoration Contractor: International Bridge Corp.Completed: March 2012Final Cost: $650,000

Route 6A Murray Road, Maina-Nimitz HillContractor: Rex InternationalCompleted: April 2012Final Cost: $360,000

Route 8/10/16 Tri IntersectionContractor: Kinden CorporationCompleted: June 2012Final Cost: $5.1M

Route 25 (Alageta Road)Contractor: Guam Construction Co.Completed: July 2012Final Cost: $7.4M

Route 16/GMF Post Office/ Army National Guard Intersection Signal UpgradeContractor: Maeda Pacific Corp.Completed: July 2012Final Cost: $1.5M

North Guam SignalizationContractor: Bejjess Enterprises Inc., GEMCCOCompleted: August 2012Final Cost: $1.1 M

Rehabilitation of Route 4 Bridges (Talofofo & Togcha River)Contractor: Black ConstructionCompleted: August 2012Final Cost: $4.0M

Route 7A ResurfacingContractor: Sumitomo Mitsui Const. Co.Completed: December 2012 Final Cost: $5.5M

Route 4 Resurfacing & Widening (McDonalds to Route 10)Contractor: Hawaiian Rock ProductsCompleted: December 2012Final Cost: $16.6M

Route 17 Rehabilitation & WideningContractor: Sumitomo MitsuiCompleted: February 2013Final Cost: $6M

Route 11 Shore ProtectionContractor: Core Tech InternationalCompleted: April 2013Final Cost: $5.2M

Route 11 Improvements & Traffic Enforcement Screening StationContractor: Core Tech InternationalCompleted: May 2013Final Cost: $16.5M

Taleyfak Bridge RestorationCompleted: May 2013Contractor: Rex International Final Cost: $.9M

Route 4 Resurfacing & Widening (Ylig Bridge to Pago Bay)Contractor: Nippo CorporationCompleted: June 2013Final Cost: $3.8M Ylig Bridge ReplacementContractor: Smithbridge Guam, Inc.Completed: May 2014Cost: $8.1M Asan & Aguada Bridges RehabilitationContractor: Maeda Pacific CorporationCompleted: October 2014Final Cost: $880,000

Route 4, Togcha to Ipan Beach ParkContractor: Nippo CorporationCompleted: October 2014Final Cost: $835,000

Route 4 Agfayan BridgeContractor: Black ConstructionCompleted: April 2015Final Cost: $4.5M

2014 Islandwide Bridge InspectionsContractor: Parsons Brinckerhoff, Inc.Completed: April 2015Final Cost: N/A

Inarajan North Leg (As-Misa)Contractor: IMCOCompleted: June 2015Final Cost: $1.2M

21

Route 20, Maga Haga HighwayContractor: IMCOCompleted: June 2015Final Cost: $7.4M

Route 17 Rehabilitation & Widening Phase 2AContractor: Nippo CorporationCompleted: November 2015Final Cost: $2.7M

Replacement of Welded Petroleum Distribution Piping & Appurtenances Contractor: Rex InternationalCompleted: November 2015Cost: $1.5 M

Route 1 Resurfacing (Yigo – Asan/Piti)Contractor: Nippo CorporationCompleted: November 2015Final Cost: $773,155

Route 25/26 Intersection ImprovementContractor: Korando CorporationCompleted: June 2016Final Cost: $2.9M

Route 1 Signalized Pedestrian Crossing at Chamorro VillageContractor: Maeda PacificCompleted: June 2016Final Cost: $201,400 Route 1/8 Intersection Improvements and Agana Bridges Replacement (Design-Build)Completion: August 2016 Scope: Intersection Improvements & Replace 2 bridgesCost: $15.8MContractor: Core Tech International

Route 20 Tiyan Parkway Structure Demolition, Phase 1Completion: March 2018Scope: Demolish five buildingsCost: $0.6MContractor: Maeda Pacific

Bile/Pigua Bridge ReplacementsCompletion: June 2018Scope: Replace Two BridgesCost: $3.7 MContractor: Korando Corporation

2017 Islandwide Bridge InspectionsCompletion: December 2018Scope: Inspection of bridgesCost: $850,000Contractor: TG Engineers

7

216

2637

27

524

29

30

17

32

22

4

35

33

15

44

20

1

19 18

13

8

2523 36

2

30

28

38 3941

403433

35

COMPLETEDPROJECTSValued at $126MFederally fundedJUNE 2019

3

6

9

10

11

12

14

42 43

45

9

4

10

11

3

5

6

7

8

2

Route 27 (Hamburger Road) Pavement Rehabilitation (Maintenance)Contractor: DPW and Hawaiian Rock ProductsCompleted: June 2017Final Cost: $446,042 Route 26 Pavement Rehabilitation (Maintenance)Contractor: DPW & Hawaiian Rock ProductsCompleted: August 2017Final Cost: $288,854

Route 4 (Umatac) Pavement Rehabilitation (Maintenance)Contractor: DPW & Hawaiian Rock ProductsCompleted: November 2017Final Cost: $601,655

Route 4 Spot Repair Work (Maintenance)Contractor: DPW & Hawaiian Rock ProductsCompleted: April 2016Final Cost: $82,542

Sgt. Roy T. Damian Road Spot Repair Work (Maintenance)Contractor: DPW & Hawaiian Rock ProductsCompleted: December 2015Final Cost: $89,039

Resurfacing of Chalan Lumasu (Chalan Guagua to Route 3), (Maintenance)Contractor: Hawaiian Rock ProductsCompleted: October 2015Final Cost: $186,935

Chalan Balako Resurfacing (Maintenance)Contractor: DPW & Hawaiian Rock ProductsCompleted: March 2017Final Cost: $201,139

Flood Mitigation of Lot 6-1, Block 2, Barrigada, Route 8, Design-Build (Maintenance)Contractor: ProPacific Builder CorporationCompleted: January 2018Final Cost: $108,985

Route 16 Pavement Markings Restoration (Route 1 to Tri-Intersection), (Maintenance)Contractor: DPW – HMCCompleted: February 2018Final Cost: $34,450

Route 3 Pavement Markings Restoration, GRMC to Y-Sengsong, (Maintenance)Contractor: DPW – HMCCompleted: December 2017Final Cost: $19,650

Gill Baza Access Road, Paving & Markings (Maintenance)Contractor: NIPPOCompleted: July 2012Final Cost: $210,202

7

11

610

12

7

416

21

22

17

24

14

3

4

25

8

20

1

19 18

6

235 8

30

28

29 309

21

3

COMPLETED PROJECTSValued at $2.27MLocally fundedJUNE 2019

1

Hector Ramos

Recommended